Other: BSEP 10-0118, ANP-2950NP, Revision 0, Atrium 10XM Fuel Rod Thermal and Mechanical Evaluation for Brunswick Unit 2 Cycle 20 Reload BRK2-20, BSEP 10-0126, ANP-2956(NP), Rev. 0, Brunswick Unit 2 Cycle 20 Reload Safety Analysis, Enclosure 6 to BSEP 10-0126, BSEP 11-0031, Areva Report ANP-2992NP, Revision 0, Areva Response to Additional RAI on the Brunswick RODEX4 LAR, BSEP 12-0018, Submittal of Confirmatory Evaluation for Cycle 19, BSEP 13-0004, Operability Assessment (CR 2012-8084 Revision 1) Identified an Issue with the Approved ACE Correlation for the Atrium 10XM Fuel Design with Regard to the Calculation of K-factor within the AEC Correlation, ML103260322, ML11102A048, ML11102A050, ML13037A314
|
MONTHYEARBSEP 10-0052, Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report2010-04-29029 April 2010 Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report Project stage: Request BSEP 10-0057, Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report2010-04-29029 April 2010 Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report Project stage: Request ML1015202652010-06-0101 June 2010 Acceptance Review of TACs ME3856 - ME3859 Project stage: Acceptance Review BSEP 10-0092, Response to Regulatory Issue Summary 2010-08 Concerning Preparation and Scheduling of Operator Licensing Examinations2010-07-29029 July 2010 Response to Regulatory Issue Summary 2010-08 Concerning Preparation and Scheduling of Operator Licensing Examinations Project stage: Request BSEP 10-0112, ANP-2943(NP), Revision 0, Brunswick Units 1 and 2, LOCA-ECCS Analysis MAPLHGR Limit for Atrium 10XM Fuel2010-09-29029 September 2010 ANP-2943(NP), Revision 0, Brunswick Units 1 and 2, LOCA-ECCS Analysis MAPLHGR Limit for Atrium 10XM Fuel Project stage: Request ML1029205512010-10-12012 October 2010 Units, 1 and 2, Additional Information Supporting License Amendment Requests - Atrium 10XM Fuel Rod Thermal and Mechanical Evaluation for Unit 2, Cycle 20 Project stage: Request BSEP 10-0118, ANP-2950NP, Revision 0, Atrium 10XM Fuel Rod Thermal and Mechanical Evaluation for Brunswick Unit 2 Cycle 20 Reload BRK2-202010-10-12012 October 2010 ANP-2950NP, Revision 0, Atrium 10XM Fuel Rod Thermal and Mechanical Evaluation for Brunswick Unit 2 Cycle 20 Reload BRK2-20 Project stage: Other ML1029101672010-10-28028 October 2010 RAI Regarding License Amendment Requests for Addition of Analytical Methodology Topical Reports to TS 5.6.5, Core Operating Limits Report Project stage: RAI BSEP 10-0126, ANP-2956(NP), Rev. 0, Brunswick Unit 2 Cycle 20 Reload Safety Analysis, Enclosure 6 to BSEP 10-01262010-10-31031 October 2010 ANP-2956(NP), Rev. 0, Brunswick Unit 2 Cycle 20 Reload Safety Analysis, Enclosure 6 to BSEP 10-0126 Project stage: Other ML1032603222010-10-31031 October 2010 ANP-2948NP, Rev. 0, Mechanical Design Report for Brunswick Atrium 10XM Fuel Assemblies, Enclosure 3 to BSEP 10-0126 Project stage: Other ML1032603152010-11-0909 November 2010 Additional Information Supporting License Amendment Requests for Mechanical Design Report for Atrium 10XM Fuel Assemblies & Reload Safety Analysis Report for Unit 2 Cycle 20 Project stage: Request BSEP 10-0128, Independent Spent Fuel Storage Installation - Registration and Use of Casks to Store Spent Fuel and System Thermal Performance Assessment Notification2010-11-0909 November 2010 Independent Spent Fuel Storage Installation - Registration and Use of Casks to Store Spent Fuel and System Thermal Performance Assessment Notification Project stage: Request BSEP 10-0133, Response to Additional Information Request Supporting License Amendment Requests for Addition of Analytical Methodology Topical Reports to Technical Specification 5.6.5 (NRC TAC Nos. ME3856, ME3857, ME3858, and ME3859)2010-11-18018 November 2010 Response to Additional Information Request Supporting License Amendment Requests for Addition of Analytical Methodology Topical Reports to Technical Specification 5.6.5 (NRC TAC Nos. ME3856, ME3857, ME3858, and ME3859) Project stage: Request ML1036303342010-12-16016 December 2010 Response to Request for Additional Information Regarding License Amendment Requests for Addition of Analytical Methodology Topical Reports to Technical Specification 5.6.5 (NRC TAC Nos. ME3856, ME3857, ME3858, and ME3859) Project stage: Response to RAI BSEP 10-0141, ANP-2978NP, Rev. 0, Areva Responses to RAIs on the Atrium 10XM Compliance Audit and Brunswick Lars2010-12-16016 December 2010 ANP-2978NP, Rev. 0, Areva Responses to RAIs on the Atrium 10XM Compliance Audit and Brunswick Lars Project stage: Response to RAI ML1101004612011-01-26026 January 2011 Request for Withholding Information from Public Disclosure (TAC Nos. ME3856, ME3857, ME3858, & ME3859) Project stage: Withholding Request Acceptance ML1101005352011-01-26026 January 2011 Request for Withholding Information from Public Disclosure (TAC Nos. ME3856, ME3857, ME3858, & ME3859) Project stage: Withholding Request Acceptance ML1101004272011-01-26026 January 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1101004352011-01-26026 January 2011 Request for Withholding Information from Public Disclosure (TAC Nos. ME3856, ME3857, ME3858, & ME3859) Project stage: Withholding Request Acceptance ML1101004482011-01-26026 January 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1101005002011-01-26026 January 2011 Request for Withholding Information from Public Disclosure (TAC Nos. ME3856, ME3857, ME3858, & ME3859) Project stage: Withholding Request Acceptance ML1108202352011-03-16016 March 2011 Response to Request for Additional Information Regarding License Amendment Request for Addition of Analytical Methodology Topical Reports to Technical Specification 5.6.5 (NRC TAC Nos. ME3858 and ME3859) Project stage: Response to RAI BSEP 11-0031, Areva Report ANP-2992NP, Revision 0, Areva Response to Additional RAI on the Brunswick RODEX4 LAR2011-03-31031 March 2011 Areva Report ANP-2992NP, Revision 0, Areva Response to Additional RAI on the Brunswick RODEX4 LAR Project stage: Other BSEP 11-0040, Unit I & 2, Additional Information Supporting License Amendment Request to Add Analytical Methodology ANP-10298PA to Technical Specification 5.6.5,Core Operating Limits Report (COLR) (NRC TAC ME3856 & Me.2011-04-0606 April 2011 Unit I & 2, Additional Information Supporting License Amendment Request to Add Analytical Methodology ANP-10298PA to Technical Specification 5.6.5,Core Operating Limits Report (COLR) (NRC TAC ME3856 & Me. Project stage: Request ML11101A0432011-04-0808 April 2011 Issuance of Amendments Regarding Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5 (TAC Nos. ME3858 and ME3859) - Redacted Project stage: Approval BSEP 11-0038, Renewed Facility Operating License and Cycle 20 Core Operating Limits Report2011-04-0808 April 2011 Renewed Facility Operating License and Cycle 20 Core Operating Limits Report Project stage: Request ML1110102342011-04-0808 April 2011 Issuance of Amendments Regarding Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5 Project stage: Approval ML11102A0482011-04-12012 April 2011 Correction to Amendment No. 257 & 285 (TAC ME3856 & ME3857) Project stage: Other ML11102A0502011-04-12012 April 2011 Correction to Amendment No. 256 & 284 (TAC ME3858 & ME3859) Project stage: Other ML11091A0002011-04-14014 April 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML11089A0082011-04-14014 April 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML11097A0132011-04-15015 April 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML11097A0162011-04-15015 April 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance BSEP 12-0018, Submittal of Confirmatory Evaluation for Cycle 192012-01-26026 January 2012 Submittal of Confirmatory Evaluation for Cycle 19 Project stage: Other ML13037A3142013-01-29029 January 2013 Submittal of Confirmatory Evaluation for Unit 2 Cycle 21 Project stage: Other BSEP 13-0004, Operability Assessment (CR 2012-8084 Revision 1) Identified an Issue with the Approved ACE Correlation for the Atrium 10XM Fuel Design with Regard to the Calculation of K-factor within the AEC Correlation2013-01-29029 January 2013 Operability Assessment (CR 2012-8084 Revision 1) Identified an Issue with the Approved ACE Correlation for the Atrium 10XM Fuel Design with Regard to the Calculation of K-factor within the AEC Correlation Project stage: Other 2010-09-29
[Table View] |
Text
Progress Energy JUL 2 9 2010 SERIAL: BSEP 10-0092 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Response to Regulatory Issue Summary 2010-08 Concerning Preparation and Scheduling of Operator Licensing Examinations Ladies and Gentlemen:
On June 28, 2010, the NRC issued Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations, to request the voluntary submittal of information regarding future licensing examinations for operators. In response to that request, Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., is submitting the proposed operator licensing examination schedule for calendar years 2012 through 2015, for the Brunswick Steam Electric Plant (BSEP),
Unit Nos. 1 and 2. Also included are estimates for applicants planning to take the Generic Fundamentals Examination in calendar years 2010 and 2011. The information requested is provided on the enclosed NRC Form 536.
No regulatory commitments are contained in this letter. Please refer any questions regarding this submittal to Ms. Annette Pope, Supervisor - Licensing/Regulatory Programs, at (910) 457-2184.
Sincerely, Phyllis N. Mentel Manager - Support Services Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.
Brunswick Nuclear Plant PO Box 10429 Southport, NC 28461
Document Control Desk BSEP 10-0092 / Page 2 WRM/wrm
Enclosure:
NRC Form 536, Operator Licensing Examination Data cc (with enclosure):
U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Luis A. Reyes, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U. S. Nuclear Regulatory Commission ATTN: Mr. Philip B. O'Bryan, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission ATTN: Mr. Malcolm T. Widmann, NRC Region II Chief, Operations Branch 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission (Electronic Copy Only)
ATTN: Mrs. Farideh E. Saba (Mail Stop OWFN 8G9A) 11555 Rockville Pike Rockville, MD 20852-2738 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Brunswick Steam Electric Plant, Units I and 2 2
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 Cy 2 0 13 Cy 2014 Cy 2015 NUMBER OF REACTOR 9
0 6
0 OPERATORS NUMBER OF SENIOR REACTOR 1
0 3
0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 2
0 3
0 NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 11/5-16/2012 N/A 9/8-19/2014 N/A ALTERNATE DATE 12/3-14/2012 N/A 10/6-17/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
0 0
10 0
0 CANDIDATES NRC FORM 536 (10-2008)
PRINTED ON REC.YCLEPr PAPrR