MONTHYEARB17766, Application for Amend to License DPR-65,to Return Hydrogen Purge Sys to Former Classification of Being within Scope of Maint Rule Program,But Not as risk-significant Sys1999-09-23023 September 1999 Application for Amend to License DPR-65,to Return Hydrogen Purge Sys to Former Classification of Being within Scope of Maint Rule Program,But Not as risk-significant Sys B17832, Application for Amend to License DPR-65,removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers1999-09-0707 September 1999 Application for Amend to License DPR-65,removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers B17829, Suppl 1 to TS Change Request 1-1-99 for Amend to License DPR-21,revising Proposed Permanently Defueled TS Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-14331999-08-25025 August 1999 Suppl 1 to TS Change Request 1-1-99 for Amend to License DPR-21,revising Proposed Permanently Defueled TS Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 B17799, Application for Amend to License NPF-49,incorporating Editorial Revs to TS Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Sections B 3/4.3.2,B 3/4.4.11, B 3/4.6.1.2 & B 3/4.8.41999-08-0505 August 1999 Application for Amend to License NPF-49,incorporating Editorial Revs to TS Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Sections B 3/4.3.2,B 3/4.4.11, B 3/4.6.1.2 & B 3/4.8.4 B17772, Application for Amend to License DPR-65,relocating Selected TS Re Refueling Operations & Associated Bases to Plant TRM1999-07-16016 July 1999 Application for Amend to License DPR-65,relocating Selected TS Re Refueling Operations & Associated Bases to Plant TRM B17764, Application for Amend to License NPF-49,deleting Reference to ASME Code Paragraph Iwv 3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger Contained in TS 4.4.6.2.2.e1999-05-17017 May 1999 Application for Amend to License NPF-49,deleting Reference to ASME Code Paragraph Iwv 3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger Contained in TS 4.4.6.2.2.e B17621, Application for Amend to License DPR-21,reflecting Permanently Defueled Condition of Unit 1,Tech Specs Administrative Controls Section as Allowed by Guidance Contained in NRC Administrative Ltr 95-061999-04-19019 April 1999 Application for Amend to License DPR-21,reflecting Permanently Defueled Condition of Unit 1,Tech Specs Administrative Controls Section as Allowed by Guidance Contained in NRC Administrative Ltr 95-06 B17737, Mod to 990104 Application for Amend to License DPR-65, Changing Value for Turbine Driven Auxiliary Feedwater Pump Associated with Monthly Surveillance Testing of Various ESF Pump1999-04-0707 April 1999 Mod to 990104 Application for Amend to License DPR-65, Changing Value for Turbine Driven Auxiliary Feedwater Pump Associated with Monthly Surveillance Testing of Various ESF Pump B17343, Application for Amend to License NPF-49,revising TS to Support Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of Ol.Proprietary & non- Proprietary Licensing Repts,Encl.Proprietary Rept Withheld1999-03-19019 March 1999 Application for Amend to License NPF-49,revising TS to Support Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of Ol.Proprietary & non- Proprietary Licensing Repts,Encl.Proprietary Rept Withheld B16997, Application for Amend to License DPR-65,relocating Instrumentation TSs 3.3.3.2,3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 Trm,Per GL 95-101999-03-19019 March 1999 Application for Amend to License DPR-65,relocating Instrumentation TSs 3.3.3.2,3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 Trm,Per GL 95-10 B17658, Application for Amend to License DPR-65,revising TSs 3.5.2, 3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys.Associated Bases Will Be Modified as Necessary to Address Proposed Changes1999-03-17017 March 1999 Application for Amend to License DPR-65,revising TSs 3.5.2, 3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys.Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207J6201999-03-15015 March 1999 Application for Amends to Licenses NPF-49 & NPF-86, Transferring Control of Licenses to Reflect Change in Upstream Economic Ownership of Parent Company of Nep,Vols I & Ii.Pages 48,49 & Annual Rept 1996 Pages 2 & 3 Omitted B17566, Application for Amend to License NPF-49,proposing Amend to TS 3/4.7.4, SW Sys, by Adding AOT for One SW Pump Using Duration More in Line with Significance Associated with Function of Pump1999-03-0202 March 1999 Application for Amend to License NPF-49,proposing Amend to TS 3/4.7.4, SW Sys, by Adding AOT for One SW Pump Using Duration More in Line with Significance Associated with Function of Pump B17669, Suppl to Application for Amend to License DPR-65,revising DG Action Statements & Surveillance Requirements1999-02-11011 February 1999 Suppl to Application for Amend to License DPR-65,revising DG Action Statements & Surveillance Requirements B17004, Application for Amend to License NPF-49,revising TS Table 3.7-6, Area Temp Monitoring & Revising FSAR to Describe Full Core off-load Condition as Normal Evolution.Proprietary Rev 2 to HI-971843,encl.Proprietary Info Withheld1999-01-18018 January 1999 Application for Amend to License NPF-49,revising TS Table 3.7-6, Area Temp Monitoring & Revising FSAR to Describe Full Core off-load Condition as Normal Evolution.Proprietary Rev 2 to HI-971843,encl.Proprietary Info Withheld B17623, Application for Amend to License DPR-65,changing TS 3.6.1.2, Containment Sys - Containment Leakage1999-01-18018 January 1999 Application for Amend to License DPR-65,changing TS 3.6.1.2, Containment Sys - Containment Leakage ML20199L0631999-01-18018 January 1999 Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into TS 3/4.2.2, Heat Flux Hot Channel Factor-FQ(Z), 6.9.1.6.a & 6.9.1.6.b, Colr B17590, Application for Amend to License DPR-65,removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys, from Plant TS1999-01-18018 January 1999 Application for Amend to License DPR-65,removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys, from Plant TS B17517, Application for Amend to License DPR-65,incorporating Changes to ESF Pump Testing Contained in TSs 3.5.2,3.6.2.1, 3.7.1.2,3.7.3.1 & 3.7.4.11999-01-0404 January 1999 Application for Amend to License DPR-65,incorporating Changes to ESF Pump Testing Contained in TSs 3.5.2,3.6.2.1, 3.7.1.2,3.7.3.1 & 3.7.4.1 B17519, Application for Amend to License DPR-65,revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1.Addl TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes,Included1998-12-28028 December 1998 Application for Amend to License DPR-65,revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1.Addl TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes,Included B17542, Application for Amend to License DPR-65,requesting Review & Approval to Plant Fsar,Per 10CFR50.90.Changes to Plant FSAR Pages,Encl1998-12-10010 December 1998 Application for Amend to License DPR-65,requesting Review & Approval to Plant Fsar,Per 10CFR50.90.Changes to Plant FSAR Pages,Encl B17342, Application for Amend to License NPF-49,proposing Rev to TS 4.7.10.e to Eliminate Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred1998-12-0404 December 1998 Application for Amend to License NPF-49,proposing Rev to TS 4.7.10.e to Eliminate Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred B17546, Application for Amend to License DPR-21,requesting NRC Approval of Certified Fuel Handler Training & Retraining Program & Request for Exemption from Requirements of 10CFR50.54(m)(2)1998-12-0404 December 1998 Application for Amend to License DPR-21,requesting NRC Approval of Certified Fuel Handler Training & Retraining Program & Request for Exemption from Requirements of 10CFR50.54(m)(2) B17498, Application for Amend to License DPR-65,revising FSAR Due to Increase in Radiological Consequences Caused by Changes in Assumptions Used in Updated Dose Consequences Analysis of Sgtr.Rvised FSAR Pages Encl1998-11-13013 November 1998 Application for Amend to License DPR-65,revising FSAR Due to Increase in Radiological Consequences Caused by Changes in Assumptions Used in Updated Dose Consequences Analysis of Sgtr.Rvised FSAR Pages Encl B17492, Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H, from Indefinite Period of Time1998-11-10010 November 1998 Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H, from Indefinite Period of Time B16951, Application for Amend to License DPR-65,changing TS 3.3.2.1, Instrumentation - ESFAS Intrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F1998-10-22022 October 1998 Application for Amend to License DPR-65,changing TS 3.3.2.1, Instrumentation - ESFAS Intrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F B17417, Application for Amend to License DPR-65,re Separation Requirement in FSAR of Six Inches,Which Is Applied to Redundant Vital Cables,Internal Wiring of Redundant Vital Circuits & Associated Devices1998-09-28028 September 1998 Application for Amend to License DPR-65,re Separation Requirement in FSAR of Six Inches,Which Is Applied to Redundant Vital Cables,Internal Wiring of Redundant Vital Circuits & Associated Devices B17413, Application for Amend to License DPR-65,revising TS Sections 3.3.2.1,3.4.6.2,3.4.8,3.6.2.1,3.6.5.1,3.7.6.1 & 3.9.15 as Result of Revised MSLB Analyses & Revised Determinations of Radiological Consequences of MSLB & LOCA1998-09-28028 September 1998 Application for Amend to License DPR-65,revising TS Sections 3.3.2.1,3.4.6.2,3.4.8,3.6.2.1,3.6.5.1,3.7.6.1 & 3.9.15 as Result of Revised MSLB Analyses & Revised Determinations of Radiological Consequences of MSLB & LOCA B17381, Application for Amend to License DPR-65,changing TS Definitions 1.24,1.27,1.31,TSs 3.0.2,4.0.5,3.2.3,3.3.2.1, 3.4.1.1,3.4.11 & Adding TS 3.0.61998-09-0909 September 1998 Application for Amend to License DPR-65,changing TS Definitions 1.24,1.27,1.31,TSs 3.0.2,4.0.5,3.2.3,3.3.2.1, 3.4.1.1,3.4.11 & Adding TS 3.0.6 ML20237B2691998-08-12012 August 1998 Application for Amend to License DPR-65,updating List of Documents Describing Analytical Methods Specified in TS 6.9.1.8b.Rev 1 to EMF-98-036,encl ML20236Y4951998-08-0606 August 1998 Application for Amend to License NPF-49,revising TS Surveillance 4.4.5.3.a Re SG Tube Insp Interval B16902, Application for Amend to License DPR-65,changing TS 3.7.1.3, Plant Sys - Condensate Storage Tank & Adding TS 3.7.1.7, Plant Sys - Atomspheric Steam Dump Valves1998-08-0404 August 1998 Application for Amend to License DPR-65,changing TS 3.7.1.3, Plant Sys - Condensate Storage Tank & Adding TS 3.7.1.7, Plant Sys - Atomspheric Steam Dump Valves B17310, Application for Amend to License DPR-65,changing TS Bases 3/4.9.1,3/4.1.1.1,3/4.7.1.6,3/4.7.7,3/4.5.4 & 3/4.3.3.10 by Resolving Miscellaneous Condition Repts1998-07-30030 July 1998 Application for Amend to License DPR-65,changing TS Bases 3/4.9.1,3/4.1.1.1,3/4.7.1.6,3/4.7.7,3/4.5.4 & 3/4.3.3.10 by Resolving Miscellaneous Condition Repts B17046, Application for Amend to License NPF-49,clarifying Administrative Controls for RHR Isolation Valves When RHR Sys Is in Svc for Core Cooling1998-07-30030 July 1998 Application for Amend to License NPF-49,clarifying Administrative Controls for RHR Isolation Valves When RHR Sys Is in Svc for Core Cooling B17190, Application for Amend to License DPR-65,changing Tech Specs 2.1.1, Safety Limits - Reactor Core, 2.2.1, Limiting Safety Sys Settings - Reactor Trip Setpoints & 3.3.1.1, Instrumentation - Reactor Protective Instrumentation1998-07-21021 July 1998 Application for Amend to License DPR-65,changing Tech Specs 2.1.1, Safety Limits - Reactor Core, 2.2.1, Limiting Safety Sys Settings - Reactor Trip Setpoints & 3.3.1.1, Instrumentation - Reactor Protective Instrumentation B16537, Application for Amend to License DPR-65,modifying DG Testing Requirements by Incorporating Recommendations Contained in GLs 84-15,93-05 & 91-041998-07-17017 July 1998 Application for Amend to License DPR-65,modifying DG Testing Requirements by Incorporating Recommendations Contained in GLs 84-15,93-05 & 91-04 B17280, Application for Amend to License DPR-65,revising Section 9.7.2, Svc Water & Section 9.4 Reactor Bldg Closed Cooling Water, Affected by Change.Attachment 1 Provides Discussion of Proposed Changes1998-07-0202 July 1998 Application for Amend to License DPR-65,revising Section 9.7.2, Svc Water & Section 9.4 Reactor Bldg Closed Cooling Water, Affected by Change.Attachment 1 Provides Discussion of Proposed Changes B17308, Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapter 12 of Millstone Unit 3 FSAR1998-06-10010 June 1998 Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapter 12 of Millstone Unit 3 FSAR B17276, Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapters 6,9 & 15 of Millstone Unit 3 FSAR1998-06-0606 June 1998 Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapters 6,9 & 15 of Millstone Unit 3 FSAR B17288, Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapter 15 of Millstone,Unit 3 FSAR1998-06-0505 June 1998 Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapter 15 of Millstone,Unit 3 FSAR B16186, Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time Most Reactor Protection or Esfa Channels Can Be in Bypass Position to 48 Hours,From Indefinite Period of Time1998-05-14014 May 1998 Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time Most Reactor Protection or Esfa Channels Can Be in Bypass Position to 48 Hours,From Indefinite Period of Time ML20247J1131998-05-0707 May 1998 Application for Amend to License NPF-49,incorporating Attached Proposed Rev Into Chapter 15 of Unit 3 FSAR B17210, Application for Amend to License NPF-49,revising TS 3/4.5.4 Re Refueling Water Storage Tank Min Boron Concentration1998-05-0101 May 1998 Application for Amend to License NPF-49,revising TS 3/4.5.4 Re Refueling Water Storage Tank Min Boron Concentration B17112, Application for Amend to License DPR-65,replacing Two low- Range Pressurizer transmitters,PT-103 & PT-103-1 Which Will Identify That Two low-range Pressurizer Pressure Instrument Channels Are Independent & Redundant Only1998-04-29029 April 1998 Application for Amend to License DPR-65,replacing Two low- Range Pressurizer transmitters,PT-103 & PT-103-1 Which Will Identify That Two low-range Pressurizer Pressure Instrument Channels Are Independent & Redundant Only B17194, Application for Amend to License NPF-49,changing TS Bases Section 3/4.3.3.5 to Add Wording to Clarify Calibration of Intermediate Range Neutron Amps Channel Associated W/Remote Shutdown Instrumentation1998-04-23023 April 1998 Application for Amend to License NPF-49,changing TS Bases Section 3/4.3.3.5 to Add Wording to Clarify Calibration of Intermediate Range Neutron Amps Channel Associated W/Remote Shutdown Instrumentation B17144, Application for Amend to License NPF-49,assuring That PORVs Will Be Capable of Automatic Cycling as Well as Manual Cycling When in TS Action Statements That Allow Indefinite Continued Operation1998-04-14014 April 1998 Application for Amend to License NPF-49,assuring That PORVs Will Be Capable of Automatic Cycling as Well as Manual Cycling When in TS Action Statements That Allow Indefinite Continued Operation ML20216J5141998-04-13013 April 1998 Application for Amend to License DPR-65,adding TS 3.5.5, ECCS - Trisodium Phosphate B17028, Application for Amend to License NPF-49,revising TS 3/4.4.3 by Replacing Pressurizer Max Water Inventory Requirements W/ Pressurizer Level Requirement1998-04-0707 April 1998 Application for Amend to License NPF-49,revising TS 3/4.4.3 by Replacing Pressurizer Max Water Inventory Requirements W/ Pressurizer Level Requirement ML20216C0401998-04-0606 April 1998 Application for Amend to License DPR-65,changing TSs 3.4.4, RCS - Pressurizer, 3.6.1.5, Containment Sys - Air Temp & 3.7.1.5, Plant Sys - Msli Valves. Info Will Be Added to Bases of Associated TSs to Address Proposed Changes B17141, Application for Amend to License NPF-49,incorporating Rev Into Chapters 2,3 & 9 of Fsar,Adding New Sump Pump Subsys to Address Groundwater Inleakage Through Containment Basemat1998-04-0101 April 1998 Application for Amend to License NPF-49,incorporating Rev Into Chapters 2,3 & 9 of Fsar,Adding New Sump Pump Subsys to Address Groundwater Inleakage Through Containment Basemat 1999-09-07
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARB17766, Application for Amend to License DPR-65,to Return Hydrogen Purge Sys to Former Classification of Being within Scope of Maint Rule Program,But Not as risk-significant Sys1999-09-23023 September 1999 Application for Amend to License DPR-65,to Return Hydrogen Purge Sys to Former Classification of Being within Scope of Maint Rule Program,But Not as risk-significant Sys B17832, Application for Amend to License DPR-65,removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers1999-09-0707 September 1999 Application for Amend to License DPR-65,removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers B17829, Suppl 1 to TS Change Request 1-1-99 for Amend to License DPR-21,revising Proposed Permanently Defueled TS Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-14331999-08-25025 August 1999 Suppl 1 to TS Change Request 1-1-99 for Amend to License DPR-21,revising Proposed Permanently Defueled TS Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 B17799, Application for Amend to License NPF-49,incorporating Editorial Revs to TS Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Sections B 3/4.3.2,B 3/4.4.11, B 3/4.6.1.2 & B 3/4.8.41999-08-0505 August 1999 Application for Amend to License NPF-49,incorporating Editorial Revs to TS Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Sections B 3/4.3.2,B 3/4.4.11, B 3/4.6.1.2 & B 3/4.8.4 B17772, Application for Amend to License DPR-65,relocating Selected TS Re Refueling Operations & Associated Bases to Plant TRM1999-07-16016 July 1999 Application for Amend to License DPR-65,relocating Selected TS Re Refueling Operations & Associated Bases to Plant TRM ML20207G6321999-06-0303 June 1999 Amends 105,235 & 171 to Licenses DPR-21,DPR-65 & NPF-49, Respectively,Replacing Specific Titles in Section 6.0 of TSs for All Three Millstone Units with Generid Titles B17764, Application for Amend to License NPF-49,deleting Reference to ASME Code Paragraph Iwv 3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger Contained in TS 4.4.6.2.2.e1999-05-17017 May 1999 Application for Amend to License NPF-49,deleting Reference to ASME Code Paragraph Iwv 3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger Contained in TS 4.4.6.2.2.e B17621, Application for Amend to License DPR-21,reflecting Permanently Defueled Condition of Unit 1,Tech Specs Administrative Controls Section as Allowed by Guidance Contained in NRC Administrative Ltr 95-061999-04-19019 April 1999 Application for Amend to License DPR-21,reflecting Permanently Defueled Condition of Unit 1,Tech Specs Administrative Controls Section as Allowed by Guidance Contained in NRC Administrative Ltr 95-06 B17737, Mod to 990104 Application for Amend to License DPR-65, Changing Value for Turbine Driven Auxiliary Feedwater Pump Associated with Monthly Surveillance Testing of Various ESF Pump1999-04-0707 April 1999 Mod to 990104 Application for Amend to License DPR-65, Changing Value for Turbine Driven Auxiliary Feedwater Pump Associated with Monthly Surveillance Testing of Various ESF Pump B17343, Application for Amend to License NPF-49,revising TS to Support Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of Ol.Proprietary & non- Proprietary Licensing Repts,Encl.Proprietary Rept Withheld1999-03-19019 March 1999 Application for Amend to License NPF-49,revising TS to Support Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of Ol.Proprietary & non- Proprietary Licensing Repts,Encl.Proprietary Rept Withheld B16997, Application for Amend to License DPR-65,relocating Instrumentation TSs 3.3.3.2,3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 Trm,Per GL 95-101999-03-19019 March 1999 Application for Amend to License DPR-65,relocating Instrumentation TSs 3.3.3.2,3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 Trm,Per GL 95-10 B17658, Application for Amend to License DPR-65,revising TSs 3.5.2, 3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys.Associated Bases Will Be Modified as Necessary to Address Proposed Changes1999-03-17017 March 1999 Application for Amend to License DPR-65,revising TSs 3.5.2, 3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys.Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207J6201999-03-15015 March 1999 Application for Amends to Licenses NPF-49 & NPF-86, Transferring Control of Licenses to Reflect Change in Upstream Economic Ownership of Parent Company of Nep,Vols I & Ii.Pages 48,49 & Annual Rept 1996 Pages 2 & 3 Omitted ML20207L2581999-03-0505 March 1999 Amend 104 to License DPR-21,changing TSs for Staffing & Training Requirements to Allow Use of Certified Fuel Handlers to Meet Plant Staffing Requirements B17566, Application for Amend to License NPF-49,proposing Amend to TS 3/4.7.4, SW Sys, by Adding AOT for One SW Pump Using Duration More in Line with Significance Associated with Function of Pump1999-03-0202 March 1999 Application for Amend to License NPF-49,proposing Amend to TS 3/4.7.4, SW Sys, by Adding AOT for One SW Pump Using Duration More in Line with Significance Associated with Function of Pump B17669, Suppl to Application for Amend to License DPR-65,revising DG Action Statements & Surveillance Requirements1999-02-11011 February 1999 Suppl to Application for Amend to License DPR-65,revising DG Action Statements & Surveillance Requirements ML20199L0631999-01-18018 January 1999 Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into TS 3/4.2.2, Heat Flux Hot Channel Factor-FQ(Z), 6.9.1.6.a & 6.9.1.6.b, Colr B17004, Application for Amend to License NPF-49,revising TS Table 3.7-6, Area Temp Monitoring & Revising FSAR to Describe Full Core off-load Condition as Normal Evolution.Proprietary Rev 2 to HI-971843,encl.Proprietary Info Withheld1999-01-18018 January 1999 Application for Amend to License NPF-49,revising TS Table 3.7-6, Area Temp Monitoring & Revising FSAR to Describe Full Core off-load Condition as Normal Evolution.Proprietary Rev 2 to HI-971843,encl.Proprietary Info Withheld B17590, Application for Amend to License DPR-65,removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys, from Plant TS1999-01-18018 January 1999 Application for Amend to License DPR-65,removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys, from Plant TS B17623, Application for Amend to License DPR-65,changing TS 3.6.1.2, Containment Sys - Containment Leakage1999-01-18018 January 1999 Application for Amend to License DPR-65,changing TS 3.6.1.2, Containment Sys - Containment Leakage B17517, Application for Amend to License DPR-65,incorporating Changes to ESF Pump Testing Contained in TSs 3.5.2,3.6.2.1, 3.7.1.2,3.7.3.1 & 3.7.4.11999-01-0404 January 1999 Application for Amend to License DPR-65,incorporating Changes to ESF Pump Testing Contained in TSs 3.5.2,3.6.2.1, 3.7.1.2,3.7.3.1 & 3.7.4.1 B17519, Application for Amend to License DPR-65,revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1.Addl TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes,Included1998-12-28028 December 1998 Application for Amend to License DPR-65,revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1.Addl TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes,Included B17542, Application for Amend to License DPR-65,requesting Review & Approval to Plant Fsar,Per 10CFR50.90.Changes to Plant FSAR Pages,Encl1998-12-10010 December 1998 Application for Amend to License DPR-65,requesting Review & Approval to Plant Fsar,Per 10CFR50.90.Changes to Plant FSAR Pages,Encl B17546, Application for Amend to License DPR-21,requesting NRC Approval of Certified Fuel Handler Training & Retraining Program & Request for Exemption from Requirements of 10CFR50.54(m)(2)1998-12-0404 December 1998 Application for Amend to License DPR-21,requesting NRC Approval of Certified Fuel Handler Training & Retraining Program & Request for Exemption from Requirements of 10CFR50.54(m)(2) B17342, Application for Amend to License NPF-49,proposing Rev to TS 4.7.10.e to Eliminate Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred1998-12-0404 December 1998 Application for Amend to License NPF-49,proposing Rev to TS 4.7.10.e to Eliminate Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred B17498, Application for Amend to License DPR-65,revising FSAR Due to Increase in Radiological Consequences Caused by Changes in Assumptions Used in Updated Dose Consequences Analysis of Sgtr.Rvised FSAR Pages Encl1998-11-13013 November 1998 Application for Amend to License DPR-65,revising FSAR Due to Increase in Radiological Consequences Caused by Changes in Assumptions Used in Updated Dose Consequences Analysis of Sgtr.Rvised FSAR Pages Encl B17492, Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H, from Indefinite Period of Time1998-11-10010 November 1998 Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H, from Indefinite Period of Time B16951, Application for Amend to License DPR-65,changing TS 3.3.2.1, Instrumentation - ESFAS Intrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F1998-10-22022 October 1998 Application for Amend to License DPR-65,changing TS 3.3.2.1, Instrumentation - ESFAS Intrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F B17417, Application for Amend to License DPR-65,re Separation Requirement in FSAR of Six Inches,Which Is Applied to Redundant Vital Cables,Internal Wiring of Redundant Vital Circuits & Associated Devices1998-09-28028 September 1998 Application for Amend to License DPR-65,re Separation Requirement in FSAR of Six Inches,Which Is Applied to Redundant Vital Cables,Internal Wiring of Redundant Vital Circuits & Associated Devices B17413, Application for Amend to License DPR-65,revising TS Sections 3.3.2.1,3.4.6.2,3.4.8,3.6.2.1,3.6.5.1,3.7.6.1 & 3.9.15 as Result of Revised MSLB Analyses & Revised Determinations of Radiological Consequences of MSLB & LOCA1998-09-28028 September 1998 Application for Amend to License DPR-65,revising TS Sections 3.3.2.1,3.4.6.2,3.4.8,3.6.2.1,3.6.5.1,3.7.6.1 & 3.9.15 as Result of Revised MSLB Analyses & Revised Determinations of Radiological Consequences of MSLB & LOCA B17381, Application for Amend to License DPR-65,changing TS Definitions 1.24,1.27,1.31,TSs 3.0.2,4.0.5,3.2.3,3.3.2.1, 3.4.1.1,3.4.11 & Adding TS 3.0.61998-09-0909 September 1998 Application for Amend to License DPR-65,changing TS Definitions 1.24,1.27,1.31,TSs 3.0.2,4.0.5,3.2.3,3.3.2.1, 3.4.1.1,3.4.11 & Adding TS 3.0.6 ML20237B2691998-08-12012 August 1998 Application for Amend to License DPR-65,updating List of Documents Describing Analytical Methods Specified in TS 6.9.1.8b.Rev 1 to EMF-98-036,encl ML20236Y4951998-08-0606 August 1998 Application for Amend to License NPF-49,revising TS Surveillance 4.4.5.3.a Re SG Tube Insp Interval B16902, Application for Amend to License DPR-65,changing TS 3.7.1.3, Plant Sys - Condensate Storage Tank & Adding TS 3.7.1.7, Plant Sys - Atomspheric Steam Dump Valves1998-08-0404 August 1998 Application for Amend to License DPR-65,changing TS 3.7.1.3, Plant Sys - Condensate Storage Tank & Adding TS 3.7.1.7, Plant Sys - Atomspheric Steam Dump Valves B17310, Application for Amend to License DPR-65,changing TS Bases 3/4.9.1,3/4.1.1.1,3/4.7.1.6,3/4.7.7,3/4.5.4 & 3/4.3.3.10 by Resolving Miscellaneous Condition Repts1998-07-30030 July 1998 Application for Amend to License DPR-65,changing TS Bases 3/4.9.1,3/4.1.1.1,3/4.7.1.6,3/4.7.7,3/4.5.4 & 3/4.3.3.10 by Resolving Miscellaneous Condition Repts B17046, Application for Amend to License NPF-49,clarifying Administrative Controls for RHR Isolation Valves When RHR Sys Is in Svc for Core Cooling1998-07-30030 July 1998 Application for Amend to License NPF-49,clarifying Administrative Controls for RHR Isolation Valves When RHR Sys Is in Svc for Core Cooling B17190, Application for Amend to License DPR-65,changing Tech Specs 2.1.1, Safety Limits - Reactor Core, 2.2.1, Limiting Safety Sys Settings - Reactor Trip Setpoints & 3.3.1.1, Instrumentation - Reactor Protective Instrumentation1998-07-21021 July 1998 Application for Amend to License DPR-65,changing Tech Specs 2.1.1, Safety Limits - Reactor Core, 2.2.1, Limiting Safety Sys Settings - Reactor Trip Setpoints & 3.3.1.1, Instrumentation - Reactor Protective Instrumentation B16537, Application for Amend to License DPR-65,modifying DG Testing Requirements by Incorporating Recommendations Contained in GLs 84-15,93-05 & 91-041998-07-17017 July 1998 Application for Amend to License DPR-65,modifying DG Testing Requirements by Incorporating Recommendations Contained in GLs 84-15,93-05 & 91-04 B17280, Application for Amend to License DPR-65,revising Section 9.7.2, Svc Water & Section 9.4 Reactor Bldg Closed Cooling Water, Affected by Change.Attachment 1 Provides Discussion of Proposed Changes1998-07-0202 July 1998 Application for Amend to License DPR-65,revising Section 9.7.2, Svc Water & Section 9.4 Reactor Bldg Closed Cooling Water, Affected by Change.Attachment 1 Provides Discussion of Proposed Changes ML20236K3401998-07-0101 July 1998 Amend 218 to License DPR-65,changing TS by Modifying Low Temp Overpressure Protection Requirements B17308, Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapter 12 of Millstone Unit 3 FSAR1998-06-10010 June 1998 Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapter 12 of Millstone Unit 3 FSAR B17276, Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapters 6,9 & 15 of Millstone Unit 3 FSAR1998-06-0606 June 1998 Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapters 6,9 & 15 of Millstone Unit 3 FSAR B17288, Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapter 15 of Millstone,Unit 3 FSAR1998-06-0505 June 1998 Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapter 15 of Millstone,Unit 3 FSAR B16186, Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time Most Reactor Protection or Esfa Channels Can Be in Bypass Position to 48 Hours,From Indefinite Period of Time1998-05-14014 May 1998 Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time Most Reactor Protection or Esfa Channels Can Be in Bypass Position to 48 Hours,From Indefinite Period of Time ML20247J1131998-05-0707 May 1998 Application for Amend to License NPF-49,incorporating Attached Proposed Rev Into Chapter 15 of Unit 3 FSAR B17210, Application for Amend to License NPF-49,revising TS 3/4.5.4 Re Refueling Water Storage Tank Min Boron Concentration1998-05-0101 May 1998 Application for Amend to License NPF-49,revising TS 3/4.5.4 Re Refueling Water Storage Tank Min Boron Concentration B17112, Application for Amend to License DPR-65,replacing Two low- Range Pressurizer transmitters,PT-103 & PT-103-1 Which Will Identify That Two low-range Pressurizer Pressure Instrument Channels Are Independent & Redundant Only1998-04-29029 April 1998 Application for Amend to License DPR-65,replacing Two low- Range Pressurizer transmitters,PT-103 & PT-103-1 Which Will Identify That Two low-range Pressurizer Pressure Instrument Channels Are Independent & Redundant Only B17194, Application for Amend to License NPF-49,changing TS Bases Section 3/4.3.3.5 to Add Wording to Clarify Calibration of Intermediate Range Neutron Amps Channel Associated W/Remote Shutdown Instrumentation1998-04-23023 April 1998 Application for Amend to License NPF-49,changing TS Bases Section 3/4.3.3.5 to Add Wording to Clarify Calibration of Intermediate Range Neutron Amps Channel Associated W/Remote Shutdown Instrumentation B17144, Application for Amend to License NPF-49,assuring That PORVs Will Be Capable of Automatic Cycling as Well as Manual Cycling When in TS Action Statements That Allow Indefinite Continued Operation1998-04-14014 April 1998 Application for Amend to License NPF-49,assuring That PORVs Will Be Capable of Automatic Cycling as Well as Manual Cycling When in TS Action Statements That Allow Indefinite Continued Operation ML20216J5141998-04-13013 April 1998 Application for Amend to License DPR-65,adding TS 3.5.5, ECCS - Trisodium Phosphate 1999-09-07
[Table view] |
Text
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
, )v%
107 seiaen street, seriin, cT 06037
'hjjN ' Northeast N// Utilities Systern sormeaata senw company P.O. Box 270 Ilartford, cT 06141-0270 (203) 665-5000 May 27, 1994 Docket No. 50-336 B14859 Re: 10CFR50.90 10CFR50.91 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specifications Automatic Initiation of the Auxiliary Feedwater System Introduction Pursuant to 10CFR50.90, Northeast Nuclear Energy Company (NNECO) hereby proposes to amend its Operating License, DPR-65, by incorporating the changes identified in Attachments 1 and 2 into the Millstone Unit No. 2 Technical Specifications. The intent of these changes is to denote in Tables 3.3-3, 3.3-4 and 3.3-5 of the Millstone Unit No. 2 Technical Specifications that the operability of the automatic initiation logic for the auxiliary feedwater system (AFW) will rely on operator action for the remainder of Cycle 12.
In addition, NNECO is requesting that the NRC Staff process this license amendment request on an emergency basis pursuant to.
10CFR50. 91 ( a) ( 5) , since failure to act in a timely way would prevent Millstone Unit No. 2 from resuming operation.
Alternatively, NNECO is requesting that the NRC Staff exercise enforcement discretion associated with Action Statement b of Limiting Condition for Operation (LCO) 3.3.2.1 to be effective until the license amendment is issued. The enforcement discretion would permit NNECO to operate Millstone Unit No. 2 in Modes 1, 2, or 3 while the proposed license amendment is being processed.
NNECO believes that expedited treatment is warranted in this case to avoid an unnecessary delay in plant startup following the unscheduled outage to repair a reactor coolant pump seal. This request involves no significant safety impact and the operational j risk associated with the request has no undue risk on public health and safety.
Backaround ;
1 The AFW system is designed to provide feedwater for the removal of sensible and decay heat, and to cool the primary system to 300*F in l
60
""{ % " "
'2 L p
P 3 940527 K 05000336 hi
'I
__________1 (
PDR
.' .l U.S. Nuclear Regulatory Commission B14859/page 2 May 27, 1994 the event the main condensate and feedwater pumps are inoperable due to a loss of the normal power sources or the main steam system.
Additionally, the AFW system may be used for normal system cooldown. The AFW system supplies feedwater from the condensate storage tank to the steam generators via three pumps (two motor-driven pumps and one turbine-driven pump). The motor-driven pumps may be initiated either automatically or manually, and the turbine-driven pump is only initiated manually.
The automatic initiation logic for the motor-driven AFW pumps is comprised of four channels which measure steam generator level. In the event that any two of the four channels detect a steam generator level $ 12%, the automatic AFW trip bistables will complete the two out of four matrix. When the matrix is complete, a three minute and 25 second time delay begins, and an alarm annunciates in the control room. Following the three minute and 25 second time delay, two auxiliary relays are deenergized. These auxiliary relays provide annunciation in the control room, and send start signals to both of the motor-driven AFW pumps and open signals to both AFW regulating valves.
Automatic initiation of the motor-driven AFW pumps was installed as a follow-up action resulting from the NRC Staff reviews regarding the Three Mile Island accident. Prior to this, operator action was credited for the start and control of the AFW system.
During an unscheduled outage to repair a reactor coolant pump seal, NNECO identified that Millstone Unit No. 2 does not conform with our previous commitments regarding automatic initiation of the AFW system. Specifically, we have discovered a single failure which could defeat the automatic initiation logic of the AFW system.
This condition was promptly reported to the NRC on May 19, 1994, to comply with the requirements of 10CFR50.72.
The automatic initiation logic control circuit is common to both AFW trains. The automatic initiation logic control circuit controls two normally energized relays. Upon detection of a low steam generator level, the two normally energized relays de-energize to initiate independent timers. As stated above, after a time delay, start signals are sent to each of the motor-driven AFW pumps. A single short circuit can defeat the common control circuit, thereby preventing automatic initiation of the motor-driven AFW pumps. Note that manual initiation and control of the AFW pumps is not impacted by this condition.
This condition does not conform to the provisions of Institute of Electrical and Electronics Engineers (IEEE) Standard 279-1971 or the Millstone Unit No. 2 Electrical Separation Specification.
Specifically, only one ladder logic scheme is used for both trains of automatic initiation of the AFW system. The other schemes used
1 4 U.S. Nuclear Regulatory Commission B14859/Page 3 May 27, 1994 in the engineered safety features actuation system utilize redundant and independent logic matrices.
NNECO has been evaluating options to resolve this issue. However, due to the complexity of this issue, NNECO has concluded that there are no apparent design changes which could provide short-term resolution of this condition. Instead, NNECO has concluded that it would be prudent to more thoroughly evaluate the options and design, engineer, install, and test a modification to resolve these issues during the next refueling outage.
NNECO believes that it is safe to operate Millstone Unit No. 2 for the remainder of Cycle 12 until a long-term resolution is implemented during the next refueling outage. However, in order to resume operation, Millstone Unit No. 2 must meet the operability requirements of each of the applicable technical specifications, including those pertaining to automatic initiation of the AFW system. NNECO has concluded that we cannot meet the operability requirements concerning automatic initiation of the AFW system.
Accordingly, NNECO has determined that the definition of operability must be modified until the single failure concern can be resolved by design changes. NNECO is hereby proposing to change the Millstone Unit No. 2 Technical Specifications for the remainder of Cycle 12 by providing a definition of operability for the automatic initiation logic for the AFW system that can be met by the current design. Modifications will be implemented prior to startup for Cycle 13 to bring the automatic initiation logic into compliance with NNECO's previous commitments, or we will work with ;
the NRC Staff to properly change the subject commitments.
Description of ProDosed Chances NNECO proposes to include a footnote in Tables 3.3-3, 3.3-4 and 3.3-5 of the Millstone Unit No. 2 Technical Specifications that would denote that operability of the automatic initiation logic for the AFW system will rely upon operator action for the remainder of Cycle 12 operation. Additionally, NNECO proposes to incorporate references to past License Amendments that have affectsd each of the subject technical specification pages. I l
NNECO proposes to add the following footnote to Tables 3.3-3, 3.3-4 l and 3.3-5 of the Millstone Unit No. 2 Technical Specifications:
"For Cycle 12 only, OPERABILITY of the auxiliary feedwater (AFW) automatic initiation logic will rely on operator action to ensure successful initiation of AFW. Prior to startup for Cycle 13, modifications to the automatic initiation logic for '
AFW will be implemented which will eliminate the reliance on operator action."
, . l U.S. Nuclear Regulatory Commission B14859/Page 4 May 27, 1994 Also, NNECO is proposing to add references to the past License Amendments that have affected each of the subject technical specification pages.
Safety Assessment The potential for a short circuit in the wiring of the AFW automatic initiation system, that would render the automatic initiation system inoperable, has been identified. A change is being proposed to Technical Specification Tables 3.3-3, 3.3-4 and 3.3-5 to specify that operator action would be relied upon to ensure initiation of the AFW system in the event that there is a demand for AFW concurrent with this postulated single failure.
The automatic AFW initiation signals and circuits are required to be designed such that a single failure will not result in the loss of the automatic initiation capability of the AFW System. In addition, the applicable IEEE standards require that short circuits be postulated as part of the single failure analysis. With the identification of the potential for a short circuit that could render automatic AFW initiation inoperable, the design requirements for automatic initiation of AFW are no longer met. However, we have evaluated the potential for this short circuit to occur and have concluded that the probability of the postulated single failure is extremely low.
The potential short circuits fall into two categories: 1) line to line short in the cable and 2) short circuits in the control cabinets. Using generic "line to line" short circuit failure rates and the monthly test interval currently required by the Millstone Unit No. 2 Technical Specifications, the probability of a short circuit that would disable automatic initiation of AFW, given a loss of normal feedwater event, is approximately 105 This value is derived by using the expression [(1/2) lambda (T)], where lambda is the generic line-to-line short circuit failure rate of 2.7E-8/ hour (mean value) derived from the median value of 1.0E-8/ hour in WASH-1400; and T is the mean time between tests, which is 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> for monthly testing. Furthermore, there are several special features of the particular cable installation that make the failure probability extremely low, if not incredible.
The cable is enclosed in a metal casing; thus, the susceptibility to external damage is very low. Additionally, the cable in j question is a control cable carrying a low current (150 milli-amps) {
in a cable whose ampacity far exceeds that. Thus, the potential i for a fire due to self ignition is negligibly low. There is only one other cable in the metal casing. It io also an IEEE qualified j low current carrying cable. Finally, the cable has been in ]
operation for several years, with no indication of failure.
I
U.S. Nuclear Regulatory Commission B14859/Page 5 May 27, 1994 The control cabinets and cable are located in the control room.
The control room is provided with active fire detection and manual suppression. The cabinets are seismically qualified. The monthly testing of the automatic initiation circuitry will detect any of ,
the postulated short circuits. l l
Thus, we conclude that the probability of these types of short circuits is extremely low. 1 The identified short circuit could affect the AFW response for events where main feedwater is lost. This includes the loss of main feedwater event analyzed in Chapter 14 of the Final Safety ,
Analysis Report (FSAR).
1 The limiting FSAR Chapter 14 transient with respect to minimum AFW l flow requirements is the loss of main feedwater event. The I limiting FSAR loss of main feedwater event assumes that AFW is i started manually 10 minutes after the initiation of the event.
Thus, a single failure that precludes the automatic initiation of I the motor-driven pumps is bounded by the current FSAR analysis. l Automatic initiation of AFW is 41so credited in demonstrating that the AFW system meets the reliability requirements specified in Section 10.4.9 of the Standard Review Plan, as required by NUREG-0737. However, considering the extremely low probability of this type of failure and the short duration for which this vulnerability will exist, there is no significant impact on the overall reliability of the AFW system and the requirements of Section i 10.4.9 of the Standard Review Plan still are met.
The identified potential for short circuits has no impact on the anticipated transient without scram (ATWS) mitigation system actuating circuitry or the manual AFW initiation control circuitry.
In terms of operator action, confirmation of proper feedwater response is already included in the standard post trip actions as specified by the Emergency Operating Procedures. Actions within the standard post-trip action direct that AFW be initiated and the steam generator be fed if feedwater is lost. Considering the fact that the current design basis loss of feedwater analysis demonstrates acceptable results with no AFW for ten minutes, the current Emergency Operating Procedures are sufficient to assure adequate AFW response in a loss of feedwater event even if a short circuit occurs that disables the automatic initiation feature.
The automatic initiation logic for the AFW system will remain ;
energized during this period and will be placed in bypass during monthly surveillance testing.
es U.S. Nuclear Regulatory Commission B14859/Page 6 May 27, 1994 Additionally, references to past License Amendments that affected the sub-lect technical specification pages were added. These changes improve clarity and are administrative. They have no impact on public health and safety.
Based on the above, the proposed changes to Tables 3.3-3, 3.3-4, and 3.3-5 of the Millstone Unit No. 2 Technical Specifications do not pose a condition adverse to safety. Also, implementation of these proposed changes cannot create any adverse safety consequences.
Justification for Emeraency License Amendment Pursuant to 10CFR50. 91 (a) ( 5) , NNECO hereby requests NRC Staff
" emergency" approval of the proposed amendment to Operating License DPR-65. Currently, Millstone Unit No. 2 is operating in Mode 5.
Action Statement b for LCO 3.3.2.1 prevents Millstone Unit No. 2 from entering Mode 3 if the automatic initiation logic for the AFW system is inoperable. This requirement would prevent resumption of operation following the unscheduled outage to repair a reactor coolant pump seal. To avoid an unnecessary delay in plant startup, emergency authorization is required by May 31, 1994.
This emergency situation could not be avoided for the following reasons. The single failure vulnerability was identified during the current unscheduled outage to repair a reactor coolant pump l seal. Since discovery, NNECO has been evaluating options to '
resolve this issue. However, due to the complexity of this issue, l NNECO has concluded that there are no apparent design changes which ]
could provide short-term resolution of this condition. Instead, l NNECO has concluded that it would be prudent to more thoroughly evaluate the options and design, engineer, install, and test a modification to resolve these issues during the next refueling outage.
In order to resume operation, Millstone Unit No. 2 must meet the operability requirements of each of the applicable technical specifications, including those pertaining to automatic initiation of the AFW system. NNECO has concluded that we cannot meet the operability requirements concerning automatic initiation of AFW.
Accordingly, NNECO has determined that the definition of operability must be modified until the single failure concern can be resolved by design changes. NNECO is hereby proposing to change the Millstone Unit No. 2 Technical Specifications for the remainder of Cycle 12 by providing a definition of operability for the automatic initiation logic for the AFW system that can be met by the current design. Modifications will be implemented prior to startup for Cycle 13 which will bring the automatic initiation logic into compliance with NNECO's previous commitments, or we will work with the NRC Staff to properly change the subject commitments.
l l
U.S. Nuclear Regulatory Commission B14859/Page 7 ,
May 27, 1994 l l
The requested emergency license amendment is appropriate because the proposed changes do not involve an undue risk to public health and safety and do not involve a significant hazards consideration (SHC). NNECO has determined that these proposed changes are technically acceptable and do not significantly reduce any margin of safety. l l
Sionificant Hazards Consideration NNECO has reviewed the proposed changes in accordance with l 10CFR50.92 and concluded that the changes do not involve a SHC. l The basis for this conclusion is that the three criteria of 10CFR50. 92 (c) are not compromised. The proposed changes do not involve a SHC because the changes would not:
- 1. Involve a significant increase in the probability or consequences of an roccident previously analyzed. ;
Although virtually all design basis events either explicitly or implicitly rely on auxiliary feedwater for decay heat removal, the loss of normal feedwater event is the most limiting from the standpoint of AFW systen performance both in terms of timing and the minimum flow requirements.
The identified single failure would prevent the auto initiation of both motor-driven pumps. The design basis loss of normal feedwater event presented in FSAR Section 14.2.7 does not rely on the automatic initiation of the AFW system. !
This analysis relies on the operator manually initiating AFW via the turbine-driven AFW pump 10 minutes after the initiation of the event. Because no credit was taken for the automatic initiation of AFW following the limiting loss of main feedwater event, the consequences of this event are not l increased.
The proposed changes will have no significant impact on the probability of occurrence of any design basis accident. The proposed changes can affect only the response of the AFW system to a plant transient. They cannot have any impact on the probability of a loss of normal feedwater or any other accidents described in Chapter 14 of the FSAR.
Although the probability of system failure is increased due to l reliance on operator action, the increase in failure probability is not significant. Confirmation of proper feedwater response is already included in the standard post trip actions as specified by the Emergency Operating Procedures. Manual initiation of the AFW system is directed by the emergency operating procedures, addressed in training, and routinely practiced on the simulator. Experience has
U.S. Nuclear Regulatory Commission B14859/Page 8 May 27, 1994 demonstrated that these manual actions are taken very quickly.
Therefore, although the probability of system failure has increased somewhat by reliance on short-term operator action, the increase is not judged to be significant.
Adding references to past License Amendments that have l affected the subject technical specification pages are 1 administrative changes. )
i Based on the above, the proposed changes do not involve an i increase in the probability or consequences of an accident I previously analyzed.
- 2. Create the possibility of a new or different kind of accident from any previously analyzed.
The identified single failure impacts the automatic initiation of the AFW system. This potential failure of AFW does not impact the plant response to any transient or accident.
Although the probability of system failure is increased due to reliance on operator action, the increase in failure probability is not significant. Confirmation of proper feedwater response is already included in the standard post trip actions as specified by the emergency operating procedures. Manual initiation of the AFW system is directed by the emergency operating procedures, addressed in training, and routinely practiced on the simulator. Experience has demonstrated that these manual actions are taken very quickly. )
Therefore, although the probability of system failure has '
I increased somewhat by rel4.ance on short-term operator action, the increase is not judged to be significant.
Adding references to past License Amendments that have I affected the subject technical specification pages are I administrative changes. l Thus, the proposed changes do not create the possibility of a new or different kind of accident from any previously ,
analyzed. l I
- 3. Involve a significant reduction in the margin of safety. l The identified single failure does not involve a significant reduction in the margin of safety. The limiting transient with respect to minimum AFW flow requirements is the loss of l main feedwater event. The identified single failure which prevents the automatic initiation of AFW does not impact the loss of main feedwater event consequences, as this event takes credit for manual initiation of the turbine driven AFW pump l I
.:
- l, U.S. Nuclear Regulatory Commission B14859/Page 9 May 27, 1994 10 minutes after the initiation of the event. In addition, based upon a review of the probability of a short circuit that could disable automatic initiation of auxiliary feedwater, it is concluded that probability of this failure is extremely low and the overall reliability of auxiliary feedwater system is not affected.
Adding references to past License Amendments that have affected the subject technical specification pages are administrative changes.
Based on the above, there is no significant reduction in the margin of safety.
The Commission has provided guidance concerning the application of the standards of 10CFR50.92 by providing certain examples (51 FR 7751, March 6, 1986) of amendments that are not considered likely to involve a SHC. The proposed changes to include references to past License Amendments which affected the subject technical specification pages is enveloped by example (i), "A purely administrative change to technical specifications: for example, a change to achieve consistency throughout the technical specifications, correction of an error, or a change in nomenclature." The proposed changes to denote in Tables 3.3-3, 3.3-4 and 3.3-5 of the Millstone Unit No. 2 Technical Specifications that the operability of the automatic initiation logic of the AFW system will rely on operator action for the remainder of Cycle 12 operation are not enveloped by any of the examples. However, as demonstrated above, the changes do not involve a significant hazards consideration.
Recuest for Enforcement Discretion F
NNECO hereby requests the NRC Staff exercise discretion not to enforce compliance with the required actions for Millstone Unit No. 2 LCO 3.3.2.1 should the processing of the proposed license amendment not be completed by May 31, 1994. NNECO hereby provides justification for enforcement discretion associated with the above LCO.
- 1. The Technical Soecification Condition that Will Be Violated Millstone Unit No. 2 LCO 3.3.2.1 requires the operability of the engineered safety feature actuation system instrumentation shown in Table 3.3-3. The automatic initiation logic of the AFW system is one of the systems that are required to be operable. Action Statement b for this LCO requires that the actions shown in Table 3.3-3 be taken. In this case, Table 3.3-3 requires the automatic initiation logic of the AFW
l 1
U.S. Nuclear Regulatory Commission B14859/Page 10 May 27, 1994 system be returned to an operable status prior to entering Mode 3.
NNECO is requesting enforcement discretion from the LCO of ,
3.3.2.1 to permit Millstone Unit No. 2 to avoid an unnecessary 1 delay in plant startup. The discretion is requested to be effective until the amendment is issued and implemented. This discretion would permit NNECO to startup and operate Millstone Unit No. 2 while the proposed license amendment is being processed.
- 2. The Circumstances Surroundina the Situation Includina the Need for Promot Action Currently, Millstone Unit No. 2 is operating in Mode 5.
Action Statement b for LCO 3.3.2.1 prevents Millstone Unit )
No. 2 from entering Mode 3 if the automatic initiation logic j for the AFW system is inoperable. This requirement would '
prevent resumption of operation following the unscheduled outage to repair a reactor coolant pump seal. To avoid an unnecessary delay in plant startup, emergency authorization is i required by May 31, 1994.
This emergency situation could not be avoided for the following reasons. The single failure vulnerability was identified during the current unscheduled outage to repair a i reactor coolant pump seal. Since discovery, NNECO has been evaluating options to resolve this issue. However, due to the complexity of this issue, NNECO has concluded that there are no apparent design changes which could provide short-term resolution of this condition. Instead, NNECO has concluded that it would be prudent to more thoroughly evaluate the options and design, engineer, install, and test a modification ,
to resolve these issues during the next refueling outage, if !
necessary. I l
In order to resume operation, NNECO has to ensure that Millstone Unit No. 2 meets the operability requirements of ;
each of the applicable technical specifications, including those pertaining to automatic initiation of the AFW system.
NNECO has concluded that we cannot meet the operability requirements concerning automatic initiation of AFW.
Accordingly, NNECO has determined that the definition of operability must be modified until the single failure concern can be resolved by design changes. NNECO is hereby proposing to change the Millstone Unit No. 2 Technical Specifications for the remainder of Cycle 12 by providing a definition of operability for the automatic initiation logic for the AFW i system that can be met by the current design. Modifications !
will be implemented prior to startup for Cycle 13 which will
l U.S. Nuclear Regulatory Commission B14859/Page 11 May 27, 1994 l
bring the automatic initiation logic into compliance with j NNECO's previous commitments, or we will work with the NRC Staff to properly change the subject commitments.
The requested enforcement discretion is appropriate because the proposed changes do not involve an SHC.
- 3. Safety Basis for the Recuest NNECO believes that there is a small and acceptas;1e safety significance or potential consequence associated with this enforcement discretion. As discussed in the Safety Assessment Section of this letter, the proposed changes to Tables 3.3-3, 3.3-4, and 3.3-5 of the Millstone Unit No. 2 Technical Specifications to rely on operator action to ensure initiation of the AFW system are safe and justifiable for the remainder of Cycle 12,
- 4. Compensatory Measures A Night Order wil.1 be issued to inform the operators of the increased reliance on manual initiation of the AFW system.
- 5. Duration of Reauested Waiver The enforcement discretion is being requested for the period of time until the license amendment is issued by the NRC.
This will permit Millstone Unit No. 2 to startup and operate in Modes 1, 2, or 3.
- 6. Basis for No Sianificant Hazards Consideration The basis for this enforcement discretion not involving an SHC is the same as previously discussed for the proposed license amendment.
- 7. Basis for No Irreversible Environmental Consecuences The requested enforcement discretion involves no irreversible environmental consequences. The proposed changes do not result in a reduction in a margin of safety, do not affect the calculated doses, and do not impact the capability of systems to perform their intended safety function to control the release of radiological effluents. Also, they do not affect the associated non-radiological effluents. Thus, the proposed changes do not negatively impact the public health and safety.
l 1
l 1
- - _ _ - - - - - _ - l
4
- U.S. Nuclear Regulatory Commission B14859/Page 12 May 27, 1994
- 8. Safety Moving The Millstone Unit No. 2 Plant Operations Review Committee (PORC) and Nuclear Review Board (NRB) have reviewed and concurred with this request for enforcement discretion.
- 9. Additional Information Additional information has been supplied throughout the text of this submittal.
In summary, the proposed enforcement discretion would permit Millstone Unit No. 2 to startup and operate at 100% power until the proposed license amendment is issued. This request is safe, and does not constitute an SHC.
Enh_ mental Considerations NNECO has reviewed the proposed license amendment against the criteria of 10CFR51.22 for environmental considerations. The proposed changes do not increase the types and amounts of effluents that may be released offsite, nor significantly increase individual or cumulativo occupational radiation exposures. Based on the foregoing, NNECO concludes that the proposed changes meet the criteria delineated in 10CFR51.22(c) (9) for a categorical exclusion from the requirements for an environmental impact statement.
The Millstone Unit No. 2 NRB has reviewed and concurred with the above determinations.
In accordance with 10CFR50.91(b) , we are providing the State of Connecticut with a copy of this proposed amendment via facsimile to ensure their awareness of this request.
Schedule Recuired for NRC Anoroval As discussed previously, authorization of these proposed changes is necessary to permit Millstone Unit No. 2 to resume operations after an unscheduled outage to repair a reactor coolant pump seal. NNECO is requesting emergency approval prior to entering Mode 3. This request is needed by May 31, 1994, to avoid an unnecessary delay in plant startup.
Alternatively, NNECO is requesting that the NRC Staff exercise enforcement discretion associated with LCO 3.3.2.1 to be effective until the amendment is issued. By exercising enforcement discretion, the NRC Staff would. permit Millstone Unit No. 2 to resume operations following the unscheduled outage to repair a reactor coolant pump seal while awaiting issuance of the proposed revision to the Millstone Unit No. 2 Technical Specifications.
I U.S. Nuclear Regulatory Commission B14859/Page 13 May 27, 1994 NNECO wishes to emphasize our conclusion that this proposed license amendment does not involve any undue safety risk or irreversible environmental consequences.
If the NRC Staff should have any questions or comments regarding this submittal, please contact Mr. R. H. Young at (202) 665-3717.
We will promptly provide any additional information the NRC Staff may need to respond to this request, and we appreciate your efforts in support of this request.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY FOR: J. F. Opeka Executive Vice President
/
BY: / t (llCP -
- 5. E. Scdce Vice President cc: T. T. Martin, Region I Administrator G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 P. D. Swetland, Senior Resident Inspector, Millstone Unit Nos. 1, 2, and 3 l Mr. Kevin T.A. McCarthy, Director Monitoring and Radiation Division Department of Environmental Protection 79 Elm Street P.O. Box 5066 Hartford, CT 06102-5066 )
Subscribed and sworn to before me this 574 day of AMv , 1994
/
l ,? par / f y ,1, )$/. n uw Date Commission Expires: /db!!?7
)
I i
i i
1
Docket No. 50-336 B14859 Attachment 1 Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specifications Autoiaatic Initiation of the Auxiliary Feedwater System Marked-up Pages e
May 1994