3F1286-11, Monthly Operating Rept for Nov 1986

From kanterella
(Redirected from 3F1286-11)
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1986
ML20211Q201
Person / Time
Site: Crystal River 
Issue date: 11/30/1986
From: Graham D, Eric Simpson
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F1286-11, NUDOCS 8703030036
Download: ML20211Q201 (5)


Text

. _ _ _

I OPERATING DATA REPORT

~

DOCKETNO.80-301 DAtt CDNPLSTED SY m

TELEPHONE 3802 OPERATING 5TATUS 4

1. Unit Neme:

Crystal River Unit 3 Notes

2. Reporting Portad.

11/1/s8 - 11/so/ss

3. Llosaaed Tlunnel Power (MWt):

2544

4. Neswpiste Rating (Crom MWe):

890

f. Design Electrieel Rating (Net MWe):

825

6. Maximum Dependeble Cepecity (Csese MWe):

860

7. Mealmen Dependable Capacity (Not MWe):

821

8. If Changes Occur in Cepeelty Ratings (1: ems Nanber 3 Threagh 7) Since Last Repo'et. Give Renese NA

~

~

9. Power Level Te Which Restricted. lf Any (Net MWe):

NA

10. Reasons For Restrictions. If Amy: NA This Meath Yr..to.Dete Cusselstive
11. Hoare la Reporting Period 720 8018 85200
12. Number Of Neurs Reester Wee Critieel 27p.2 3522.1 53523.1
13. Roseter Reserve Sheedown Houre 0

~

0 1280.3

14. Heers Cemeester on Line 275.5 3497.7

_ 52588.5

18. UsH Ressree $heodown News

-- 0 0

___ 0

16. Gsees Thermal Basesy Generated (MWN) 5 7981931

-- 118460796 50072

~

17. Geone Dessrisal taarty Geesseted (MWH) 189342 2750342

_ 40508844

~

l

14. Not Electrieel Emergy Cemented (MWM) 178118 2810590

__ 3347017s

19. Unit Servise Faesar 38 3 %

~

43.8 %

81.7 %

20. Unia Avegebery Fesser

_ 3 8.3%

43.8%

81.7 %

21. Unit Corneity Feeser (Using MDC Net) 30.1 %

39.7%

54.5 %

~

22. Unit cepeelty Foster (Ushis DER Net) 30.0%
23. Unit Forced Oussee Rate 43.3 %

39.5%

S4.7%

55.1%

13.4 %

~

24. 36medewee $cheduAnd Over Nest 4 Months (Type. Dese. and Dureeles ef Eachi:

None

25. If Shut Down At End Of Report Period. F eteisted Deee of Sertup.12/13/86
26. Units la Test Steens iPrior to Commereimi Operation):

Foreest Aehieved i

/'I \\

III4III INITIAL CRITICALITY INITIAL ELECTRICITY

=

COMMERCIAL OPERAT10N

-I/3 U#'I7 J/1J/I2

\\\\

8703030036 861130 PDR ADOCK 05000302 R

I PDR E

.M

?..

I uppgy seguyggpques age ym agggtygggg DOCKETNO. - W302 j

UNIT MAISE FLCRP-3 DATE - 32/2/88 RMY80GIEN 33/3s COGNI.ETED gy S. A. Ettmerart l

1ELEre00psE --- (9M)195-3802 l

.I 'ii

'Is f a 't Lksusse kai k

rawee & C esecesse 3*

.a i Evans ay p

c Acei.e s.,

p 38-27 astIM F

8.0 B

,5 NA liti VA LVE,X Plain Feedwater Pusep 2R was taken off-line to chmage the governor.

1 M-28 861111 P

9.9 A

5 NA RB CRDRVE Control rod autonsatically dropped lato core asw! reduced power.

i M-19 Mill!

S 234.1 A

I NA RB CRDRVE Took asalt off-line to replace a control rod stator and perforse additional preventative I

menintenance activities.

84-34 M1122 P

218.4 A

4 NA CJ IITEXCH Prianary coolant leak into the Niacteor Services Cooling Systene via a failiare la the "A" letdown cooler kept the plant Mf-line. Replacing the letdown cooter.

l i

I a

2

'I F F.w.ed Asamen:

4 Enkhd 5 54emauled A Equipasses Fallmos(FM Estishit G. Inserei-sames B her Test s,,,eae,l f,or Psepasasium esi Desa C Itefestems g.gg,,,,,3 sc, Emers Sheets for Leiamew 3-asete Scram E*ess Recurs ILERIFde eNt'Rt s.

D-Regdae.ny Rewrkseen 4-Conteaued 01686 E eperas.= Teminsag a license Esamanaeine 5-a m ed te.d F-Adswasseessive Geperasaund Ereve(Emplain) 5 i s*Un HOsber(Earlekst Em I.5asme 5=v

+

-.m

.. - - - +.

AYEn4cg D AILY UNIT POWER Lgygg ih? -

DOCKET NO, 50-302 UNIT FLCRP-3 DATE _12/3/$6 COMPL3TED BY

_D. Graham TELEPHONg (904) 795-3802 MONTH November 1986 DAY AVERAGE DAILYPOWER LEVEL DAY AYERAGE DAILY POWER LEVEL (MWe Net)

(HWeWet) 808 37 0

2 8II

~~

1g 0

3 805 19 0

4 813 20 0

g 812 21 0

g 765 22 0

(

314 23 0

g 300 24 0

i.

454 25 0

10 808 26 0

802 27 0

12 133 28 0

13 0

3 0

14 0

30 0

IS 0

38 0

16 0

INSTRUCTIONS On this format,1 se the average daily unit power levet in MWe Net for each day in the repumns the nearest whole mepwatt.

I

, i.

N/771

---Wm-am

---.-re-mm--we-ww-e--m--

e-

-ww-Tw g

e wewy-

--w

. ewe q.r

.-nar*,--

w-

'm m

-e-------

---e

MONTALY OPERATIONAL $UMMARY STATDGQfT ili.

DOCl3T NO. 50-302 UNIT FLCRP-3 DAfg 12/2/86 CONFLRTED BY 5. A. Stewart TELEPHONg (904) 795-3802 NONTE November.1986

SUMMARY

STATEMENT:

Crystal River Unit 3 was taken off-line on November 11,1986 to replace a defective control rod drive (CRD) stator. The plant remained off-line to replace both of the letdown coolers.

D l

l l

l

(

d!%

DOCKET COPY w.g,,...;

0 0 A P Q m a t i c as December 10, 1986 3F1286-11 l

Mr. James M. Taylor, Of ractor Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn:

Document Contro1 Desk

~ ~ '" ~ Wa~s hi ng ton, DC 20555

~

~

Subject:

Crystal Rfver Unf t 3 Docket No. 50-302 Operating License No. OPR-72 Monthly Operating Report

(

Dear Str:

Attached are twelve (12) copies of the Crystal River Unit 3 November 1986 Monthly Operating Report.

Thase reports are submitted in accordance with Technical Specification 6.9.1.6 Sincerely, E. C. Simpson Director, Nuclear Operations Engineering and Licensing AEF/feb Attachments cert M xc:

Dr. J. Nelson Grace Regional Administrator, Region II office of Inspection & Enforcement U.S. Nuclear Regulatory Consnission 101 Marietta Street N.W., Sui te 2900

$p/'

I Atlanta, GA 30323 f

k

/

\\

CENERAL OFFICE: 32ci Thiny-founn street souin -

8.o. som 14o42

  • St. PetersDurg, flonda 33733 ! _.(313) 884 5151 A MoMa Progreen Comuny

-