ML20202F846
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/30/1986
From: Graham D, Widell R
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0786-08, 3F786-8, NUDOCS 8607150243
Download: ML20202F846 (5)


Text

__ _

I OPERATING DATA REPORT DOCKET NO. 50-302 DATE 7 /1/R R COMPLETED BY _ D. Grnhnm TELEPHONE (904) 795-3802 OPERATING STATUS

1. Unit Name: Crystal River Unit 3 hotes
2. Reporting Period: 6/1/86 - 6/30/86
3. Licensed Thermal Power (MWt): 2544
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe): 821
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted,If Any Net MWe): NA
10. Reasons For Restrictions,If Any: A O

This Month Yr.-to-Date Curaulative i1. Hours In Reporting Period 720 4343 81527

12. Number Of Hours Reactor Was Critical 266.3 289.9 57590.9
13. Reactor Reserve Shutdown Hours 0 0 1260.3
14. Hours Generator On-Line 245.6 269.2 49360
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 561624 616727 111085592 -
17. Gross Electrical Energy Generated (MWH) 190507 ,

210048 37952110

18. Net Electrical Energy Generated (MWH) 180702 199282 36043954
19. Unit Service Factor 3 4.1.% 6.2 % 60.5%
20. Unit Availability Factor 34.1 % 6.2% 60.5%
21. Unit Capacity Factor (Using MDC Net) 30.6% 5.6%

30.4%

_ 55.4 %

22. Unit Capacity Factor (Using DER Net) 5.6% 53.6 %
23. Unit Forced Outage Rate 65.9 % 93.8 % 24.4 %
24. Shutdowns Scheduled O5er Next 6 Months (Type. Date and Duration of Each):

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup: NA
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved g

INITIA L CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/77 8607150243 860630 PDR ADOCK 05000302 R PDR $6N (9/77)

\.h - -- ]

AVER AGE DAILY UNIT POWER LEVEL

' DOCKET NO. 50-302 UNIT FLC RP-3 DATE 7/1/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 1

MONTH June 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 g7 0 2 0 gg 0 0 o 3 ,,

4 0 46 20 0 642 5 21 6 0 858 22 7 0 865 23 8 0 855 24 9 0 745 25 10 0 407 26 11 0 758 27 -

12 0 849 28 .

0 860 13 29 14 0 848 30 15 0 _

3, _

0 16 INSTRUCIlONS On this format list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

O '

(9/77)

O O O e

DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME F I.C il P-3 DATE 7/1/86 6/86 COW 1.Em n R A. h wnM REPORT MONTH TEL.EPHONE (904) 795 'IR09 n.

- E c

,y 7 i 3 $ Ei t icensee ,Eg $%

?

Cause & Corrective Action to No. Date g 5 ij s .s s 5 Event g? gU H

fE E jg Report a mo g Present Recurrence 6

86-01 860101 F 458 A 4 86-01 CB PUMPXX The four reactor coolant pumps have been modified and repaired with new pump shafts.

86-02 860620 F 16.4 A 9 86-08 Cil CKTBRK EFIC actuation on "B" OTSG low level due to a closed feedwater control valve.

Reactor remained critical.

I I 2 3 4 F: Forced Reason: Method Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) for Preparation of Data B Maintenance of Test [,g*""*3 g,n al Scram Entry Sheets for Licensee C-Refueling 3-Auto Scram Event Report (LER) File (NilRI G-D-Regulatory Restriction ', 4-continued 0161)

E-Operator Training & License Examination 5-Reduced Load F-Administrative 9-Other $

G-Operational Error (Explain) Exhibit I - Same Source (9/77) H-Other (Explain)

.,8 .

MONTHLY OPERATIONAL

SUMMARY

STATEMEh7 e 50-302 DOCKET NO.

UNIT F LC R P-3 DATE 7/1/86 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH June 1986

)

SUMMARY

STATEMENT:

Crystal River Unit 3 returned to power on June 20,1986. The unit was taken off line once to correct a feedwater control valve problem.

I e

e .

- - . . . , . . - . . . . . .J

od*ob$I

[i809 ,1, c000100*

.....I' t.

Florida Power CO R POR ATION July 8, 1986 3F0786-08 Mr. James M. Taylor, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 {

Monthly Operating Report

Dear Sir:

l Attached are twelve (12) copies of the Crystal River Unit 3 June 1986 Monthly Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, S

l R. C. Widell Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 GENERAL OFFICE: 3201 Thirty fourth Street South e P.O. Box 14042

  • St. Petersburg, Florida 33733 * (813) 866-5151 A Florida Progress Company l

_-____-