3F1296-03, Monthly Operating Rept for Nov 1996 for Crystal River Unit 3

From kanterella
(Redirected from 3F1296-03)
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1996 for Crystal River Unit 3
ML20132C388
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/30/1996
From: Dao T, Kelley L
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F1296-03, 3F1296-3, NUDOCS 9612180321
Download: ML20132C388 (5)


Text

Florida Power CORPORATION EM*

December 13, 1996 3F1296-03 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555-0001

Subject:

Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit-3 November 1996 Monthly Operating Report.

This report is submitted in accordance with Technical Specification 5.7.1.2.

Since ly, Larr ~

y Director, Nuclear Operation /

L Site Support LCK/ff Attachment F

xt:

Regional Administrator, Region II g)(,

Senior Resident Inspector NRR Project Manager p-DR DO 0500 02 R

PDR CRYSTAL RIVER ENERGY COMPLEX: 15760 W Power une St. Crystal River, Florida 344284708 e (352) 7954486 A Flanda Progress Company i

-. ~. -.. -

OPERATING DATA REPORT DOCKET NO.

50-302 UNIT FLCRP-3 DATE DEC 2,1996 I

COMPLETED BY T V Dao i

TELEPHONE (352) 795-6486 f

OPERATING STATUS 1.. U NIT N AM E:........................

CRYSTAL RIVER UNIT 3

2. REPORTING PERIOD:............

...... NOVEMBER -

3. LICENSEDTHERMAL POWER (MWt):.

t

............ 2544' 4.

NAMEPLATE RATING (GROSS MWe):.........-........ 890

)

l

5. DESIGN ELECTRICAL RATING (NETMWe):........,. - 825

- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. 860 i

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):..... 818 i
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE i

l i

l

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

N/A

10. REASONS FOR RESTRICTIONS,IF ANY:

N/A i

THIS MONTH YR. TO DATE CUMULATIVE j

11. HOURS IN REPORTING PERIOD 720.0' 8,040.0 -

172.872.0

13. NUMBER OF HOURS REACTOR WAS CRITICAL

'O.04 3,308.1 -

117.416.2-

13. REACTOR RESERV.*: SHUTDOWN HOURS 0.0 '

O.0 1,280.C '

j

14. HRS GENERATOR ON LINE 10.0 -

3.109.5-

' 115,328.7L

15. UNIT RESFi% i SHUTDOWN HOURS 0.0

" 0.0 $

'O.0-I

16. GROSS THERMAL ENERGY GENERATED (MWH) 0 7.465.0522 268.847.210 i
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 01 2.547,840 91,894.033
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 2.417.371 87,402,384 -
19. UNIT SERVICE FACTOR 0.0%

38.7 %

66.7 %

20. UNIT AVAILABLE FACTOR t

0.0%

38.7 %

66.7 %

21. UNIT CAPACITY FACTOR (using MDC net) 0.0%

36.8 %

62.6 %

22. UNIT CAPACITY FACTOR (using DER net) 0.0%

- 36.4%

61.3 %

h 83 UNIT FORCED OUTAGE RATE 100.0 %

46.7%

16.6 %

24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

Continuation of the Lube oil outage until February 28,1997 to implement modifications to improve various safety margins.

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP; FEBRUARY 28.1997 5
28. I fNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

HIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED INmAL CRITICALITY NA NA INmAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA e

1

AVERAGE DAILY UNIT POWER LEVEL

-t t

DOCKET NO.

50-302 UNIT FLCRP-3 DATE DEC 2,1996 COMPLETED BY T V Dao TELEPHONE (352)795-6486 i

MONTH NOVEMBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

l 2

0 18 0

3 0

19

'O l

4 0

20 0'

l l

5 0

21 0

6 0

22 0-

)

7 0:

23 0.

8

'O 24 0

l 9

0' 25 0

10 0

26 0

11 0-27 0

12 0--

28 0'

13 0

29 0

14 0

30 0

15

-0 31 N/A 16 0

INSTRUCTIONS:

l On this format, list the daily average unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

s i

l l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-302 UNIT FLCRP-3 g,

REPORT MONTH. NOVEMBER DATE DEC 2,1996 COMPLETED BY T V Dao TELEPHONE

. (352)795-6486 NO.

DATE TYPE (1)

DURATION REASON (2)

MET 110D OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE ilOURS SHUTTING EVENT CODE (4)

CODE (5)

ACTION TO PREVENT

~

DOWN REACTOR (3) REPORT #

RECURRENCE 96-28 961101 F

720 D

4

~96-020-00 EE ENGINE Reactor remained in cold shutdown to prepare for modifications to improve various safety margins.

I 1

l 1

2 3

4 5

F: FORCED NASoft METHOO EXHIBIT G,mm w:sar3*tS EXHIBIT I-SAME SOURCE S-SCHEDULED A-EQUIPMENT FAILURE 1-MANUAL FOR PNPARATION OF DATA B-MAINTENANCE OR TEST 2-M ANUAL SCRAM ENTRY SHEETS FOR LICENSEE C-REFUELING MUTO SCRAM EVENT REPORT (LEFg FILE 1

D-REGULATORY NSTRICTION 4-CONTINUED (NUREG-.0 t e t)

E-OPERATOR TRANNG &

5-REDUCED LOAD LICENSE ADMINISTRATION 9-OTHER F-ADMHSTRATION 0-OPERATIONAL ERROR (EXPLAIN)

H-OTHER

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO.

50-302 UNrT FLCRP-3 DATE DEC 2.1996 COMPLETED BY T V Dao TELEPHONE (352) 795-6486 MONTH: NOVEMBER

SUMMARY

STATEMENT:

Crystal River remained in cold shutdown through November to resolve the emergency diesel generator maximum electricalloading issue and to prepare for modifications to improve various safety margins.