B13630, Proposed Tech Specs Re Containment Spray Interlock

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Containment Spray Interlock
ML20059J157
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/11/1990
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20059J155 List:
References
B13630, NUDOCS 9009190198
Download: ML20059J157 (2)


Text

-._

Docket No. 50-245 B13630 I

i i

1 l

i Attachment No. l Millstone Nuclear Power Station Unit No. 1 Emergency Technical Specification Change Request Containment Spray Interlock 7

t P

i

?

I r

i l

F l'

l t.

September 1990 9009190198 900911 POR ADOCK 05000245 P

PDC

.i

~

TABLE 3.2.2 (Continued)

INSTRUMENTATION THAT INITIATES AND CONTROLS THE EMERGENCY CORE COOLING SYSTEMS Minimum Number of Operable Inst.

Trip Function Trip Level Setting Remarks Channels Per Trip System (1) 1 Timer, Isolation

< 15 seconds 1-In conjunction with Conder tr high reactor pressure, initiates Isolation Condenser.

1 Timer Auto Blowdown

< 120 seconds 1-In conjunction with low low reactor water level and high drywell pressure and LP core cooling pump interlock.

2 Containment Spray 3 2/3 Core Height i.e.,

1-Prevent inadvertent Interlock

-175 inches operation of containment 9.0 $ P g 10.0 psig spray.

2 APR LP Core Cooling 90 < P < 110 Psig 1-Defer APR actuation Pump. Interlock pending confirmation of LP core coolinq system operation.

2 se+s of 2 Power Available on Normal for 120 Volt 1-Permissive for auto-(Total)

Emergency Buses undervoltage relays close of emergency (Monitor Buses 5 and 6) power source on buses.

2-Persmissive to start core spray and LPCI pumps.

Millstone Unit 1 3/4 2-5 L

_-__