| | Q | CCA | Title |
|---|
| 05000454/FIN-2009007-02 | 2009Q1 | H.14 | Inadequate Analysis of Molded-Case Circuit Breaker Test Data |
| 05000454/FIN-2009007-01 | 2009Q1 | P.5 | Failure to Maintain/Extend the Qualification Basis for Molded-Case Circuit Breakers (MCCBs) Used In Safety-Related Applications Greater than 20 Years. |
| 05000454/FIN-2009002-02 | 2009Q1 | | Failure to Adhere to Scaffold Procedures |
| 05000454/FIN-2009002-01 | 2009Q1 | H.7 | Failure to Perform an Adequate Risk Assessment that Accounted for All Risk Significant Structures, Systems and components that were Unavailable Prior to Maintenance Activities. |
| 05000454/FIN-2009007-04 | 2009Q1 | | Insufficient Design Bases for Second-Level (Degraded) Voltage Timer Settings |
| 05000454/FIN-2009007-03 | 2009Q1 | | Concerns with Licensee\\\'s Margin to Overfill (MTO) Analysis Related to Steam Generator Tube Rupture (SGTR) Event. |
| 05000454/FIN-2009003-01 | 2009Q2 | H.14 | Failure to Comply with TS 3.4.13.B Reactor Coolant Pressure Boundary Leakage |
| 05000454/FIN-2009003-02 | 2009Q2 | | Diesel Oil Storage Tank Vent Regulatory Compliance Backfit May be Required |
| 05000454/FIN-2009004-01 | 2009Q3 | | Assigning appropriate 10 CFR 61 waste stream to radioactive waste shipments |
| 05000454/FIN-2009004-03 | 2009Q3 | H.2 | Inadequate Evaluation of Seismic Restraint on the FHB Crane Trolley |
| 05000454/FIN-2009008-02 | 2009Q3 | H.2(a) H.6 | Untimely Corrective Actions for Sprinkler Obstructions |
| 05000454/FIN-2009008-01 | 2009Q3 | | Potential Failure of all the Emergency Diesel Generators (EDG) for Both Units 1 and 2 during a Loss of Offsite Power Event |
| 05000454/FIN-2009004-04 | 2009Q3 | | Use of Friction in Design of FHB Crane to Single Failure Proof |
| 05000454/FIN-2009004-05 | 2009Q3 | | Unresolved Technical Concerns on Design of Seismic Restraint on FHB Crane Trolley |
| 05000454/FIN-2009004-02 | 2009Q3 | | Diesel Oil Storage Vents Not Seismically Qualified or Tornado Resistant |
| 05000454/FIN-2009005-03 | 2009Q4 | H.9 H.2(b) | Failure to comply with 10 CFR Part 20 Appendix G. |
| 05000454/FIN-2009005-01 | 2009Q4 | H.9 H.2(b) | Failure to comply with 10 CFR Part 26.203(b)(2) |
| 05000454/FIN-2009403-01 | 2009Q4 | H.14 | Security |
| 05000454/FIN-2009005-02 | 2009Q4 | | Changes to EAL HU6 Potentially Decreased the Effectiveness of the Plans without Prior NRC Approval |