3F0786-08, Monthly Operating Rept for June 1986
| ML20202F846 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/30/1986 |
| From: | Graham D, Widell R FLORIDA POWER CORP. |
| To: | Taylor J NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| 3F0786-08, 3F786-8, NUDOCS 8607150243 | |
| Download: ML20202F846 (5) | |
Text
__ _
I OPERATING DATA REPORT DOCKET NO.
50-302 DATE 7 /1/R R COMPLETED BY _ D. Grnhnm TELEPHONE (904) 795-3802 OPERATING STATUS
- 1. Unit Name:
Crystal River Unit 3 hotes
- 2. Reporting Period:
6/1/86 - 6/30/86
- 3. Licensed Thermal Power (MWt):
2544
- 4. Nameplate Rating (Gross MWe):
890
- 5. Design Electrical Rating (Net MWe): 825
- 6. Maximum Dependable Capacity (Gross MWe):
860 821
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
NA
- 9. Power Level To Which Restricted,If Any Net MWe):
NA
- 10. Reasons For Restrictions,If Any:
A O
This Month Yr.-to-Date Curaulative i1. Hours In Reporting Period 720 4343 81527
- 12. Number Of Hours Reactor Was Critical 266.3 289.9 57590.9
- 13. Reactor Reserve Shutdown Hours 0
0 1260.3
- 14. Hours Generator On-Line 245.6 269.2 49360
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 561624 616727 111085592
- 17. Gross Electrical Energy Generated (MWH) 190507
- 18. Net Electrical Energy Generated (MWH) 180702 210048 37952110 199282 36043954
- 19. Unit Service Factor 3 4.1.%
6.2 %
60.5%
- 20. Unit Availability Factor 34.1 %
6.2%
60.5%
- 21. Unit Capacity Factor (Using MDC Net) 30.6%
5.6%
_ 55.4 %
- 22. Unit Capacity Factor (Using DER Net) 30.4%
5.6%
53.6 %
- 23. Unit Forced Outage Rate 65.9 %
93.8 %
24.4 %
- 24. Shutdowns Scheduled O5er Next 6 Months (Type. Date and Duration of Each):
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
NA
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved g
INITIA L CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/77 8607150243 860630 PDR ADOCK 05000302
$6N (9/77)
R PDR
\\.h
]
AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.
50-302 UNIT FLC RP-3 DATE 7/1/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 1
MONTH June 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
g7 0
2 0
gg 0
0 o
3 4
0 20 46 0
642 5
21 6
0 22 858 7
0 865 23 8
0 24 855 9
0 745 25 10 0
26 407 0
11 27 758 12 0
28 849 0
860 13 29 14 0
30 848 0
15 3,
0 16 INSTRUCIlONS On this format list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
O (9/77)
O O
O e
50-302 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME F I.C il P-3 DATE 7/1/86 6/86 COW 1.Em n R A. h wnM REPORT MONTH TEL.EPHONE (904) 795 'IR09 n.
E c
,y 7 i 3
$ Ei t icensee
,Eg Cause & Corrective
?
Action to No.
Date g
5 ij s
.s s 5 Event g?
gU fE E
jg Report a mo Present Recurrence H
g 6
86-01 860101 F
458 A
4 86-01 CB PUMPXX The four reactor coolant pumps have been modified and repaired with new pump shafts.
86-02 860620 F
16.4 A
9 86-08 Cil CKTBRK EFIC actuation on "B" OTSG low level due to a closed feedwater control valve.
Reactor remained critical.
I I
2 3
4 F: Forced Reason:
Method Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) for Preparation of Data B Maintenance of Test
[,g*""*3 Entry Sheets for Licensee g,n al Scram C-Refueling 3-Auto Scram Event Report (LER) File (NilRI G-D-Regulatory Restriction 4-continued 0161)
E-Operator Training & License Examination 5-Reduced Load 9-Other F-Administrative G-Operational Error (Explain)
Exhibit I - Same Source (9/77)
H-Other (Explain)
.,8 MONTHLY OPERATIONAL
SUMMARY
STATEMEh7 e
DOCKET NO.
50-302 UNIT F LC R P-3 DATE 7/1/86 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH June 1986
)
SUMMARY
STATEMENT:
Crystal River Unit 3 returned to power on June 20,1986. The unit was taken off line once to correct a feedwater control valve problem.
I e
e
.J
d*ob$I o[i809
,1, c000100*
.....I' t.
Florida Power CO R POR ATION July 8, 1986 3F0786-08 Mr. James M. Taylor, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72
{
Monthly Operating Report
Dear Sir:
l Attached are twelve (12) copies of the Crystal River Unit 3 June 1986 Monthly Operating Report.
These reports are submitted in accordance with Technical Specification 6.9.1.6.
Sincerely, S
l R. C. Widell Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 GENERAL OFFICE: 3201 Thirty fourth Street South St. Petersburg, Florida 33733 * (813) 866-5151 l