Other: BSEP 10-0118, ANP-2950NP, Revision 0, Atrium 10XM Fuel Rod Thermal and Mechanical Evaluation for Brunswick Unit 2 Cycle 20 Reload BRK2-20, BSEP 10-0126, ANP-2956(NP), Rev. 0, Brunswick Unit 2 Cycle 20 Reload Safety Analysis, Enclosure 6 to BSEP 10-0126, BSEP 11-0031, Areva Report ANP-2992NP, Revision 0, Areva Response to Additional RAI on the Brunswick RODEX4 LAR, BSEP 12-0018, Submittal of Confirmatory Evaluation for Cycle 19, BSEP 13-0004, Operability Assessment (CR 2012-8084 Revision 1) Identified an Issue with the Approved ACE Correlation for the Atrium 10XM Fuel Design with Regard to the Calculation of K-factor within the AEC Correlation, ML103260322, ML11102A048, ML11102A050, ML13037A314
|
MONTHYEARBSEP 10-0052, Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report2010-04-29029 April 2010 Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report Project stage: Request BSEP 10-0057, Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report2010-04-29029 April 2010 Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report Project stage: Request ML1015202652010-06-0101 June 2010 Acceptance Review of TACs ME3856 - ME3859 Project stage: Acceptance Review BSEP 10-0092, Response to Regulatory Issue Summary 2010-08 Concerning Preparation and Scheduling of Operator Licensing Examinations2010-07-29029 July 2010 Response to Regulatory Issue Summary 2010-08 Concerning Preparation and Scheduling of Operator Licensing Examinations Project stage: Request BSEP 10-0112, ANP-2943(NP), Revision 0, Brunswick Units 1 and 2, LOCA-ECCS Analysis MAPLHGR Limit for Atrium 10XM Fuel2010-09-29029 September 2010 ANP-2943(NP), Revision 0, Brunswick Units 1 and 2, LOCA-ECCS Analysis MAPLHGR Limit for Atrium 10XM Fuel Project stage: Request ML1029205512010-10-12012 October 2010 Units, 1 and 2, Additional Information Supporting License Amendment Requests - Atrium 10XM Fuel Rod Thermal and Mechanical Evaluation for Unit 2, Cycle 20 Project stage: Request BSEP 10-0118, ANP-2950NP, Revision 0, Atrium 10XM Fuel Rod Thermal and Mechanical Evaluation for Brunswick Unit 2 Cycle 20 Reload BRK2-202010-10-12012 October 2010 ANP-2950NP, Revision 0, Atrium 10XM Fuel Rod Thermal and Mechanical Evaluation for Brunswick Unit 2 Cycle 20 Reload BRK2-20 Project stage: Other ML1029101672010-10-28028 October 2010 RAI Regarding License Amendment Requests for Addition of Analytical Methodology Topical Reports to TS 5.6.5, Core Operating Limits Report Project stage: RAI BSEP 10-0126, ANP-2956(NP), Rev. 0, Brunswick Unit 2 Cycle 20 Reload Safety Analysis, Enclosure 6 to BSEP 10-01262010-10-31031 October 2010 ANP-2956(NP), Rev. 0, Brunswick Unit 2 Cycle 20 Reload Safety Analysis, Enclosure 6 to BSEP 10-0126 Project stage: Other ML1032603222010-10-31031 October 2010 ANP-2948NP, Rev. 0, Mechanical Design Report for Brunswick Atrium 10XM Fuel Assemblies, Enclosure 3 to BSEP 10-0126 Project stage: Other ML1032603152010-11-0909 November 2010 Additional Information Supporting License Amendment Requests for Mechanical Design Report for Atrium 10XM Fuel Assemblies & Reload Safety Analysis Report for Unit 2 Cycle 20 Project stage: Request BSEP 10-0128, Independent Spent Fuel Storage Installation - Registration and Use of Casks to Store Spent Fuel and System Thermal Performance Assessment Notification2010-11-0909 November 2010 Independent Spent Fuel Storage Installation - Registration and Use of Casks to Store Spent Fuel and System Thermal Performance Assessment Notification Project stage: Request BSEP 10-0133, Response to Additional Information Request Supporting License Amendment Requests for Addition of Analytical Methodology Topical Reports to Technical Specification 5.6.5 (NRC TAC Nos. ME3856, ME3857, ME3858, and ME3859)2010-11-18018 November 2010 Response to Additional Information Request Supporting License Amendment Requests for Addition of Analytical Methodology Topical Reports to Technical Specification 5.6.5 (NRC TAC Nos. ME3856, ME3857, ME3858, and ME3859) Project stage: Request ML1036303342010-12-16016 December 2010 Response to Request for Additional Information Regarding License Amendment Requests for Addition of Analytical Methodology Topical Reports to Technical Specification 5.6.5 (NRC TAC Nos. ME3856, ME3857, ME3858, and ME3859) Project stage: Response to RAI BSEP 10-0141, ANP-2978NP, Rev. 0, Areva Responses to RAIs on the Atrium 10XM Compliance Audit and Brunswick Lars2010-12-16016 December 2010 ANP-2978NP, Rev. 0, Areva Responses to RAIs on the Atrium 10XM Compliance Audit and Brunswick Lars Project stage: Response to RAI ML1101004612011-01-26026 January 2011 Request for Withholding Information from Public Disclosure (TAC Nos. ME3856, ME3857, ME3858, & ME3859) Project stage: Withholding Request Acceptance ML1101005352011-01-26026 January 2011 Request for Withholding Information from Public Disclosure (TAC Nos. ME3856, ME3857, ME3858, & ME3859) Project stage: Withholding Request Acceptance ML1101004272011-01-26026 January 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1101004352011-01-26026 January 2011 Request for Withholding Information from Public Disclosure (TAC Nos. ME3856, ME3857, ME3858, & ME3859) Project stage: Withholding Request Acceptance ML1101004482011-01-26026 January 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1101005002011-01-26026 January 2011 Request for Withholding Information from Public Disclosure (TAC Nos. ME3856, ME3857, ME3858, & ME3859) Project stage: Withholding Request Acceptance ML1108202352011-03-16016 March 2011 Response to Request for Additional Information Regarding License Amendment Request for Addition of Analytical Methodology Topical Reports to Technical Specification 5.6.5 (NRC TAC Nos. ME3858 and ME3859) Project stage: Response to RAI BSEP 11-0031, Areva Report ANP-2992NP, Revision 0, Areva Response to Additional RAI on the Brunswick RODEX4 LAR2011-03-31031 March 2011 Areva Report ANP-2992NP, Revision 0, Areva Response to Additional RAI on the Brunswick RODEX4 LAR Project stage: Other BSEP 11-0040, Unit I & 2, Additional Information Supporting License Amendment Request to Add Analytical Methodology ANP-10298PA to Technical Specification 5.6.5,Core Operating Limits Report (COLR) (NRC TAC ME3856 & Me.2011-04-0606 April 2011 Unit I & 2, Additional Information Supporting License Amendment Request to Add Analytical Methodology ANP-10298PA to Technical Specification 5.6.5,Core Operating Limits Report (COLR) (NRC TAC ME3856 & Me. Project stage: Request ML11101A0432011-04-0808 April 2011 Issuance of Amendments Regarding Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5 (TAC Nos. ME3858 and ME3859) - Redacted Project stage: Approval BSEP 11-0038, Renewed Facility Operating License and Cycle 20 Core Operating Limits Report2011-04-0808 April 2011 Renewed Facility Operating License and Cycle 20 Core Operating Limits Report Project stage: Request ML1110102342011-04-0808 April 2011 Issuance of Amendments Regarding Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5 Project stage: Approval ML11102A0482011-04-12012 April 2011 Correction to Amendment No. 257 & 285 (TAC ME3856 & ME3857) Project stage: Other ML11102A0502011-04-12012 April 2011 Correction to Amendment No. 256 & 284 (TAC ME3858 & ME3859) Project stage: Other ML11091A0002011-04-14014 April 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML11089A0082011-04-14014 April 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML11097A0132011-04-15015 April 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML11097A0162011-04-15015 April 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance BSEP 12-0018, Submittal of Confirmatory Evaluation for Cycle 192012-01-26026 January 2012 Submittal of Confirmatory Evaluation for Cycle 19 Project stage: Other ML13037A3142013-01-29029 January 2013 Submittal of Confirmatory Evaluation for Unit 2 Cycle 21 Project stage: Other BSEP 13-0004, Operability Assessment (CR 2012-8084 Revision 1) Identified an Issue with the Approved ACE Correlation for the Atrium 10XM Fuel Design with Regard to the Calculation of K-factor within the AEC Correlation2013-01-29029 January 2013 Operability Assessment (CR 2012-8084 Revision 1) Identified an Issue with the Approved ACE Correlation for the Atrium 10XM Fuel Design with Regard to the Calculation of K-factor within the AEC Correlation Project stage: Other 2010-09-29
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 12, 2011 Mr. Michael J. Annacone, Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461 SUB..IECT:
BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - CORRECTION TO AMENDMENT NOS. 257 AND 285 (TAC NOS. ME3856 AND ME3857)
Dear Mr. Annacone:
By letter dated April 8, 2011, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment Nos. 257 and 285 to Renewed Facility Operating License Nos. DPR-71 and DPR-62 for Brunswick Steam Electric Plant, Units 1 and 2, respectively. The amendments were in response to your application dated April 29, 2010, as supplemented by letters dated June 9, July 22, July 29, September 29, October 12, November 9, November 18, and December 16, 2010, and April 6, 2011.
The April 8, 2011 letter stated that the NRC staff's safety evaluation (SE) contained proprietary information and, accordingly the NRC staff prepared a redacted, nonproprietary version. The letter also stated that we would delay placing the nonproprietary SE in the public document room for a period of 10 working days from the date of this letter to provide you with the opportunity to comment on any proprietary aspects. However, this process is not consistent with the NRC's procedure for issuing amendments. Also, the draft proprietary SE with markups for proprietary information had been reviewed by your staff for the proprietary information prior to issuance of the amendment Therefore, given the aforementioned reasons, the nonproprietary version of the SE was made public upon issuance of the amendments.
In addition, upon issuance of the amendments, the NRC staff noticed that the nonproprietary version of the SE was incorrectly marked as Enclosure 4, instead of Enclosure 3. The corrected page is enclosed.
We regret any inconvenience this may have caused. If you have any questions regarding this matter, please contact me at (301) 415-1447.
Sincerely, t:-t!;/1 'L~ c= ~
c;~ ~t.
Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324 cc w/enclosure: Distribution via ListServ
OFFICIAL USE ONLY PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 257 AND 285 TO RENEWED FACILITY OPERATING LICENSES NOS. DPR*71 AND DPR-62 CAROLINA POWER & LIGHT COMPANY BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 DOCKET NOS. 50*325 AND 50*324
1.0 INTRODUCTION
By application dated April 29. 2010 (Reference 1). as supplemented by letters dated June 9, July 22, July 29, September 29, October 12, November 9, November 18. and December 16, 2010, and April 6, 2011 (References 2 through 10, and Reference 39), Carolina Power & Light Company (CP&L, the licensee), requested license amendments to revise the Technical Specifications (TSs) for the Brunswick Steam Electric Plant (BSEP), Units 1 and 2.
The proposed license amendments will revise BSEP TS 5.6.5.b by adding the AREVA topical report, ANP-10298PA, "ACE/ATRIUM 10XM Critical Power Correlation," Revision 0, March 2010 (Reference 11), to the list of analytical methods that have been reviewed and approved by the Nuclear Regulatory Commission (NRC) for determining core operating limits. The proposed amendments would change the BSEP TSs to support transition to ATRIUM 10XM fuel and associated core design methodologies.
BSEP Units 1 and 2 are General Electric (GE) boiling water reactors (BWRs) BWR/4 design.
Both BSEP units are currently operating at 120 percent of originally licensed thermal power at extended power uprate and maximum extended load line limit analysis conditions. Each unit reactor core is composed of 560 fuel assemblies. In each cycle. approximately 40 percent of the irradiated fuel assemblies are replaced with new fuel. On March 27. 2008, the NRC issued Amendments Nos. 246 and 274 for transition from GE fuel to ATRIUM*10 fuel for BSEP Units 1 and 2, respectively (Reference 12). The first transition from GE fuel to ATRIUM*10 fuel occurred in spring 2008 and spring 2009, when the licensee loaded 248 and 238 fresh ATRIUM 10 fuel assemblies in BSEP Units 1 and 2, respectively.
The licensee plans to implement this amendment loading the ATRIUM 10XM fuel design in the BSEP Unit 2 during the spring 2011 refueling outage, beginning with Cycle 20. The BSEP Unit 1 amendment supporting transitioning to ATRIUM 10XM will be implemented during the spring 2012 refueling outage, beginning with Cycle 19.
The supplements dated June 9, July 29, September 29, October 12, November 9, November 18, and December 16, 2010, and April 6, 2011, provided additional information that clarified the application, did not expand the scope of the original Federal Register notice, did not change the OFFICIAL USE ONLY PROPRIETARY INFORMATION
ML11102A048 LPL2-2/PM LPL2-2/LA LPL2-2/BC OFFICE LPL2-2/PM NAME FSaba CSoia DBroaddus FSaba
r-------------+-------------~------------~I 04/12/11 04/12/11 04/12/11