Category:Letter type:BSEP
MONTHYEARBSEP 19-0012, Submittal of 2018 Sea Turtle Annual Report2019-01-17017 January 2019 Submittal of 2018 Sea Turtle Annual Report BSEP 18-0052, Annual Radiological Environmental Operating Report - 20172018-05-10010 May 2018 Annual Radiological Environmental Operating Report - 2017 BSEP 18-0051, Annual Radioactive Effluent Release Report - 20172018-04-26026 April 2018 Annual Radioactive Effluent Release Report - 2017 BSEP 18-0045, Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time2018-04-25025 April 2018 Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time BSEP 18-0054, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential.2018-04-24024 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential. BSEP 18-0048, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-04-11011 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-04-11011 April 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0046, Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-04-10010 April 2018 Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0047, Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test2018-04-0505 April 2018 Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test BSEP 18-0041, Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-04-0404 April 2018 Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 18-0043, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-03-31031 March 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0035, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-29029 March 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0042, Cycle 22 Core Operating Limits Report (COLR)2018-03-27027 March 2018 Cycle 22 Core Operating Limits Report (COLR) BSEP 18-0040, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test2018-03-23023 March 2018 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test BSEP 18-0039, Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D2018-03-19019 March 2018 Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D BSEP 18-0034, Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-16016 March 2018 Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0032, Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-14014 March 2018 Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0026, Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2018-03-0707 March 2018 Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 18-0014, Fifth 10-Year Inservice Testing Program Plan2018-02-19019 February 2018 Fifth 10-Year Inservice Testing Program Plan BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure2018-02-0505 February 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure BSEP 18-0017, Revision to Radiological Emergency Response Plan and Implementing Procedure2018-01-30030 January 2018 Revision to Radiological Emergency Response Plan and Implementing Procedure BSEP 18-0015, Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-01-23023 January 2018 Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-23023 January 2018 Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 18-0001, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements BSEP 18-0012, Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.32018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 BSEP 18-0009, 2017 Sea Turtle Annual Report2018-01-15015 January 2018 2017 Sea Turtle Annual Report BSEP 17-0098, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2018-01-10010 January 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors BSEP 17-0119, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program2018-01-10010 January 2018 Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program BSEP 17-0115, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-0404 January 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 17-0110, Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2017-12-20020 December 2017 Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination BSEP 17-0120, Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension..2017-12-12012 December 2017 Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension.. BSEP 17-0118, Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel..2017-12-0707 December 2017 Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel.. BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..2017-12-0606 December 2017 Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources.. BSEP 17-0116, Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of ..2017-12-0404 December 2017 Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of .. BSEP 17-0104, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2017-11-29029 November 2017 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-28028 November 2017 Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0109, Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And.2017-11-24024 November 2017 Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And. BSEP 17-0108, Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-22022 November 2017 Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0017, Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2017-11-15015 November 2017 Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material BSEP 17-0100, Fifth 10-Year Inservice Testing Interval2017-11-0202 November 2017 Fifth 10-Year Inservice Testing Interval BSEP 17-0089, Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0093, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.52017-10-0303 October 2017 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 BSEP 17-0076, Registration for Use of General License Spent Fuel Casks2017-09-0606 September 2017 Registration for Use of General License Spent Fuel Casks BSEP 17-0081, Revision to Radiological Emergency Response Plan Implementing Procedures2017-09-0505 September 2017 Revision to Radiological Emergency Response Plan Implementing Procedures BSEP 17-0039, Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements2017-08-15015 August 2017 Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements BSEP 17-0071, ISFSI - Registration for Use of General License Spent Fuel Casks2017-08-15015 August 2017 ISFSI - Registration for Use of General License Spent Fuel Casks BSEP 17-0064, Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N92017-07-10010 July 2017 Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N9 BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-06-29029 June 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. 2019-01-17
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARRA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .2023-08-17017 August 2023 License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to . RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility2021-12-14014 December 2021 William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility RA-21-0239, Application to Revise Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-12-0202 December 2021 Application to Revise Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RA-21-0272, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-11-0101 November 2021 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-21-0141, Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative2021-04-26026 April 2021 Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative RA-18-0183, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-04-0101 April 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-21-0009, Request for License Amendment - Standby Liquid Control (SLC) System Boron Solution Storage Tank Volume2021-02-23023 February 2021 Request for License Amendment - Standby Liquid Control (SLC) System Boron Solution Storage Tank Volume RA-20-0361, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, Dated September 24, 2020, ADAMS Accession Number ML20272A0912020-11-17017 November 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, Dated September 24, 2020, ADAMS Accession Number ML20272A091 RA-20-0165, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-24024 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RA-20-0127, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22020-07-27027 July 2020 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 RA-20-0142, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems2020-07-21021 July 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems RA-19-0437, Nos. 1 & 2 - License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Categorization Process2020-07-0909 July 2020 Nos. 1 & 2 - License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Categorization Process RA-19-0431, Application to Revise Technical Specifications to Adopt TSTF 564, Safety Limit MCPR2020-03-0909 March 2020 Application to Revise Technical Specifications to Adopt TSTF 564, Safety Limit MCPR ML20073F1862020-03-0606 March 2020 Issuance of Amendment Nos. 299 and 327 to Revise Technical Specification 5.6.5b to Allow Application of Advanced Framatome Atrium 11 Fuel Methodologies (EPID L-2018-LLA-0273) (Redacted) RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-19-0139, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-03-18018 March 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-19-0015, Request for License Amendment: Surveillance Requirements for Safety Relief Valves2019-03-0404 March 2019 Request for License Amendment: Surveillance Requirements for Safety Relief Valves RA-18-0148, License Amendment Request to Revise Units 1 and 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2019-02-27027 February 2019 License Amendment Request to Revise Units 1 and 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RA-18-0234, (Bsep), Unit Nos. 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-269, Allow Administrative Means of Position Verification for Locked or Sealed Valves.2018-12-14014 December 2018 (Bsep), Unit Nos. 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-269, Allow Administrative Means of Position Verification for Locked or Sealed Valves. ML18291A6282018-10-18018 October 2018 Request for License Amendment - Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation RA-18-0135, Request for License Amendment - Technical Specification 3.7.4, Control Room Air Conditioning (AC) System2018-08-30030 August 2018 Request for License Amendment - Technical Specification 3.7.4, Control Room Air Conditioning (AC) System RA-18-0073, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-06-28028 June 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0041, Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-04-0404 April 2018 Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 17-0098, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2018-01-10010 January 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-28028 November 2017 Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0108, Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-22022 November 2017 Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0017, Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2017-11-15015 November 2017 Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.52017-10-0303 October 2017 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-06-29029 June 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML17088A3962017-06-0707 June 2017 Issuance of Amendments Regarding Revisions of Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs BSEP 17-0020, Supplement - License Amendment Request Regarding Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program2017-02-27027 February 2017 Supplement - License Amendment Request Regarding Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program BSEP 16-0083, Steam Electric Plant, Units 1 And. 2 - Application to Revise Technical Specifications to Adopt TSTF-535, Revision O, Revise Shutdown Margin Definition to Address Advance Fuel Designs.2016-11-18018 November 2016 Steam Electric Plant, Units 1 And. 2 - Application to Revise Technical Specifications to Adopt TSTF-535, Revision O, Revise Shutdown Margin Definition to Address Advance Fuel Designs. BSEP 16-0082, Transmittal of Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2016-10-27027 October 2016 Transmittal of Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. BSEP 16-0087, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A.2016-09-28028 September 2016 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A. RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process ML16287A4222016-09-26026 September 2016 FS1-0028339 Revision 1.0, Brunswick, Unit 1, Cycle 21 and Unit 2 Cycle 23 MELLLA SLMCPR Analyses with SAFLIM30 Methodology. BSEP 16-0078, Request for License Amendment - Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit2016-09-26026 September 2016 Request for License Amendment - Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit BSEP 16-0014, Request for License Amendment-Reactor Protection System(Rps) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance Requirements (Srs) 3.3.8.2.2 and 3.3.8.2.32016-04-13013 April 2016 Request for License Amendment-Reactor Protection System(Rps) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance Requirements (Srs) 3.3.8.2.2 and 3.3.8.2.3 RA-15-0040, License Amendment Request, Change in Corporate Form of Duke Energy Progress2016-02-0101 February 2016 License Amendment Request, Change in Corporate Form of Duke Energy Progress BSEP 15-0101, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program2015-12-21021 December 2015 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 ML15175A4452015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6 ML15175A4422015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 3 of 6 RA-15-0006, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 62015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 6 ML15175A4392015-06-24024 June 2015 Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-523, Rev. 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 1 of 6 RA-15-0009, Supplement to Application for Order Approving Transfer of Control of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.902015-03-0404 March 2015 Supplement to Application for Order Approving Transfer of Control of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.90 BSEP 15-0007, Request for License Amendments - Adoption of Topical Report ANP-10298P-A, Revision 12015-02-19019 February 2015 Request for License Amendments - Adoption of Topical Report ANP-10298P-A, Revision 1 2023-08-17
[Table view] Category:Technical Specifications
MONTHYEARML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML21067A2242021-04-30030 April 2021 Issuance of Amendment Nos. 305 and 333 to Revise License Conditions to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RA-21-0141, Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative2021-04-26026 April 2021 Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative ML20069J6312020-03-19019 March 2020 Correction to Amendment No. 304 Regarding Request to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program ML19346C7922020-02-0606 February 2020 Issuance of Amendments Nos. 298 and 326 to Modify Technical Specification to Extend Containment Leakage Test Intervals BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-28028 November 2017 Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.52017-10-0303 October 2017 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 ML17180A5962017-08-29029 August 2017 Issuance of Amendments to Adopt TSTF-423 Technical Specifications End States, NEDC-32988-A ML17130A7802017-07-12012 July 2017 Issuance of Amendments Regarding Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-545 ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML16019A0292016-02-0909 February 2016 Issuance of Amendments Regarding the Adoption of Topical Report ANP-10298P-A, Revision 1 ML15344A1532016-01-0808 January 2016 Issuance of Amendments Regarding Emergency Action Level Scheme Upgrade BSEP 15-0007, Request for License Amendments - Adoption of Topical Report ANP-10298P-A, Revision 12015-02-19019 February 2015 Request for License Amendments - Adoption of Topical Report ANP-10298P-A, Revision 1 ML12339A0672012-12-18018 December 2012 Issuance of License Amendments Regarding Cyber Security BSEP 12-0050, Request for License Amendments - Diesel Generator (DG) Completion Time (CT) Extension for Technical Specification (TS) 3.8.1, AC Sources - Operating2012-06-19019 June 2012 Request for License Amendments - Diesel Generator (DG) Completion Time (CT) Extension for Technical Specification (TS) 3.8.1, AC Sources - Operating BSEP 09-0019, Application to Revise Technical Specifications Regarding Primary Containment Isolation Instrumentation in Accordance with TSTF-306, Revision 22009-10-27027 October 2009 Application to Revise Technical Specifications Regarding Primary Containment Isolation Instrumentation in Accordance with TSTF-306, Revision 2 ML0923702842009-08-18018 August 2009 Units, 1 and 2, Request for License Amendments to Revise Local Power Range Monitor Calibration Frequency BSEP-09-0026, Request for License Amendment - Technical Specification 3.6.1.6, Suppression Chamber-to-Drywell Vacuum Breakers.2009-03-0909 March 2009 Request for License Amendment - Technical Specification 3.6.1.6, Suppression Chamber-to-Drywell Vacuum Breakers. BSEP 08-0156, Request for License Amendment - Adoption of TSTF-478, Revision 2 - BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control2008-11-24024 November 2008 Request for License Amendment - Adoption of TSTF-478, Revision 2 - BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control ML0817503332008-07-25025 July 2008 Technical Specifications, Adopted TSTF-448, Revision 3, Control Room Habitability (Tac Nos. MD6336 and MD6337) ML0819801252008-07-0909 July 2008 Submittal of Updated Technical Specifications Pages Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using Consolidated Line Item Improvement Process BSEP 08-0037, Progress Energy Carolinas' Submittal of Revision to Technical Specification 3.2.3, Linear Heat Generation Rate as Part of License Amendments for the Brunswick Steam Electric Plant Units 1 & 22008-03-0505 March 2008 Progress Energy Carolinas' Submittal of Revision to Technical Specification 3.2.3, Linear Heat Generation Rate as Part of License Amendments for the Brunswick Steam Electric Plant Units 1 & 2 BSEP 07-0139, Response to Request for Additional Information Regarding Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 32008-02-27027 February 2008 Response to Request for Additional Information Regarding Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3 ML0801800872008-02-0808 February 2008 Technical Specifications ML0801800952008-02-0808 February 2008 Technical Specifications ML0733203672007-11-27027 November 2007 Technical Specifications, Issuance of Amendment Storage of Areva Np Fuel BSEP 07-0081, Request for License Amendments to Revise Technical Specification 5.5.6, Inservice Testing Program, to Adopt Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler TSTF-479, Revision 02007-09-26026 September 2007 Request for License Amendments to Revise Technical Specification 5.5.6, Inservice Testing Program, to Adopt Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler TSTF-479, Revision 0 BSEP 07-0103, Supplement to Request for License Amendment Technical Specification 3.8.3, Diesel Fuel Oil, Provisions for Main Fuel Oil Storage Tank Inspection, Cleaning, or Repair2007-09-20020 September 2007 Supplement to Request for License Amendment Technical Specification 3.8.3, Diesel Fuel Oil, Provisions for Main Fuel Oil Storage Tank Inspection, Cleaning, or Repair BSEP 07-0058, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-07-17017 July 2007 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0704705612007-02-15015 February 2007 Tech Spec Pages for Amendments 241 and 269 to Adopt TSTF-372 BSEP 06-0136, Request for License Amendment, Technical Specification 3.4.1, Recirculation Loops Operating Recirculation Loop Operating Requirements.2006-12-21021 December 2006 Request for License Amendment, Technical Specification 3.4.1, Recirculation Loops Operating Recirculation Loop Operating Requirements. BSEP 06-0067, Request for License Amendment, Technical Specification 3.8.3, Diesel Fuel Oil, Provisions for Main Fuel Oil Storage Tank Inspection, Cleaning, or Repair2006-09-28028 September 2006 Request for License Amendment, Technical Specification 3.8.3, Diesel Fuel Oil, Provisions for Main Fuel Oil Storage Tank Inspection, Cleaning, or Repair ML0521703612005-08-0505 August 2005 Technical Specifications, Correct Omitted Page BSEP 05-0076, Submittal of Updated Technical Specification Pages, Technical Specification 3.4.5, RCS Leakage Detection Instrumentation2005-06-0909 June 2005 Submittal of Updated Technical Specification Pages, Technical Specification 3.4.5, RCS Leakage Detection Instrumentation ML0515403142005-05-31031 May 2005 Technical Specification Pages Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency ML0515403132005-05-31031 May 2005 Technical Specification Pages Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency ML0516800952005-05-23023 May 2005 E-mail Brunswick Cooling Tower Information BSEP 05-0060, Request for License Amendment Technical Specification 3.4.5, RCS Leakage Detection Instrumentation.2005-05-17017 May 2005 Request for License Amendment Technical Specification 3.4.5, RCS Leakage Detection Instrumentation. ML0506601502005-03-0404 March 2005 Technical Specification Pages, Amendment on Addition of Tracg Methodology for Determining Core Operating Limits (Tac No. MC4385) ML0503905032005-02-0202 February 2005 Tech Spec Pages for Amendment No. 261 Elimination of Requirements for Hydrogen and Oxygen Monitors Using the Consolidated Line Item Improvement Process ML0504002762005-02-0202 February 2005 Tech Spec Pages for Amendment No. 234 Elimination of Requirements for Hydrogen and Oxygen Monitors Using the Consolidated Line Item Improvement Process ML0501202082005-01-11011 January 2005 Technical Specifications, Increase Flexibility in Mode Restraints ML0501202112005-01-11011 January 2005 Technical Specifications, Increase Flexibility in Mode Restraints BSEP 04-0124, Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2004-09-0303 September 2004 Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process ML0408906732004-03-26026 March 2004 Technical Specification Pages 2.0-1 and 5.0-20, Amendment No. 231 Re. Minimum Critical Power Ratio Safety Limit ML0336001152003-12-19019 December 2003 Application for Technical Specification Change Re Mode Change Limitations Using Consolidated Line Item Improvement Process BSEP 03-0148, Request for License Amendment Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ration Safety Limits and Revision to References in Technical Specification 5.6.5, Core Operating Limits Report2003-10-31031 October 2003 Request for License Amendment Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ration Safety Limits and Revision to References in Technical Specification 5.6.5, Core Operating Limits Report BSEP-03-0003, Radioactive Effluent Release Report for 2002, Index, Section 6 Through Appendix H2003-04-28028 April 2003 Radioactive Effluent Release Report for 2002, Index, Section 6 Through Appendix H ML0308706642003-03-25025 March 2003 Technical Specification Page for Amendment 254 to License DPR-62, Revising Safety Limit Minimum Critical Power Ratio Values from 1.09 to 1.11 2023-08-29
[Table view] |
Text
Progress Energy Cornelius J. Gannon Vice President Brunswick Nuclear Plant Progress Energy Carolinas, Inc.
May 17, 2005 SERIAL: BSEP 05-0060 10 CFR 50.90 TSC-2005-03 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Docket Nos. 50-525 and 50-324/License Nos. DPR-71 and DPR-62 Request for License Amendment Technical Specification 3.4.5, "RCS Leakage Detection Instrumentation"
Reference:
Letter from David H. Hinds to the U. S. Nuclear Regulatory Commission (Serial: BSEP 05-0059), "Request for Notice of Enforcement Discretion Technical Specification 3.4.5, "RCS Leakage Detection Instrumentation,"
dated May 13, 2005 Ladies and Gentlemen:
In accordance with the Code of Federal Regulations, Title 10, Part 50.90, Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc. (PEC), is requesting a revision to the Technical Specifications (TSs) for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2. The proposed change replaces the existing requirement of TS 3.4.5, "RCS Leakage Detection Instrumentation," Required Action D.1, to enter Limiting Condition for Operation (LCO) 3.0.3 if required leakage detection systems are inoperable with the requirement to be in Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and Mode 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. An evaluation of the proposed license amendment is provided in Enclosure 1.
On May 13, 2005, PEC submitted a written Notice of Enforcement Discretion request to waive compliance with Required Action D.1 of TS 3.4.5 for Unit 1. In this request, PEC committed to submit a follow-up amendment request, addressing the existing Required Action D.1 of TS 3.4.5, by May 17, 2005. This amendment request fulfills the commitment. As discussed in NRC Inspection Manual Part 9900, "Operations - Notices of Enforcement Discretion," and to alleviate the TS requirement which resulted in the NOED request, exigent processing of the proposed amendment is requested.
PEC has evaluated the proposed change in accordance with 10 CFR 50.91(a)(1), using the criteria in 10 CFR 50.92(c), and determined that this change involves no significant hazards considerations.
PEC is providing, in accordance with 10 CFR 50.91(b), a copy of the proposed license amendment to the designated representative for the State of North Carolina.
P.O.Box 10429 Southport, NC 28461 JAJn)b I T> 910.457.3698 F> 910.457.2803
Document Control Desk BSEP 05-0060 / Page 2 In order to allow time for orderly incorporation into copies of the TSs, PEC requests that the proposed license amendment, once approved by the NRC, be issued with an effective date of 60 days following approval.
No regulatory commitments are contained in this letter. Please refer any questions regarding this submittal to Mr. Edward T. O'Neil, Manager - Support Services, at (910) 457-3512.
I declare, under penalty of perjury, that the foregoing is true and correct. Executed on May 17, 2005.
Sincerely, Co s J. Gannon MAT/mat
Enclosures:
- 1. Evaluation of License Amendment Request
- 2. Marked-up Technical Specification Page - Unit 1
- 3. Typed Technical Specification Page - Unit 1
- 4. Typed Technical Specification Page - Unit 2
- 5. Marked-up Technical Specification Bases Page - Unit 1 (For Information Only)
Document Control Desk BSEP 05-0060 / Page 3 cc (with enclosures):
U. S. Nuclear Regulatory Commission, Region II ATTN: Dr. William D. Travers, Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission ATTN: Mr. Eugene M. DiPaolo, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission (Electronic Copy Only)
ATTN: Ms. Brenda L. Mozafari (Mail Stop OWFN 8G9) 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Jo A. Sanford Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 Ms. Beverly 0. Hall, Section Chief Radiation Protection Section, Division of Environmental Health North Carolina Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7221
BSEP 05-0060 Enclosure 1 Page 1 of 7 Evaluation of License Amendment Request
Subject:
Request for License Amendment Technical Specification 3.4.5, "RCS Leakage Detection Instrumentation" 1.0 Description This letter is a request by Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc. (PEC), to amend Operating Licenses DPR-71 and DPR-62 for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2.
The proposed change replaces the existing requirement of Technical Specification (TS) 3.4.5, Required Action D. 1, to enter Limiting Condition for Operation (LCO) 3.0.3 if required Reactor Coolant System (RCS) leakage detection systems are inoperable. In lieu of entry into LCO 3.0.3, the unit will be placed in Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in Mode 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
2.0 Proposed Change The proposed change replaces the existing requirement of TS 3.4.5, Required Action D.1, to enter LCO 3.0.3 if required leakage detection systems are inoperable with the requirement to be in Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and Mode 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. This is accomplished by deleting Condition D and including the "all required leakage detection systems inoperable" statement in Condition C. The following table illustrates the proposed changes.
Proposed Technical Specification Change Existing Requirements - Conditions C and D of TS 3.4.5 CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion AND Time of Condition A or B not met. C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> D. All required leakage D.1 Enter LCO 3.0.3. Immediately detection systems inoperable.
. .[i .4iL , .
BSEP 05-0060 Enclosure 1 I, , Page 2 of 7 Proposed Requirement - Condition C of TS 3.4.5 CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion AND Time of Condition A or B A not met. C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR All required leakage detection systems inoperable.
For convenience, Enclosure 2 contains a marked-up version of the Unit 1 TSs showing the proposed changes. Since TS Section 3.4.5 for Unit 1 and Unit 2 are identical, only the mark-up for Unit 1 is provided. Enclosures 3 and 4 provide typed versions of the Unit 1 and Unit 2 TSs, respectively. These typed TS pages are to be used for issuance of the proposed amendment.
PEC will make supporting changes to the TS Bases in accordance with TS 5.5.10, "Technical Specifications (TS) Bases Control Program." Enclosure 5 provides marked-up TS Bases pages for Unit 1. These pages are being submitted for information only and do not require issuance by the NRC.
3.0 Background On May 13, 2005, PEC submitted a written Notice of Enforcement Discretion (NOED) (i.e.,
Reference 1) request to waive compliance with Required Action D.1 of TS 3.4.5 for Unit 1. The need for the NOED arose when Emergency Bus El tripped unexpectedly, ultimately resulting in inoperability of the Reactor Coolant System (RCS) leakage detection systems. The requested NOED waived compliance with Required Action D.1 of TS 3.4.5. In lieu of the requirements of TS 3.4.5, Required Action D.1, PEC proposed Unit 1 continue to adhere to the requirements of TS 3.8.7, "Distribution Systems - Operating," which required the unit to be in Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and Mode 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The verbal NOED was verbally granted by the NRC on*
May 12, 2005, in response to PEC's May 12, 2005, verbal NOED request. On May 12, 2005, Unit 1 restored operability to the RCS leakage detection systems and exited TS 3.4.5.
In the May 13, 2005, written NOED request, PEC committed to submit a follow-up amendment request, addressing the existing Required Action D.1 of TS 3.4.5, by May 17, 2005. This amendment request fulfills the commitment. As discussed in NRC Inspection Manual Part 9900, "Operations - Notices of Enforcement Discretion," and to alleviate the TS requirement which resulted in the NOED request, exigent processing of the proposed amendment is requested.
r ;BSEP 05-0060 Enclosure 1 Page 3 of 7 Section 5.2.5, "Detection of Leakage Through Reactor Coolant System Boundary," of the BSEP Updated Final Safety Analysis Report (UFSAR) provides details associated with the leakage detection systems in use at BSEP. TS 3.4.5 establishes LCOs for three of these systems: (1) the drywell floor drain sump flow monitoring system, (2) the primary containment atmosphere particulate monitoring system, and (3) the primary containment atmosphere gaseous monitoring system. Each of the TS 3.4.5 required leakage detection systems is designed with the capability of detecting leakage less than the leakage rate limits established in TS 3.4.4, "RCS Operational Leakage," and providing appropriate alarm and/or indication of excess leakage in the control room.
As discussed in the UFSAR, drywell pressure, drywell temperature, cooling water temperature to and from the primary containment atmosphere coolers, and reactor water level also provide a means for detecting leaks within the primary containment.
The purpose of this amendment request is to alleviate the unnecessarily restrictive shutdown requirement of TS 3.4.5, Required Action D. 1, which led to the need to seek enforcement discretion from this requirement for Unit 1.
4.0 Technical Analysis The existing TS 3.4.5, Required Action D. 1,places the plant in Mode 2 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, Mode 3 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />, and Mode 4 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> (i.e., the LCO 3.0.3 shutdown completion times) if all required leakage detection systems are inoperable. The proposed amendment would place the plant in Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and Mode 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> under the same conditions. This is essentially the same completion times as currently exist, with the exception of eliminating the 7 hour8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> to Mode 2 requirement. The net effect would be to allow a unit to operate for five additional hours in Mode 1 (i.e., 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to be in Mode 3 versus 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> to be in Mode 2) with no operable TS required leakage detection systems. Additionally, the Modes of Applicability for TS 3.4.5 are Modes 1,2, and 3. The proposed change results in exiting the Modes of Applicability for RCS leakage detection instrumentation one hour earlier (i.e., 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> to be in Mode 4 versus 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> per the existing TS 3.4.5, Required Action D.1).
The proposed shutdown requirements and completion times for inoperability of the TS 3.4.5 required leakage detection systems will remain as conservative as those currently imposed by TS 3.4.4 for actual RCS operational leakage in excess of TS requirements. TS 3.4.4, Required Action A.1, allows 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to reduce RCS leakage to within limits if actual leakage occurs in excess of the established TS limits. If this is not accomplished or if pressure boundary leakage exists, the plant must be brought to Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and Mode 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> in accordance with TS 3.4.4, Required Actions B.1 and B.2. The Bases for Required Actions B.1 and B.2 state that allowed completion times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant safety systems.
BSEP 05-0060 Enclosure 1 Page 4 of 7 The Bases for TS 3.4.5, Required Action D.1, states that with all required RCS leakage detection monitors inoperable, no required automatic means of monitoring leakage are available, and immediate plant shutdown in accordance with LCO 3.0.3 is required. However, loss of all TS required RCS leakage monitoring capability is clearly a less degraded condition than experiencing actual RCS leakage in excess of TS established limits. In addition, although not required by TSs, drywell pressure, drywell temperature, cooling water temperature to and from the primary containment atmosphere coolers, and reactor water level also provide a means for detecting leaks within the primary containment. In the unlikely event of increased RCS leakage, abnormal operating procedure OAOP-014, "Abnormal Primary Containment Conditions,"
provides direction to control room operators regarding response to symptoms such as increased drywell temperature and pressure. In addition, Emergency Core Cooling System (ECCS),
Reactor Protection System (RPS) and primary and secondary containment isolation automatic actuations all occur based on high drywell pressure and/or low vessel water level. These systems continue to be available to mitigate the consequences of a loss-of-coolant event.
In summary, the proposed change eliminates the unnecessarily restrictive shutdown requirements of entering LCO 3.0.3 when all TS required leakage detection systems are inoperable while maintaining the existing level of safety by imposing shutdown requirements that are as conservative as those currently imposed by TS 3.4.4 for actual RCS operational leakage in excess of TS requirements. The net effect of this change is to allow a unit to operate for five additional hours in Mode 1, while exiting the Modes of Applicability for RCS leakage detection instrumentation one hour earlier (i.e., 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> to be in Mode 4 versus 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> per the existing TS 3.4.5, Required Action D.1). Elimination of the intermediate 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> to Mode 2 requirement, imposed by LCO 3.0.3, allows the unit to reach the Mode 3 from full power conditions in an orderly manner and without challenging plant safety systems.
5.0 Regulatory Safety Analysis 5.1 No Significant Hazards Consideration PEC has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed change replaces the existing requirement of TS 3.4.5, Required Action D.1 to enter LCO 3.0.3 if required leakage detection systems are inoperable with the requirement to be in Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and Mode 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. This is
BSEP 05-0060 Enclosure 1 Page 5 of 7 accomplished by deleting Condition D and including the "all required leakage detection systems inoperable" statement in Condition C.
The proposed change does not involve physical changes to any plant structure, system, or component. As a result, no new failure modes of the RCS leakage detection systems are being introduced. Additionally, the RCS leakage detection systems have no impact on any initiating event frequency. Therefore, the proposed change cannot increase in the probability a previously evaluated accident.
The consequences of a previously analyzed accident are dependent on the initial conditions assumed for the analysis, the behavior of the fuel during the analyzed accident, the availability and successful functioning of the equipment assumed to operate in response to the analyzed event, and the setpoints at which these actions are initiated. The RCS leakage detection systems do not perform an accident mitigating function. ECCS, RPS, and primary and secondary containment isolation actuations all occur based on high drywell pressure and/or low vessel water level. The proposed change has no impact on any setpoints or functions related to these actuations. Therefore, the proposed change cannot increase in the consequences a previously evaluated accident.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed change eliminates the unnecessarily restrictive shutdown requirements of entering LCO 3.0.3 when all TS required leakage detection systems are inoperable. No installed equipment is being operated in a different manner. There is no alteration to the parameters within which the plant is normally operated or in the setpoints that initiate protective or mitigative actions. As a result no new failure modes are being introduced.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No The proposed change maintains the existing level of safety by imposing shutdown requirements that are as conservative as those currently imposed by TS 3.4.4 for actual RCS operational leakage in excess of TS requirements. The net effect of this change is to allow a unit to operate for five additional hours in Mode 1 with no operable TS required leakage detection systems, while exiting the Mode of Applicability for RCS leakage detection instrumentation one hour earlier (i.e., 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> to be in Mode 4 versus 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> per the existingTS 3.4.5, Required Action D.1). Elimination of the intermediate 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> to
- r BSEP 05-0060 Enclosure 1 Page 6 of 7 Mode 2 requirement, imposed by LCO 3.0.3, allows the unit to reach the Mode 3 from full power conditions in an orderly manner and without challenging plant safety systems.
Therefore, the proposed change does not result in a significant reduction in the margin of safety.
Based on the above, PEC concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
5.2 Applicable Regulatorv Requirements/Criteria The BSEP design was reviewed for construction under the "General Design Criteria for Nuclear Power Plant Construction" issued for comment by the Atomic Energy Commission in July 1967 and is committed to meet the intent of the General Design Criteria (GDC), published in the Federal Register on May 21, 1971 as Appendix A to 10 CFR Part 50. Criterion 30, "Quality of reactor coolant pressure boundary," requires that means be provided for detecting and, to the extent practical, identifying the location of the source of reactor coolant leakage.
Regulatory Guide (RG) 1.45, "Reactor Coolant Pressure Boundary Leakage Detection Systems" describes acceptable methods of implementing this requirement with regard to the selection of leakage detection systems for the reactor coolant boundary. The position of RG 1.45 is that at least three different detection methods should be employed. Two of these methods should be:
(1) sump level and flow monitoring and, (2) airborne particulate radioactivity monitoring. The third method may involve either monitoring of condensate flow rate from air coolers or monitoring of gaseous radioactivity. The regulatory guide recommends that the sensitivity and response time of each leakage detection system employed for unidentified leakage should be adequate to detect a leakage rate, or its equivalent, of one gallon per minute (gpm) in less than one hour.
The proposed change eliminates the unnecessarily restrictive shutdown requirements of entering LCO 3.0.3 when all TS required leakage detection systems are inoperable. The proposed change does not involve physical changes to the RCS leakage detection systems. The RCS leakage detection systems are not being operated in a different manner as a result of the proposed change.
The design function of the RCS leakage detection systems is not affected by the proposed change.
Based on the considerations discussed above: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
BSEP 05-0060 Enclosure 1 Page 7 of 7 6.0 Environmental Considerations 10 CFR 51.22(c)(9) identifies certain licensing and regulatory actions, which are eligible for categorical exclusion from the requirement to perform an environmental assessment. A proposed amendment to an operating license for a facility does not require an environmental assessment if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration; (2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite; or (3) result in a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
7.0 References
- 1. Letter from David H. Hinds to the U. S. Nuclear Regulatory Commission (Serial:
BSEP 05-0059), "Request for Notice of Enforcement Discretion Technical Specification 3.4.5, "RCS Leakage Detection Instrumentation," dated May 13, 2005
BSEP 05-0060 Enclosure 2 Marked-up Technical Specification Page - Unit I
RCS Leakage Detection Instrumentation 3.4.5 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. Required primary ------ NOTE------
containment atmosphere LCO 3.0.4 is not applicable.
radioactivity monitoring system inoperable.
B.1 Analyze grab samples of Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> primary containment atmosphere.
AND B.2 Restore required primary 30 days containment atmosphere radioactivity monitoring system to OPERABLE status.
C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or B not met. AND C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> AH~fequire leaeIge~e DA StFIG .. &!nndee
- 4etiornsyes Brunswick Unit 1 3.4-10 Amendment No.-2
BSEP 05-0060 Enclosure 3 Typed Technical Specification Page - Unit 1
RCS Leakage Detection Instrumentation 3.4.5 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. Required primary ------------------ NOTE---------------------
containment atmosphere LCO 3.0.4 is not applicable.
radioactivity monitoring system inoperable.
B.1 Analyze grab samples of Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> primary containment atmosphere.
AND B.2 Restore required primary 30 days containment atmosphere radioactivity monitoring system to OPERABLE status.
C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or B not met. AND OR C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> All required leakage detection systems inoperable.
Brunswick Unit 1 3.4-1 0 Amendment No. I
BSEP 05-0060 Enclosure 4 Typed Technical Specification Page - Unit 2
RCS Leakage Detection Instrumentation 3.4.5 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. Required primary --------------------NOTE---------------------
containment atmosphere LCO 3.0.4 is not applicable.
radioactivity monitoring - --
system inoperable.
B.1 Analyze grab samples of Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> primary containment atmosphere.
AND B.2 Restore required primary 30 days containment atmosphere radioactivity monitoring system to OPERABLE status.
C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or B not met. AND OR C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> All required leakage detection systems inoperable.
Brunswick Unit 2 3.4-10 Amendment No. I
BSEP 05-0060 Enclosure 5 Marked-up Technical Specification Bases Page - Unit 1 (For Information Only)
RCS Leakage Detection Instrumentation B 3.4.5 BASES ACTIONS B.1 and B.2 (continued)
The Required Actions are modified by a Note that states that the provisions of LCO 3.0.4 are not applicable. As a result, a MODE change is allowed when both the gaseous and particulate primary containment atmosphere radioactivity monitoring channels are inoperable. This allowance is provided because other instrumentation is available to monitor RCS LEAKAGE.
C.1 and C.2 If any Required Action and associated Completion Time of Condition A or B cannot be met: the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The vire=u)eL allowed Completion Times are reasonable, based on operating MOn &tors experience, to perform the actions in an orderly manner and without challenging plant systems.
tn OffYcJ' (e W~ith eaiFeluedinelefs nopefablenoi,,ered-eutttftia-means-OF
-menitilon LEAKAGE arc yeiable, an~t-latshutdevfi eeeeFdaeeYrh-LO GG-a-Gereqeifed.
SURVEILLANCE SR 3.4.5.1 REQUIREMENTS This SR is for the performance of a CHANNEL CHECK of the required primary containment atmosphere radioactivity monitoring system. The check gives reasonable confidence that the channel is operating properly.
The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is based on instrument reliability and is reasonable for detecting off normal conditions.
SR 3.4.5.2 This SR is for the performance of a CHANNEL FUNCTIONAL TEST of the required RCS leakage detection instrumentation. The test ensures that the monitors can perform their function in the desired manner. The test also verifies, for the radioactivity monitoring channels only, the required alarm setpoint and relative accuracy of the instrument string.
(continued)
Brunswick Unit 1 B 3.4.5-4 Revision No. @ I