| Q | CCA | Title |
---|
05000483/FIN-2011404-02 | 2011Q3 | H.10 | Security |
05000483/FIN-2011004-01 | 2011Q3 | H.5 | Failure to Correctly Implement Plant Maintenance Procedures |
05000483/FIN-2011004-02 | 2011Q3 | P.1 | Failure to Evaluate Breaker Relay Settings Results in Partial Loss of Station Blackout Response Capability |
05000483/FIN-2011402-02 | 2011Q3 | H.2 | Security |
05000483/FIN-2011402-01 | 2011Q3 | H.5 | Security |
05000483/FIN-2011404-01 | 2011Q3 | | Security |
05000483/FIN-2011005-06 | 2011Q4 | H.11 H.12 | Failure to Isolate Control Room Air Conditioning Unit SGK04A for Maintenance |
05000483/FIN-2011005-07 | 2011Q4 | H.4 H.5 | Failure to Correctly Implement Plant Maintenance Procedures |
05000483/FIN-2011005-05 | 2011Q4 | H.9 H.2(b) | Improper Ground and Test Device Damages Residual Heat Removal Pump Switchgear |
05000483/FIN-2011005-04 | 2011Q4 | H.7 | Failure to Adequately Assess and Manage Outage Risk Associated with Significant Switchyard Work |
05000483/FIN-2011005-03 | 2011Q4 | | Failure to Maintain Simulator Testing in Accordance with ANSI/ANS 3.5-1998 |
05000483/FIN-2011005-02 | 2011Q4 | | Failure to Maintain Simulator Fidelity |
05000483/FIN-2011005-01 | 2011Q4 | P.2 | Failure to ensure Separation of Stainless Steel and Carbon Steel Hand Files and Wire Brushes |
05000483/FIN-2012002-01 | 2012Q1 | | Failure to Properly Evaluate the Design of Steam Generator Drain Plugs |
05000483/FIN-2012003-01 | 2012Q2 | | Failure to Incorporate Operating Experience for a 10 CFR 50.65(a)(3) Assessment |
05000483/FIN-2012003-02 | 2012Q2 | P.5 | Failure to Declare Component Cooling Water Train A Inoperable Due to Voids |
05000483/FIN-2012007-01 | 2012Q2 | | Failure to Establish Preventive Maintenance for Equipment Used to Achieve Post-Fire Safe Shutdown |
05000483/FIN-2012403-01 | 2012Q2 | | Security |
05000483/FIN-2012007-02 | 2012Q2 | | No written procedures provided |