BVY 13-069, Response to Regulatory Issue Summary 2013-06

From kanterella
Jump to navigation Jump to search
Response to Regulatory Issue Summary 2013-06
ML13218A262
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/31/2013
From: Wanczyk R
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY 13-069, RIS-13-006
Download: ML13218A262 (3)


Text

Entergy Nuclear Operations, Inc.

Vermont Yankee 320 Governor Hunt Road Vernon, VT 05354 SfEntergy Tel 802 257 7711 Robert J. Wanczyk Manager, Licensing BVY 13-069 July 31, 2013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Response to Regulatory Issue Summary 2013-06 Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28

REFERENCE:

(1) Letter, NRC to VY, "NRC Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations,"

dated June 7, 2013

Dear Sir or Madam,

In response to your request for information (Reference 1), Vermont Yankee submits the attached NRC Form 536. Form 536 summarizes our projected site-specific operator licensing examination schedules, as well as the estimated number of applicants forecasted to take operator licensing and the NRC's generic fundamentals examinations.

There are no new regulatory commitments being made in this submittal.

Should you have any questions concerning this submittal, please contact me at (802) 451-3166.

Sii

. Ate

[RJW/BLE]

Enclosure:

NRC Form 536 (1 page) cc list: next page ftkoo3 NVwLf2-

BVY 13-069 / Page 2 of 2 cc: William Dean, Region 1 Administrator U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. Donald Jackson, Chief Operator Licensing and Human Resources U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Mr. Richard Guzman, Project Manager U.S. Nuclear Regulatory Commission Mail Stop 0 8 C2A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee 320 Governor Hunt Road Vernon, Vermont 05354 Mr. Christopher Recchia, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 0913012014 09-2011) Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (r-5 F53). US. Nuclear Regulatory Co*imssion. Wauhington. 00 20555-0001, or byintenet e-EXAMINATION DATA mail to lnfocollects.Resourceenrc gov, and to the Desk Officer, Office of Inforrnation and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget. Washington, DC 20503 Ifa means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person isnot required to respond to, the Inlormation collection.

FACILITY NRC REGION Entergy Vermont Yankee A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 3 3 0 3 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018 NUMBER OF REACTOR I1 8 0 8 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE 3/16/2015 10/24/2016 7/16/2018 ALTERNATE DATE 3/23/2016 10/31 / 2016 7/23/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE