| Q | CCA | Title |
---|
05000482/FIN-2017008-02 | 2017Q4 | H.9 | Failure to Provide Adequate Emergency Lighting |
05000482/FIN-2017008-01 | 2017Q4 | | InadequateEvaluation of Spurious Valve Operation |
05000482/FIN-2018001-01 | 2018Q1 | | Inadequate Functionality Assessment Associated with the Emergency Excess Letdown Flowpath |
05000482/FIN-2018007-02 | 2018Q2 | | Minor Violation |
05000482/FIN-2018007-01 | 2018Q2 | P.2 | Failure to Provide Adequate Work Instructions for Preventive Maintenance on Safety-Related Equipment |
05000482/FIN-2018002-03 | 2018Q2 | H.2 | Failure to Adequately Implement Instrumentation and Controls Surveillance Procedures |
05000482/FIN-2018002-02 | 2018Q2 | H.3 | Failure to Maintain Adequate Pressurization of the Control Room Envelope |
05000482/FIN-2018002-01 | 2018Q2 | | Announcement of an NRC Inspectors Presence by Station Personnel |
05000482/FIN-2018003-01 | 2018Q3 | H.14 | Failure to Correct Degraded Performance of a Safety-Related Tornado Damper |
05000482/FIN-2018003-02 | 2018Q3 | | Failure to Submit a Licensee Event Report for a Condition Prohibited by Technical Specifications |
05000482/FIN-2018010-01 | 2018Q3 | | Failure to Follow Procedures |
05000482/FIN-2018010-02 | 2018Q3 | | Failure to Establish an Adequate Procedure for Operator Time Critical Actions Validation |
05000482/FIN-2018010-03 | 2018Q3 | P.4 | Failure to Correct Reoccurring Problems with Time Critical/Sensitive Action Activities |
05000482/FIN-2018010-04 | 2018Q3 | H.13 | Failure to Identify 125 VDC Equalizing Voltage Exceeded Design Requirements |
05000482/FIN-2018201-01 | 2018Q3 | | Security |
05000482/FIN-2018201-02 | 2018Q3 | | Security |
05000482/FIN-2018201-03 | 2018Q3 | | Security |
05000482/FIN-2018201-04 | 2018Q3 | | Security |