Monthly Operating Repts for Oct 1985
ML20138R171
Person / Time
Site: Brunswick  
Issue date: 10/31/1985
From: Dietz C, Harrison F
CAROLINA POWER & LIGHT CO.
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
BSEP-85-1934, NUDOCS 8511180475
Download: ML20138R171 (11)


Text

p. -

L 1

,-i.

DOCKET NO.:

050-0325 UNIT: Brunswick 1 DATE: November 1985 COMPLETED BY: Frances Harrison c

OPERATIONS

SUMMARY

i BRUNSWICK UNIT 1 Unit 1 reactor mode was switched to startup on October 30, 1985, after the refueling / maintenance outage was. completed.

There are 840 BWR and 160 PWR spent fuel bundles in the Brunswick Unit i fuel pool.

L

[

t

- t 5

hhl180475851031 1-l R

ADOCK 05000324 hh t i

DOCKET NO.

050-0325 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick I DATE November 1985 REPORT MONTil October 1985 COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521

~E c

[g

'h 4 $5 Licensee

,E t,

{"i Cause & Corrective W

Date i

5 4

isE Event gy Action to gO j=

5 35g Report r mU Prevent Recurrence o

u o

85-006 850329 S

In Progress C

4 NA RC FUELXX Refu611ng/ Maintenance Outage I

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram-Entry Sheets for Licensee C-Refueling 3-Automatic,Seram.

Event Repor (LER) File (NUREG-0161)

D Regulator) Restriction l-Continuations i

E Operator Training & License Examination F Administrative 5-Load Reductions 5

G-Operational Error (Explain) 6-Other Exhibii 1 - Same Source p:/77)

Il Other (Explain)

?

'-CP&L CD--

PLANT PERFORMANCE DATA SYSTEM

'PAGE 1

' RUN-DATE 'i1/04/85 APPENDIX B - AVERAGE DAILY POWER LEVEL' RPD39 iRUN: TIME -12:43:48 BRUNSWICK UNIT i f.

DOCKET NO. 050-0325 COMPLETED BY FRANPES HARRISON TELEPHONE (919)457-952i 1

OCTOBER 1985-I DAY.. AVG.. DAILY POWER LEVEL-DAY AVG. DAILY-POWER LEVEL-(MWE-NET)

(MWE-NET)

1

-iO i?

-9 2:

--11 18

-ii

~ 3l

. -i i 19

-i2

.4

-12 20

-11 l

l 5

- 1 1.

21

-11 6

-ii' 22

-11

7

-12 23

-11 8

.-42 24

-11 9

-10 25

-11 "10

-11 26

-10 11

-11 27

-10 12

-11 28

-12' 13

-11

-29

-14 14

-10 30

-14 15

-10 31

-14 16

-7 1.16 - 8 i:

CP&L.CO:

PLANT PERFORMANCE ~ DATA' SYSTEM PAGE-i

  • RUN DATE 11/04/851 OPERATING DATA REPORT RPD36 RUNiTIME 12:43:50' BRUNSWICK UNIT i DOCKET NO. 050-0325

~ COMPLETED BY FRANCES HARRISON

-OPERATING. STATUS TELEPHONE (919)457-9521

i. UNIT NAME: - BRUNSWICK UNIT i i NOTES I

2.' REPORTING PERIOD: -OCTOBER.

85 l.

l

3. LICENSED THERMAL POWER (MWT). 2436 l

l 4.

NAMEPLATE RATING'(GROSS MWE); 867.0 t

i

5.. DESIGN ELECTRICAL RATING (NET MWE) 821.0 1

1

'6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l l

7. MAX DEPENDABLE CAPACITY (NET MWE) 790.0

~~

.8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT,

~GIVE REASONSt

9. POWER LEVEL TD WHICH RESTRICTED IF ANY (NET MWE):

.10. REASONS,FOR RESTRICTION IF ANY4 THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN-REPORTING PERIOD 745.00 7296.00~

75601.00

' 12. NUMBER OF HOURS REACTOR CRITICAL 33.92 2112.92 45534.78 13.-REACTOR RESERVE SHUTDOWN HRS

.00

.00 1647.10'

-14.. HOURS GENERATOR ON LINE

.00 2064.45 42953.28 15.-UNIT-RESERVE SHUTDOWN HOURS

.00

.00

.00J

-16.. GROSS' THERMAL' ENERGY GEN. (MWH)

.00 3521596.58 87570793.50

17. GROSS ELEC. ENERGY GEN. (MWH)

.00 1180426.00 28922523.00.

18.~ NET ELEC.-ENERGY GENERATED'(MWH)

-8236.00 1112160.00 27757943.00 fi9.EUNIT-SERVICE FACTOR

.00 28.30 56.82

20'.' UNIT AVAILABILITY FACTOR

.00 28.30 56.82 21 '. UNIT / CAP. FACTOR (USING MDC NET)

-i.40 19.30 46.48

~

22. UNIT CAP. FACTOR (USING DER NET)

-1.35 18.57 44.72

23. UNIT FORCED OUTAGE RATE

.00 2.23 20.28

24. SHUTDOWNS.SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)'

~25.

IF SHUTDOWN'AT END OF' REPORT PERIOD, ESTIMATED DATE OF START UP: 11/08/85 26.. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)* FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9 i

l

9 DOCKET NO.:

050-0324 UNIT:

Brunswick 2 DATE: November 1985 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT 2 Brunswick Unit 2 operated at a 57.34 percent availability factor for the month of October 1985 with a 44.09 percent capacity factor. There was one off-line outage. Details are in Unit Shutdowns and Power Reductions sheet. The unit operated at reduced power due to main steam line solenoid problems.

There are 608 BWR and 144 PWR spent fuel bundles in the Brunswick Unit 2 fuel pool.

tCP&L'CO' PLANT PERFORMANCE DATA SYSTEM PAGE' 2

f RUN DATE - 11/04/85-APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39

?RUN TIME '.i2:43:48

. BRUNSWICK UNIT 2 f-DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521

' OCTOBER-1985 DAY-AVG. DAILY POWER-LEVEL DAY AVG. DAILY POWER LEVEL MWE-NET)

(MWE-NET)

(

.1.

-9 17

-13

2

- i8 335

~

3

-8 19 622

,; 4

-9 20 608 51

-9 21 563 6

--9 22 565 7-

-7 23 564

~8

-11 24 563

~

.9 -

-15 25 575 10

-14 26 648 11

-216 27 691

-12 572' 28 691

'3 704 29 699 i

i4-640

-30 703 15' 249 31 697 l

.i 6

-i2 o

l 1.i6 - 8 J

7 CP&L* CO.

PLANT PERFORMANCE DATA SYSTEM PAGE 2

'RUN DATE 11/04/85 OPERATING DATA REPORT RPD36 RUN TIME 12:43:50 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (919)457-9521

.i. UNIT NAME: BRUNSWICK UNIT 2 1 NOTES I

2. REPORTING PERIOD: OCTOBER 85 I

i 3.' LICENSED THERMAL POWER (MWT) 2436

)

l 4.

NAMEPLATE RATING (GROSS MWE)- 867.0 1

I 5.

DESIGN ELECTRICAL RATING (NET MWE) 821.0 1

1

6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l

_I

7. MAX DEPENDABLE CAPACITY (NET MWE)- 790.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)

~ 10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE ii. HOURS IN REPORTING PERIOD 745.00 7296.00 87625.00

12. NUMBER OF HOURS REACTOR CRITICAL 491.41 6471.12 53848.64
13. REACTOR RESERVE SHUTDOWN HRS

.00

.00

.00

.1 4. HOURS GENERATOR ON LINE 427.17 6330.61 50355.68

15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

16. GROSS THERMAL ENERGY GEN. (MWH) 828662.89 14343721.47 97454588.78

'i?. GROSS ELEC. ENERGY GEN. (MWH) 272135.00 4739297.00 32341001.00 18.-NET ELEC. ENERGY GENERATED (MWH) 259475.00 4582398.00 31002872.00

19. UNIT SERVICE FACTOR 57.34 86.77 57.47

~20. UNIT AVAILABILITY FACTOR 57.34 86.77 57.47 21.-UNIT CAP. FACTOR (USING MDC NET) 44.09 79.50 44.79

22. UNIT CAP. FACTOR-(USING DER NET) 42.42 76.50 43.10
23. UNIT FORCED OUTAGE RATE 42.66 9.70 15.59
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (fYPE, DATE, AND DURATION OF EACH)

Refueling / Maintenance 12/01/85 30 weeks

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)' FORCAST ACHEIVED INITIAL CRITICALIT)

INITIAL ELECTRICITY COMMERCIAL OPERATION i.16 - 9

A

?

050-0324 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS Brunswick 11 UNIT N AME November 1985 DATE Frances Harrison r

COMPLETED BY REPORT MONTit Octcher 1985 TELEPHONE (919)457-4521 l

1 1

E E

${".

Cause & Corrective E,7

')

j E3 Licensee P.

Action to d

Date

?

E 4

2g&

Event 3g I'"ent Recurrence I

C C5 g

t.= =

Report e "O

5-o y my v

6 l

85-067 850926 F

357.17 H

I Generator Removed From Service Due to Hurricane Warning. Also, Repaired Seat Leakage From RHR Valve 2-Ell-FOl5B.

I 1

1 1

i i

I 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data B. Maintenance of Test

2. Manual Scram.

Entry Sheets for Licensee i

C. Refueling 3-Aulomatic Scram.

Event Report (LER) File INUREG.

0161)

D-Regulatory Restriction le-Continuations E-Operator Training & License Examination F Administrative 5-Load Reductions 5

G-Operational Error (Explain)

(,-O t he r Exhibit I-Same Source 19/77)

Il-Other (E xplain) e L

t-050-0324 DOCKET NO-UNIT SHUTDOWNS AND POWER REDUCTIONS Brunswick II UNIT NAME DATE November 1985 REPORT MONTil October 1985

.i COMPLETED BY Frances Harrison TELEPHONE (919)457-4521 c

jE'3 Licensee j t, je.

Cause & Correceive

{e Dat e i

?

?

2s5 Event g

('8 Action to gg Report e mV Prevent Recurrence j=

d vg g

6 85-070 851015 F

68.32 A

3 2-85-011 Main Steam Isolation Valve-2-B21-F022A Solenoid Valve Failure.

9 1

2 3

4 F: Forced Reason:

Method:

Exhibit G Instructisms S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG.

0161)

D-Regulator) Restriction I-Continuations l

E-Operator Training & License Examination F-Administ rative 5-Load Reductions 3

(9/77)

II Other (Explain t Exhibii I Same Source G-Operational Error (Explain) 6-Other

=

g..

DOCKET NO. 030-0324 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAMr Brunswick TT DATE November 1985 COMPLETED BY Frances Harrison, REPORT MONTH October 1985 i

TELEPHONE (919)457-95?]

c

  • 3

'h j EE Licensee gg gn.

Cause & Currective s,4 2j$

Event g7

{

Action to Daic i

3g j ;)j g Report e mO Prevent Recurrence f=

g 6

85-074 851020 F

In A

5 Unit Operating at Reduced Power Due to Progress Main Steam Line Solenoid Problems.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data

1-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C- *et'ueling 3 Automatic Scram.

Event Report (LER) File tNUREG-0161)

D Regulatory Restriction 1s-Con t i nua t Ion's E-Operator Training & License Examination F Administrative 5-Load Reductions 3

G-Operational Error (Explain) 6-Other Exhibit I - Same Source 19/77) ll-Other (Explaini w

< pat

.,mw Carolina Power & Light Company ww=:m u m muca m m Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 e

November 4, 1985 FILE:

B09-13510C SERIAL:

BSEP/85-1934 Mr. J. M. Taylor, Director Of fice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT

Dear Mr. Taylor:

In accordance with Technical Specification 6.9.1.6 for the 3runswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of October 1985.

Very truly yours.

Y i-6 C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/jlh MSC/85-0014 Enclosures cc:

Mr. M. R. Beebe Dr. J. N. Grace Mr. J. L. Harness Mr. C. F. Lassiter Ms. D. J. Vicks INPO s 6)*