3F0188-09, Monthly Operating Rept for Dec 1987
| ML20147C094 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/31/1987 |
| From: | Eric Simpson, Stewart S FLORIDA POWER CORP. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| 3F0188-09, 3F188-9, NUDOCS 8801190075 | |
| Download: ML20147C094 (5) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -
- . **o OPERATING DATA REPORT v
DOCKET NO.
50-302 DATE 1/4/88 COMPLETED BY S. Stewart TELEPHONE (904)-795 3802-OPERATING STATUS N
Crystal River Unit 3 items #24 and #25 have
- 1. Unit Name:
12/1/87 - 12/31/87
- 2. Reporting Period:
changed from November.
2544 Estimated date of startup is
- 3. Licensed Thermal Power (MWt):
890
- 4. Nameplate Rating (Gross MWe):
1/g/gg, 825
- 5. Design Electrical Rating (Net MWe):
860
- 6. Maximum Dependable Capacity (Gross MWe):
821
- 7. Matimum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:
N/A i
N/A
- 9. Power Level To Which Restricted.lf Any(Net MWe):
N/A
- 10. Reasons For Restrictions. If Any:
This Month Yr..to.Dete Cumulative
(
744 8760 94704
- 11. Hours in Reporting Period 0
5333J1 59326.0
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Resene Shutdown Hours 0
0 1280.6 0
5263.8 38015,9
- 14. Hours Generator On-Line 0
0 0
- 15. Unit Resene Shutdown Hours 0
11143M1 129747188
- 16. Gross Thermal Energy Generated (MWH)
U 3819322 44374533
- 17. Gross Electrical Energy Generated (MWH) 0 3620784 4213358?
- 18. Net Electrical Energy Generated (MWH) 0%
60.1 %
61.3 %
- 19. Unit Service Factor 0%
C 0.1 %
61.3 %
- 20. Unit Availability Factor 0%
50.3 %
55.5 %
- 21. Unit Capacity Factor (Using MDC Net) 0%
50.1%
53.9 %
- 22. Unit Capacity Factor (Using DER Net) 0%
10.4 %
23.0 %
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Eacht:
Refueling outage Vi beRan 9/18/87 and is now expected to last 16 wecin.
I/9/88
- 25. If Shut Down At End Of Report Period,Esimated Date of Startup:
- 26. Units in Test Status tPrior to Commercial Operation U forecast A:hiesed 1/14/77 INITIAL CRITICALITY 1/30/77 INITI A L F! ICTRICITY COMMERCI AL OPER All0N 3/13/77 N/77 )
'8801190075 871231 PDR ADOCK 05000302
'(b R
DCD y
gj
AVERAGE DAILY UNIT POWER LEVEL l
\\
DOCKET NO.
50-302 UNIT F LC R P-3 DATE 1/4/88 i
COMPLETED BY S. Stewart TELEPHONE (904) 795-3802 d
i
'l MONTH 12/87 r
DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) gyw,. Net) 1 0
0 g7 2
0 0
18 3
0 39 0
4 0
0 I
20 0
0 5
gg 6
0 0
22 7
0 23 0
g 0
0 24 0
25 0
j 10 0
26 0
a 1I O
0 27 0
0 12 28 0
I3 29 i
14 0
0 30
]
15 0
0 3;
16 E
)
INSTRUCTIONS
[
1 On this format.hst the average dady unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole megamatt, h
8 (9/771 f
1 l
t ll
~
w
.p b
d UNITSHUTDOWNS AMDPOWER REDUCDONS NEN-UNIT NAME F LC H P-3 DATE 1/4/88 COMPLETED BY S stewnrt REPORT MONTH 12/87 TELEPHONE (4n3) 79s-7 Rn?
c 3E 3
y f4 Licensee E-e,
'g'%
Cause & Corrective Na.
Dane
{
?
4 1QE Event gi QO f}
Attwn to e
E jgg Report
- en U Present Recurrence H
g 6
87-19 870918 S
744.0 C
4 N/A ZZ ZZ7ZZZ Hefueling Outage Continues 4
1 2
3 4
i F: Forced Reason:
Mathd Exhibit G. Instructiewis i
S: Scheduled A-Equipment Failure (Explain) for Preparation of Data
,,3 B-Maintenance of Test 2-M 1 Scra.
Entry Sheets for tiensee C-Refueling 3-Auto sera.
Event Repos (LER) Fsic(NURIG-D-Regulatory Restriction 4-Continued 6161i Eoperator Training a Ucense Emanunatios, 5-Reduced Load l
F-Adnunistrative 9-OtMr 3
)
G Operational Error (Explaan)
Eshebit I - Same Source i
19/77) llother dEmplain) m, e
w
- e.
ww
. _.. _ _ _ _. ~.
MONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO. 50-302 UNIT _JLC R P-3 DATE 1/4/88 COMPLETED BY S. Stewart TELEPHONE (904) 795-3802 MONTH 12/A7
SUMMARY
STATEMENT:
Crystal River Unit #3 remained off-line for refueling and maintenance.
f I
l l
\\
I e
f 1
- see, 99 %
n NC e
OCG OOe b*.".',e Florida Power C0RPORATtON January 8, 198 3F0183-09 Document Control Desk U.S.
Nuclear Regulatory Commission Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report Oear Sir:
Attached is the Crystal River Unit 3 December 1987 Monthly Operating Report.
This report is submitted in accordance with Technical Specification G.9.1.6.
Sincerely, E.C.
Simpson, Director Nuclear Operations Site Support DVH/dhd xc:
Dr.
J.
Nelson Grace Hegional Administrator, Region II Mr.
T.F.
Stetka Senior Resident Inspector 4
i Post Of fice Box 219
- Crystal River, Florida 32629
- Telephone (904) 795 3802 A Florida Progress Corrpany