CNL-21-027, Correction to Organization Topical Report, TVA-NPOD89-A

From kanterella
Jump to navigation Jump to search
Correction to Organization Topical Report, TVA-NPOD89-A
ML21050A266
Person / Time
Site: Browns Ferry, Watts Bar, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/19/2021
From: Polickoski J
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNL-21-027
Download: ML21050A266 (4)


Text

1101 Market Street, Chattanooga, Tennessee 37402 CNL-21-027 February 19, 2021 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390 and 50-391

Subject:

Correction to Organization Topical Report, TVA-NPOD89-A

Reference:

TVA letter to NRC, CNL-21-007, Organization Topical Report, TVA-NPOD89-A, dated January 29, 2021 (ML21029A337)

The Reference letter submitted Revision 24 of the Tennessee Valley Authoritys Organization Topical Report, TVA-NPOD89-A (the report) pursuant to Title 10 of the Code of Federal Regulations, Part 50.71(e). This letter provides a correction to the report.

Figure 3 in the report mistakenly displays the organizational location of the position General Manager Nuclear Projects. This position no longer reports to the Vice President Nuclear Engineering and now reports to the Vice President Nuclear Projects. The descriptions of these vice presidents responsibilities in the referenced report did correctly address this new reporting relationship (figure error only). The corrected figure is enclosed.

U.S. Nuclear Regulatory Commission CNL-21-027 Page 2 February 19, 2021 There are no new regulatory commitments contained in this letter. If you have any questions regarding this submittal, please contact Kimberly D. Hulvey, Senior Manager, Fleet Licensing at (423) 751-3275.

Respectfully, James T. Polickoski Director, Nuclear Regulatory Affairs Enclosure cc:

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Browns Ferry Nuclear Plant NRC Project Manager - Sequoyah Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant

Enclosure Corrected Figure 3 of Organization Topical Report, TVA-NPOD89-A CNL-21-027

Topical Report TVA-NPOD89-A Rev. 24 Figure 3: Vice President Nuclear Engineering Vice President Nuclear Engineering General Manager Director Director Reactor Design &

Plant & Programs Engineering Computer Engineering

& Fuels Engineering