Notice of Violation from Insp on 850816-0915
ML20133L765
Person / Time
Site: River Bend, 05000816 Entergy icon.png
Issue date: 10/18/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20133L760 List:
References
50-458-85-62, NUDOCS 8510240298
Download: ML20133L765 (2)


Text

- _ _

. -.

- _.

.-

-

-

.

. -.

_. -

.

.

. -

-

i

-

.

i I

i

i j

APPENDIX A i

NOTICE OF VIOLATION

!

'

Gulf States Utilities Docket: 50-458/85-62

_ River Bend Station License: NPF-40 p

1-

!

'During an NRC' inspection conducted during the period of August 16 through

September 15, 1985, a violation of NRC requirements was identified. The

!

violation involved the' failure to follow an administrative procedure for j

control and use of. procedures.

In accordance with the " General Statement of j

Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violation is listed below-A.

Failure to Follow an Administrative Procedure

.

10 CFR Part 50, Appendix B, Criterion V, and the licensee's approved l

quality assurance program, require that activities affecting the quality of safety-related systems and components be conducted in accordance with

,

j approved instructions, procedures, and drawings.

Administrative Procedure ADM-003, " Development, Control and Use of j

Procedures," Revision 6, requires the following:

i In the event a procedure cannot be followed exactly, the task or

.

i evolution shall not be conducted unless required by an emergency or casualty situation, until the procedure has been revised.

j The initiator of a Temporary Change Notice (TCN) shall specify the i

.

reason for the change on the TCN form.

The initiator shall retain a copy of the TCN for the continuation of

.

the work activity.

.

!

j Contrary to the above, ADM-003 procedure requirements were not fully

j implemented for surveillance test procedures STP-503-4203 (completed l

j 8/02/85, STP-503-4204 (completed 8/03/85), STP-503-4205 (completed

}

8/06/85, and STP-503-4206 (completed 8/02/85) for the semiannual l

,

calibration of source range monitor channels A, B, C, and 0 in that the i

j STPs were not followed exactly. TCNs 85-1405 and 85-1406 were issued and

'

approved without the reason for the change being specified on the TCN form f

and TCNs 85-1436, 1214, 1440, 1453, and 1454 were not fully implemented

j for the continuation of the work activity. Nur,1erous examples

!

of the failure to follow STP procedures exactly and the failure to fully

'

implement TCNs were documented.

[

i This is a Severity Level IV violation (Supplement I.D.)(458/8562-01).

,

I i

8510240298 851018

,

PDR ADOCK 05000450 l

1 G

PDR t

>

l l

4 i

.

.

.

.

.

-2-Pursuant to the provisions of 10 CFR' 2.201, Gulf States Utilities is hereby required to submit to the Office within 30 days of the date of the' letter

-

transmitting -this ' Notice, a written statement or explanation in reply, including for each violation:

(1) the reason for.the violations if admitted, (2) the corrective steps which have been taken and the results achieved,-(3)

-

the' corrective steps which will be taken to avoid further violations, and (4)

the_date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

r'

_

Dated at l Arlington, Te' xas

'

this 18th day of October,1985.

.