05000445/FIN-2011003-08
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Develop Adequate Guidance for Extreme Damage Mitigation Procedures |
Description | The inspectors identified a noncited violation of 10 CFR 50.54(hh)(2) for the licensees failure to develop adequate guidance to restore core and spent fuel cooling capabilities for a postulated loss of large areas of the plant. Specifically, the licensee failed to ensure suction hose size derived from an engineering report was translated into procedures, failed to provide adequate procedure guidance for use of a fire truck to draw water from the reservoir, and failed to stage hoses in the location specified by procedure. The licensee entered the finding into the corrective action program as Condition Report CR-2011-005830. The licensees failure to develop adequate guidance to restore core and spent fuel cooling capabilities for a postulated loss of large areas of the plant was a performance deficiency. The finding was more than minor because it was associated with the procedure quality attribute of the barrier integrity cornerstone and adversely affected the cornerstone objective to provide reasonable assurance that physical design barriers (fuel cladding and containment) protect the public from radionuclide releases caused by accidents or events. Using NRC Manual Chapter 0609, Appendix L, B.5.b Significance Determination Process, the finding was determined to be of very low safety significance because the finding did not affect both the recoverability and availability of an individual mitigating strategy. The finding has a human performance crosscutting aspect associated with resources, in that, the licensee failed to ensure adequate facilities, equipment, and trained personnel were available to ensure nuclear safety is maintained. |
Site: | Comanche Peak |
---|---|
Report | IR 05000445/2011003 Section 4OA5 |
Date counted | Jun 30, 2011 (2011Q2) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | |
Inspectors (proximate) | B Tindell J Kramer W Walkerb Tindelld Proulx G Tutak J Kramer R Kopriva W Walker |
CCA | H.1, Resources |
INPO aspect | LA.1 |
' | |
Finding - Comanche Peak - IR 05000445/2011003 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Comanche Peak) @ 2011Q2
Self-Identified List (Comanche Peak)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||