l@
Florida Power CORPORATION D75 April 13, 1993 3F0493-01 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555
Subject:
Monthly Operating Report
Dear Sir:
Attached is the Crystal River Unit-3 March 1993 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.
Sincerely, G. L.
oldt Vice President Nuclear Production GLB:JBC/ff Attachment xc:
Regional Administrator, Region 11 Senior Resident Inspector NRR Project Manager CRYSTAL RNER NUCLEAR PLANT: Powerline Road + P.O. Box 219 + Crystal River, Florida 344234219 * (904) 795-6486 A Florida Progress Company p
y 9304190341 930331 PDR ADOCK 05000302 i
R PDR b
4 l
l OPERATING DATA REPORT DOCKET NO.
50-302 UNIT FLCRP-3 DATE APRIL 2,1993 COMPLETED BY Ralei9h Smith l
TELEPHONE (904) 795-6486 l
OPERATING STATUS
- 9. UNIT NAME-CRYSTAL RIVER UNIT 3
... ~..
- 2. REPORTING PERIOD:...
MARCH 1993 -
- 3. LICENSEDTHERMAL POWER (MWt)-
2544
(
4.
NAMEPLATE RATING (GROSS MWe)-
.'890
{
- 5. DESIGN ELECTRICAL RATING (NET MWe):..
825'
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. 860 l
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):....., 821 l
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
NA
- 9. POWER LEVELTOWHICH RESTRICTED,IF ANY(NET MWe):
N/A t
- 10. REASONS FOR RESTRICTIONS,IF ANY:
N/A THIS MONTH YR.TO DATE CUMULATIVE i
- 11. HOURS IN REPORTING PERIOD 744.0 2,160.0 140,712.0 l
- 12. NUMBER OF HOURS REACTOR WAS CRmCAL 78.0 1.494.0 -
92.014.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1.280.6
- 14. HRS GENERATOR ON LINE 74.0 1.490.0 90,272.1
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 159.796-3.699.875 -
206.263.641 l
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 54.56d 1,271.682 70.446,640 -
- 18. NET ELECTR6 CAL ENERGY GENERATED (MWH) 51,062 1,212,636
- 66.942,842
- 19. UNITSERVICEFACTOR 9.9%
69.0 %
64.2 %
- 20. UNIT AVAILABLE FACTOR 9.9%
69.0 %
64.2 %
- 21. UNIT CAPACITY FACTOR (using MDC not)
~ 8.4 %
68.4 %
58.9 %
- 22. UNIT CAPACITY FACTOR (using DER net) 8.3%
C&O%
57.7 %
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
18.2%
- 24. SHUTDOWNS SCHEDULED OVER NEXT S!X MONTHS (TYPE, DATE, AND DURATION OF EACH):
MID-CYCLE OUTAGE SCHEDULED FOR MARCH 4,1993 WITH A DURATION OF 56 DAYS.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP; APRIL 28,1993
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
THIS ITEM IS NOT APPLICABLETO CR-3 FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-302 UNIT FLCRP-3 DATE APRIL 2,1993 COMPLETED BY Raleigh Smith TELEPHONE (904) 795-6486 P
i MONTH MARCH f
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 739:
17
'0 2
-730~-
18 0
3 679 19
-O 4
11 20
'O-l 5
'0:
21 <
06
[
6
-O' 22
-O' l
7
'O 23 0
8 0
24 0-9 0
25
'O.
10-
'0 26
?O' i
11 0i 27 0
12 0'
28
'O 13 0-29 0 :'
l 14
.'O-30 0-15
-0 31
'O 16 0'
j INSTRUCTIONS:
On this format, list the daily average unit power level in MWe-Net for each day in the E
reporting month. Compute to the nearest whole megawatt.
j i
~ _ - _ _ _ _ _ _ _ _ _ _ - -. _ _ _. _ _ -. _. _. _.. _ - - - - -. - - - _ - - _ _ - - _ _ _ _ _ _ - - _ _ _ _ _ _ _ -.. - - _ _ - _ _ _ _ _. _ _ - - _ - _ _.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETPC.80-802 UNtf FLCRP-3 REPORT MONTH MARCH DATE APRIL 2,1993 COMPLETED BY g smnh TasPHOwE poeim se j
NO.
DATE TYPE (1)
DURATION REASON (2)
METHOD OF UCENSEE SYSTB4 COMPONENT CAUSE AND CORRECTIVE l
HOURS SHUTTING EVENT CODE (4)
CODE (5)
ACTION TO PREVENT DOWN REACTOR (3) REPORT #
RECURRENCE 93-03 930301 S
65.98 B
5 N/A HC HTEXCH The B water box was taken out of service for retubing.
93-04 930303 S
7.97 8
5 N/A ZZ 777777 Decreased reactor power in preparation of midcycle outage.
P3-05 930304 S
678 B
1 N/A ZZ 777777 Start of midcycle outage.
t a
3 4
6 F: FORCED FIEASOft METHOD EXHIGET O - M87RUCTtDNS EXHerT I. SAME SOURCE 9: SCHEDULED A-EOUIPMENT FAILURE 1-MANUAL FCR PREPARAflON OF DATA S-MAMTENANCE OR TEST t-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE CJETUELMG 3-AUTO SCFMM EVENT REPORT (LErg FILE '
D-REGULATORY RESTRICTION 4-CONTINUED (NUREG-0161)
E-OPERATORTRANNG &
6-REDUCED LOAD LICENSE ADMtNISTRATION S-0THER F-ADMINISTRATION 0-OFTRATIONAL Erm06 (EXW H-OTHER
L MONTHLY OPERATIONAL
SUMMARY
STATEMENT l
i DOCKET NO.
50-302 I
UNIT FLCRP-3 DATE-
_ APRIL 2,1993 t
Rale 1 h Smith COMPLETED BY 9
TELEPHONE (904)795-6486 h
l MONTH: MARCH i
i
SUMMARY
STATEMENT:
Crystal River Unit 3 came off line on March 4 at 0200 to begin the midcycle outage.
j i
e 3