l@

Florida Power CORPORATION D75 April 13, 1993 3F0493-01 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

Subject:

Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit-3 March 1993 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, G. L.

oldt Vice President Nuclear Production GLB:JBC/ff Attachment xc:

Regional Administrator, Region 11 Senior Resident Inspector NRR Project Manager CRYSTAL RNER NUCLEAR PLANT: Powerline Road + P.O. Box 219 + Crystal River, Florida 344234219 * (904) 795-6486 A Florida Progress Company p

y 9304190341 930331 PDR ADOCK 05000302 i

R PDR b

4 l

l OPERATING DATA REPORT DOCKET NO.

50-302 UNIT FLCRP-3 DATE APRIL 2,1993 COMPLETED BY Ralei9h Smith l

TELEPHONE (904) 795-6486 l

OPERATING STATUS

9. UNIT NAME-CRYSTAL RIVER UNIT 3

... ~..

2. REPORTING PERIOD:...

MARCH 1993 -

3. LICENSEDTHERMAL POWER (MWt)-

2544

(

4.

NAMEPLATE RATING (GROSS MWe)-

.'890

{

5. DESIGN ELECTRICAL RATING (NET MWe):..

825'

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. 860 l
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):....., 821 l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

NA

9. POWER LEVELTOWHICH RESTRICTED,IF ANY(NET MWe):

N/A t

10. REASONS FOR RESTRICTIONS,IF ANY:

N/A THIS MONTH YR.TO DATE CUMULATIVE i

11. HOURS IN REPORTING PERIOD 744.0 2,160.0 140,712.0 l
12. NUMBER OF HOURS REACTOR WAS CRmCAL 78.0 1.494.0 -

92.014.2

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1.280.6
14. HRS GENERATOR ON LINE 74.0 1.490.0 90,272.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 159.796-3.699.875 -

206.263.641 l

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 54.56d 1,271.682 70.446,640 -
18. NET ELECTR6 CAL ENERGY GENERATED (MWH) 51,062 1,212,636

- 66.942,842

19. UNITSERVICEFACTOR 9.9%

69.0 %

64.2 %

20. UNIT AVAILABLE FACTOR 9.9%

69.0 %

64.2 %

21. UNIT CAPACITY FACTOR (using MDC not)

~ 8.4 %

68.4 %

58.9 %

22. UNIT CAPACITY FACTOR (using DER net) 8.3%

C&O%

57.7 %

23. UNIT FORCED OUTAGE RATE 0.0%

0.0%

18.2%

24. SHUTDOWNS SCHEDULED OVER NEXT S!X MONTHS (TYPE, DATE, AND DURATION OF EACH):

MID-CYCLE OUTAGE SCHEDULED FOR MARCH 4,1993 WITH A DURATION OF 56 DAYS.

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP; APRIL 28,1993
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICABLETO CR-3 FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-302 UNIT FLCRP-3 DATE APRIL 2,1993 COMPLETED BY Raleigh Smith TELEPHONE (904) 795-6486 P

i MONTH MARCH f

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 739:

17

'0 2

-730~-

18 0

3 679 19

-O 4

11 20

'O-l 5

'0:

21 <

06

[

6

-O' 22

-O' l

7

'O 23 0

8 0

24 0-9 0

25

'O.

10-

'0 26

?O' i

11 0i 27 0

12 0'

28

'O 13 0-29 0 :'

l 14

.'O-30 0-15

-0 31

'O 16 0'

j INSTRUCTIONS:

On this format, list the daily average unit power level in MWe-Net for each day in the E

reporting month. Compute to the nearest whole megawatt.

j i

~ _ - _ _ _ _ _ _ _ _ _ _ - -. _ _ _. _ _ -. _. _. _.. _ - - - - -. - - - _ - - _ _ - - _ _ _ _ _ _ - - _ _ _ _ _ _ _ -.. - - _ _ - _ _ _ _ _. _ _ - - _ - _ _.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETPC.80-802 UNtf FLCRP-3 REPORT MONTH MARCH DATE APRIL 2,1993 COMPLETED BY g smnh TasPHOwE poeim se j

NO.

DATE TYPE (1)

DURATION REASON (2)

METHOD OF UCENSEE SYSTB4 COMPONENT CAUSE AND CORRECTIVE l

HOURS SHUTTING EVENT CODE (4)

CODE (5)

ACTION TO PREVENT DOWN REACTOR (3) REPORT #

RECURRENCE 93-03 930301 S

65.98 B

5 N/A HC HTEXCH The B water box was taken out of service for retubing.

93-04 930303 S

7.97 8

5 N/A ZZ 777777 Decreased reactor power in preparation of midcycle outage.

P3-05 930304 S

678 B

1 N/A ZZ 777777 Start of midcycle outage.

t a

3 4

6 F: FORCED FIEASOft METHOD EXHIGET O - M87RUCTtDNS EXHerT I. SAME SOURCE 9: SCHEDULED A-EOUIPMENT FAILURE 1-MANUAL FCR PREPARAflON OF DATA S-MAMTENANCE OR TEST t-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE CJETUELMG 3-AUTO SCFMM EVENT REPORT (LErg FILE '

D-REGULATORY RESTRICTION 4-CONTINUED (NUREG-0161)

E-OPERATORTRANNG &

6-REDUCED LOAD LICENSE ADMtNISTRATION S-0THER F-ADMINISTRATION 0-OFTRATIONAL Erm06 (EXW H-OTHER

L MONTHLY OPERATIONAL

SUMMARY

STATEMENT l

i DOCKET NO.

50-302 I

UNIT FLCRP-3 DATE-

_ APRIL 2,1993 t

Rale 1 h Smith COMPLETED BY 9

TELEPHONE (904)795-6486 h

l MONTH: MARCH i

i

SUMMARY

STATEMENT:

Crystal River Unit 3 came off line on March 4 at 0200 to begin the midcycle outage.