| | Q | CCA | Title |
|---|
| 05000424/FIN-2010007-01 | 2010Q3 | P.2 | Violation of 10 CFR 50.71(e)(4) for Failure to Reflect Changes to Facility and Procedures in Final Safety Analysis Report Periodic Revisions |
| 05000424/FIN-2010004-01 | 2010Q3 | H.4 H.5 | Failure to Correct Instrument Uncertainty Associated with the ECCS Accumulators |
| 05000424/FIN-2010006-01 | 2010Q3 | | Control Room Fire Alternate Shutdown Evaluation (X4C2301S035) Does Not Reflect Integrated Plant Response |
| 05000425/FIN-2010006-02 | 2010Q3 | | Licensing Basis for Multiple Spurious Operations and Adequacy of Related Compensatory Measures |
| 05000424/FIN-2010005-01 | 2010Q4 | P.1 | Failure to Utilize the Corrective Action Program to Identify a Condition Adverse to Quality |
| 05000424/FIN-2010005-02 | 2010Q4 | | Depressurization of Main Firewater Header |
| 05000424/FIN-2011002-01 | 2011Q1 | P.5 P.2(b) | Failure to Perform General Visual Examination of Containment Metallic Liner in Reactor Vessel Cavity underneath the Reactor Vessel |
| 05000424/FIN-2011002-02 | 2011Q1 | H.13 | Depressurization of Main Firewater Header |
| 05000424/FIN-2011003-01 | 2011Q2 | H.7 | Failure to Establish and Implement Adequate Post Maintenance Testing for 1HV-0943B |
| 05000424/FIN-2011403-01 | 2011Q2 | H.7 | Security |