3F0188-09, Monthly Operating Rept for Dec 1987

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1987
ML20147C094
Person / Time
Site: Crystal River 
Issue date: 12/31/1987
From: Eric Simpson, Stewart S
FLORIDA POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
3F0188-09, 3F188-9, NUDOCS 8801190075
Download: ML20147C094 (5)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

  • . **o OPERATING DATA REPORT v

DOCKET NO.

50-302 DATE 1/4/88 COMPLETED BY S. Stewart TELEPHONE (904)-795 3802-OPERATING STATUS N

Crystal River Unit 3 items #24 and #25 have

1. Unit Name:

12/1/87 - 12/31/87

2. Reporting Period:

changed from November.

2544 Estimated date of startup is

3. Licensed Thermal Power (MWt):

890

4. Nameplate Rating (Gross MWe):

1/g/gg, 825

5. Design Electrical Rating (Net MWe):

860

6. Maximum Dependable Capacity (Gross MWe):

821

7. Matimum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:

N/A i

N/A

9. Power Level To Which Restricted.lf Any(Net MWe):

N/A

10. Reasons For Restrictions. If Any:

This Month Yr..to.Dete Cumulative

(

744 8760 94704

11. Hours in Reporting Period 0

5333J1 59326.0

12. Number Of Hours Reactor Was Critical
13. Reactor Resene Shutdown Hours 0

0 1280.6 0

5263.8 38015,9

14. Hours Generator On-Line 0

0 0

15. Unit Resene Shutdown Hours 0

11143M1 129747188

16. Gross Thermal Energy Generated (MWH)

U 3819322 44374533

17. Gross Electrical Energy Generated (MWH) 0 3620784 4213358?
18. Net Electrical Energy Generated (MWH) 0%

60.1 %

61.3 %

19. Unit Service Factor 0%

C 0.1 %

61.3 %

20. Unit Availability Factor 0%

50.3 %

55.5 %

21. Unit Capacity Factor (Using MDC Net) 0%

50.1%

53.9 %

22. Unit Capacity Factor (Using DER Net) 0%

10.4 %

23.0 %

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Eacht:

Refueling outage Vi beRan 9/18/87 and is now expected to last 16 wecin.

I/9/88

25. If Shut Down At End Of Report Period,Esimated Date of Startup:
26. Units in Test Status tPrior to Commercial Operation U forecast A:hiesed 1/14/77 INITIAL CRITICALITY 1/30/77 INITI A L F! ICTRICITY COMMERCI AL OPER All0N 3/13/77 N/77 )

'8801190075 871231 PDR ADOCK 05000302

'(b R

DCD y

gj

AVERAGE DAILY UNIT POWER LEVEL l

\\

DOCKET NO.

50-302 UNIT F LC R P-3 DATE 1/4/88 i

COMPLETED BY S. Stewart TELEPHONE (904) 795-3802 d

i

'l MONTH 12/87 r

DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) gyw,. Net) 1 0

0 g7 2

0 0

18 3

0 39 0

4 0

0 I

20 0

0 5

gg 6

0 0

22 7

0 23 0

g 0

0 24 0

25 0

j 10 0

26 0

a 1I O

0 27 0

0 12 28 0

I3 29 i

14 0

0 30

]

15 0

0 3;

16 E

)

INSTRUCTIONS

[

1 On this format.hst the average dady unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole megamatt, h

8 (9/771 f

1 l

t ll

~

w

.p b

d UNITSHUTDOWNS AMDPOWER REDUCDONS NEN-UNIT NAME F LC H P-3 DATE 1/4/88 COMPLETED BY S stewnrt REPORT MONTH 12/87 TELEPHONE (4n3) 79s-7 Rn?

c 3E 3

y f4 Licensee E-e,

'g'%

Cause & Corrective Na.

Dane

{

?

4 1QE Event gi QO f}

Attwn to e

E jgg Report

  • en U Present Recurrence H

g 6

87-19 870918 S

744.0 C

4 N/A ZZ ZZ7ZZZ Hefueling Outage Continues 4

1 2

3 4

i F: Forced Reason:

Mathd Exhibit G. Instructiewis i

S: Scheduled A-Equipment Failure (Explain) for Preparation of Data

,,3 B-Maintenance of Test 2-M 1 Scra.

Entry Sheets for tiensee C-Refueling 3-Auto sera.

Event Repos (LER) Fsic(NURIG-D-Regulatory Restriction 4-Continued 6161i Eoperator Training a Ucense Emanunatios, 5-Reduced Load l

F-Adnunistrative 9-OtMr 3

)

G Operational Error (Explaan)

Eshebit I - Same Source i

19/77) llother dEmplain) m, e

w

  • e.

ww

. _.. _ _ _ _. ~.

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT _JLC R P-3 DATE 1/4/88 COMPLETED BY S. Stewart TELEPHONE (904) 795-3802 MONTH 12/A7

SUMMARY

STATEMENT:

Crystal River Unit #3 remained off-line for refueling and maintenance.

f I

l l

\\

I e

f 1

see, 99 %

n NC e

OCG OOe b*.".',e Florida Power C0RPORATtON January 8, 198 3F0183-09 Document Control Desk U.S.

Nuclear Regulatory Commission Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report Oear Sir:

Attached is the Crystal River Unit 3 December 1987 Monthly Operating Report.

This report is submitted in accordance with Technical Specification G.9.1.6.

Sincerely, E.C.

Simpson, Director Nuclear Operations Site Support DVH/dhd xc:

Dr.

J.

Nelson Grace Hegional Administrator, Region II Mr.

T.F.

Stetka Senior Resident Inspector 4

i Post Of fice Box 219

  • Telephone (904) 795 3802 A Florida Progress Corrpany