CY-04-178, Response to Order for Implementation of Additional Security Measures Associated with Access Authorization, Fitness for Duty and Behavior Observation

From kanterella
Jump to navigation Jump to search
Response to Order for Implementation of Additional Security Measures Associated with Access Authorization, Fitness for Duty and Behavior Observation
ML042540079
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/02/2004
From: Norton W
Connecticut Yankee Atomic Power Co
To:
Document Control Desk, NRC/FSME
References
-RFPFR, CY-04-178, EA-03-099, FOIA/PA-2005-0203
Download: ML042540079 (2)


Text

I; o CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD

  • EAST HAMPTON, CT 06424-3099 September 2, 2004 Docket No. 50-213 License No. DPR-61 CY-04-178 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Haddam Neck Plant Response to Order for Implementation of Additional Security Measures Associated with Access Authorization, Fitness for Duty and Behavior Observation for the Haddam Neck Plant On August 18, 20041 the NRC Staff issued an order modifying Haddam Neck Plant's current license to require compliance with the additional security measures (ASMs).

Connecticut Yankee Atomic Power Company's (CYAPCO's) response to the Order is contained in the attachment to this letter.

Of special note, CYAPCO is engaged in an on-going spent fuel dry cask transfer campaign which has schedule and implementation implications that are discussed in the attachment.

This cover letter when separated from Attachment 1 is not Safeguards Information. to this cover letter contains Safeguards Information of a type specified in 10CFR73.21 and should be withheld from public disclosure. Inaccordance with IOCFR2.790, a copy of this cover letter, less enclosures, may be placed in the NRC Public Document Room.

Letter, M. Federline to K. Heider, 'Issuance or Order for Implementation of Additional Security Measures Associated with Access Authorization, Fitness for Duty and Behavior Observation for Haddam Neck Plant" EA-03-099, August 18, 2004.

Enclosures to this cover letter contain Safeguards Information.

Upon removal of enclosures, this cover letter is decontrolled. X is' y~AllX Beeat'

U.S. Nuclear Regulatory Commission CY-04-178/Page 2 If the NRC Staff should have any questions regarding this submittal, please contact Mr. G. P. van Noordennen at (860) 267-3938.

Sincerely, ATOMIC POWER COMPANY Subscribed and sworn before me this a day of smL , anew

- 'Notary Public My Commission Expires , *? - soOq Attachment cc w/o attachments:

R. R. Bellamy, NRC Branch Chief, Decommissioning and Laboratory Branch J. E. Dyer, NRC, Director Office of Nuclear Reactor Regulation T. B. Smith, NRC Sr. Project Manager, Haddam Neck Plant S. J. Collins, NRC Region I Administrator M. V. Federline, NRC Deputy Director Office of Material Safety and Safeguards Enclosures to this cover letter contain Safeauards Information.

Upon removal of enclosures, this cover letter is decontrolled.