| Q | CCA | Title |
---|
05000424/FIN-2009005-01 | 2009Q4 | | Operation of NSCW System with Tower Return Valves in Open Bypass |
05000424/FIN-2009005-02 | 2009Q4 | | Inadequate Surveillance Procedures for TS SR 3.7.8.2 |
05000424/FIN-2009005-03 | 2009Q4 | H.2 | Human Performance Error Results in Manual Reactor Trip Section |
05000424/FIN-2009005-04 | 2009Q4 | | Failure to properly maintain the approved fire protection program with regard to the relocation of the plant fire alarm annunciation signal outside of the MCRs |
05000425/FIN-2010002-01 | 2010Q1 | P.2 | Ineffective Corrective Action Renders Unit 2 CCW Pump #4 Inoperable |
05000424/FIN-2010003-01 | 2010Q2 | | Failure to Inspect Tube R1C2 of Steam Generator 2 during the Steam Generator Eddy Current Examination in 2007 |
05000424/FIN-2010003-02 | 2010Q2 | | Failure to Verify Purchased Equipment Conformed to Design Specifications |
05000424/FIN-2010007-01 | 2010Q3 | P.2 | Violation of 10 CFR 50.71(e)(4) for Failure to Reflect Changes to Facility and Procedures in Final Safety Analysis Report Periodic Revisions |
05000424/FIN-2010004-01 | 2010Q3 | H.4 H.5 | Failure to Correct Instrument Uncertainty Associated with the ECCS Accumulators |
05000424/FIN-2010006-01 | 2010Q3 | | Control Room Fire Alternate Shutdown Evaluation (X4C2301S035) Does Not Reflect Integrated Plant Response |
05000425/FIN-2010006-02 | 2010Q3 | | Licensing Basis for Multiple Spurious Operations and Adequacy of Related Compensatory Measures |