05000443/FIN-2012503-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | |
Description | The NRC identified an apparent violation (AV) for the licensee exercise critique process not properly identifying a weakness associated with a risk significant planning standard (RSPS) that was determined to be a Drill/Exercise Performance (DEP) Performance Indicator (Pl) opportunity failure during a full-scale exercise. The AV is associated with emergency preparedness planning standards 10 CFR 50.47(bX14) and 10 CFR 50.47(bX5) and the requirements of Section lV.F.2.g of Appendix E to 10 CFR Part 50. This finding was entered into the licensee corrective action program. The failure of NextEra to identify the exercise weakness related to an incorrect protective action recommendation (PAR) notification during their exercise critique was a performance deficiency that was reasonably within NextEra ability to foresee and prevent. The finding is more than minor because it is associated with the emergency response organization attribute of the Emergency Preparedness Cornerstone and affected the cornerstone objective to ensure that the licensee is capable of implementing adequate measures to protect the health and safety of the public in the event of a radiological emergency. This finding was determined to potentially have greater-than- Green safety significance because the licensee exercise critique process did not properly identify a weakness associated with a RSPS that was determined to be a DEP Pl opportunity failure during a biennial full-participation exercise. The finding is related to the cross-cutting area of Problem identification and Resolution, Corrective Action Program; in those NextEra personnel did not identify a RSPS issue completely, accurately, and in a timely manner commensurate with the safety significance. Specifically, during the biennial full-participation exercise evaluation Next Era failed to identify a weakness. |
Site: | Seabrook |
---|---|
Report | IR 05000443/2012503 Section 1EP1 |
Date counted | Jun 30, 2012 (2012Q2) |
Type: | Violation: White |
cornerstone | Emergency Prep |
Identified by: | NRC identified |
Inspection Procedure: | IP 71114.01 |
Inspectors (proximate) | C Crisden J Trapp R Montgomery R Rolph S Barr W Raymonda Dimitriadise Burket S Barrw Deana Burritt C Miller D Holody D Roberts J Bowen J Trapp K Farrar R Kahler |
CCA | P.1, Identification |
INPO aspect | PI.1 |
' | |
Finding - Seabrook - IR 05000443/2012503 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Seabrook) @ 2012Q2
Self-Identified List (Seabrook)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||