| Q | CCA | Title |
---|
05000456/FIN-2008008-01 | 2008Q3 | | RAI to Determine Adequacy of Pipe Supports Designed for Design Basis Loading Conditions with Lead Shielding Installed on SI and Rh Subsystems |
05000456/FIN-2008004-01 | 2008Q3 | H.14 | Failure to comply with the Spacing Standard for Sprinkler systems in Accordance with the Licensee Fire Protection Program Requirements |
05000456/FIN-2008004-04 | 2008Q3 | | Bryozoan Infestation at the lake screenhouse circulating water forebays |
05000456/FIN-2008004-03 | 2008Q3 | | Inadvertent Isolation of Lower Cable Spreading Room Carbon Dioxide Fire Suppression |
05000456/FIN-2008004-02 | 2008Q3 | H.14 | Failure to Properly Evaluate Removal of Carbon Dioxide Fire Suppression for the Upper Cable spreading Room Carbon Dioxide Fire Suppression |
05000456/FIN-2008009-01 | 2008Q4 | | Failure to Take Timely Corrective Action for a Previously Identified NRC Violation |
05000456/FIN-2008005-05 | 2008Q4 | | Failure to Analyze Inlet Piping Loads and Establish an Adequate HUT Quench Volume. |
05000456/FIN-2008005-03 | 2008Q4 | P.2 | Inadequate Corrective Action for Failure to Promptly Correct Auxiliary Tunnel Feedwater Tunnel Hatch Cover Design Deficiencies. |
05000456/FIN-2008005-01 | 2008Q4 | | Inadequate Control of High Pressure Gas Cylinders |
05000456/FIN-2008005-04 | 2008Q4 | H.11 H.12 | Inadequate Corrective Action for Containment Spray Add Tank Drain Valve. |
05000456/FIN-2008005-02 | 2008Q4 | | Evaluation of the licensee process and controls regarding the management of on-line risk. |
05000456/FIN-2009006-03 | 2009Q1 | | Failure to Perform Validation for Safe Shutdown Manual Actions |
05000456/FIN-2009006-01 | 2009Q1 | | Failure to Take Effective Corrective Actions to Maintain Capability of Foam Suppression Systems |
05000456/FIN-2009006-02 | 2009Q1 | | Diesel Oil Storage Tank Room Sprinkler Obstructions |
05000456/FIN-2009002-02 | 2009Q1 | | Reactor Trip On Unit Auxiliary Transformer 241-1 Sudden Pressure Relay Actuation Due To 2C Heater Drain Pump Motor Electrical Fault |
05000456/FIN-2009002-01 | 2009Q1 | H.2(a) H.6 | Safety Injection Pipe Support Deficiencies |
05000456/FIN-2009003-02 | 2009Q2 | H.7 | Isolation of Lower Cable Spreading Room Carbon Dioxide Fire Suppression |
05000456/FIN-2009003-06 | 2009Q2 | H.14 | Failure to Promptly Identify Bryozoa Infestation Caused 2A SX subsystem to be inoperable |
05000456/FIN-2009003-05 | 2009Q2 | P.2 | Failure to Properly Evaluate Installation of ECCS Throttle Valves |
05000456/FIN-2009003-04 | 2009Q2 | | Failure of Containment Sump Suction Valve 1SI8811B to Stroke Open |
05000456/FIN-2009003-07 | 2009Q2 | H.14 | Bryozoan Infestation at the lake Screenhouse Circulating Water forebays |
05000456/FIN-2009003-01 | 2009Q2 | H.2 | Failure to Control and Secure Material Adjacent to Unit 1 Transformer Yard Which Could Become Potential Missiles |
05000456/FIN-2009003-03 | 2009Q2 | | Failure to Perform Appropriate 10 CFR 50.59 Review |