3F0786-08, Monthly Operating Rept for June 1986

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1986
ML20202F846
Person / Time
Site: Crystal River 
Issue date: 06/30/1986
From: Graham D, Widell R
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0786-08, 3F786-8, NUDOCS 8607150243
Download: ML20202F846 (5)


Text

__ _

I OPERATING DATA REPORT DOCKET NO.

50-302 DATE 7 /1/R R COMPLETED BY _ D. Grnhnm TELEPHONE (904) 795-3802 OPERATING STATUS

1. Unit Name:

Crystal River Unit 3 hotes

2. Reporting Period:

6/1/86 - 6/30/86

3. Licensed Thermal Power (MWt):

2544

4. Nameplate Rating (Gross MWe):

890

5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe):

860 821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted,If Any Net MWe):

NA

10. Reasons For Restrictions,If Any:

A O

This Month Yr.-to-Date Curaulative i1. Hours In Reporting Period 720 4343 81527

12. Number Of Hours Reactor Was Critical 266.3 289.9 57590.9
13. Reactor Reserve Shutdown Hours 0

0 1260.3

14. Hours Generator On-Line 245.6 269.2 49360
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 561624 616727 111085592
17. Gross Electrical Energy Generated (MWH) 190507
18. Net Electrical Energy Generated (MWH) 180702 210048 37952110 199282 36043954
19. Unit Service Factor 3 4.1.%

6.2 %

60.5%

20. Unit Availability Factor 34.1 %

6.2%

60.5%

21. Unit Capacity Factor (Using MDC Net) 30.6%

5.6%

_ 55.4 %

22. Unit Capacity Factor (Using DER Net) 30.4%

5.6%

53.6 %

23. Unit Forced Outage Rate 65.9 %

93.8 %

24.4 %

24. Shutdowns Scheduled O5er Next 6 Months (Type. Date and Duration of Each):

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

NA

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved g

INITIA L CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/77 8607150243 860630 PDR ADOCK 05000302

$6N (9/77)

R PDR

\\.h

]

AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.

50-302 UNIT FLC RP-3 DATE 7/1/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 1

MONTH June 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

g7 0

2 0

gg 0

0 o

3 4

0 20 46 0

642 5

21 6

0 22 858 7

0 865 23 8

0 24 855 9

0 745 25 10 0

26 407 0

11 27 758 12 0

28 849 0

860 13 29 14 0

30 848 0

15 3,

0 16 INSTRUCIlONS On this format list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

O (9/77)

O O

O e

50-302 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME F I.C il P-3 DATE 7/1/86 6/86 COW 1.Em n R A. h wnM REPORT MONTH TEL.EPHONE (904) 795 'IR09 n.

E c

,y 7 i 3

$ Ei t icensee

,Eg Cause & Corrective

?

Action to No.

Date g

5 ij s

.s s 5 Event g?

gU fE E

jg Report a mo Present Recurrence H

g 6

86-01 860101 F

458 A

4 86-01 CB PUMPXX The four reactor coolant pumps have been modified and repaired with new pump shafts.

86-02 860620 F

16.4 A

9 86-08 Cil CKTBRK EFIC actuation on "B" OTSG low level due to a closed feedwater control valve.

Reactor remained critical.

I I

2 3

4 F: Forced Reason:

Method Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) for Preparation of Data B Maintenance of Test

[,g*""*3 Entry Sheets for Licensee g,n al Scram C-Refueling 3-Auto Scram Event Report (LER) File (NilRI G-D-Regulatory Restriction 4-continued 0161)

E-Operator Training & License Examination 5-Reduced Load 9-Other F-Administrative G-Operational Error (Explain)

Exhibit I - Same Source (9/77)

H-Other (Explain)

.,8 MONTHLY OPERATIONAL

SUMMARY

STATEMEh7 e

DOCKET NO.

50-302 UNIT F LC R P-3 DATE 7/1/86 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH June 1986

)

SUMMARY

STATEMENT:

Crystal River Unit 3 returned to power on June 20,1986. The unit was taken off line once to correct a feedwater control valve problem.

I e

e

.J

d*ob$I o[i809

,1, c000100*

.....I' t.

Florida Power CO R POR ATION July 8, 1986 3F0786-08 Mr. James M. Taylor, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72

{

Monthly Operating Report

Dear Sir:

l Attached are twelve (12) copies of the Crystal River Unit 3 June 1986 Monthly Operating Report.

These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, S

l R. C. Widell Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 GENERAL OFFICE: 3201 Thirty fourth Street South St. Petersburg, Florida 33733 * (813) 866-5151 l

P.O. Box 14042 e

A Florida Progress Company

_-____-