05000339/FIN-2017001-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Inadequate Design Control of 2 -RC- P-1C Piping Supports |
Description | Green . A self -revealing Green NCV of 10 CFR 50, Appendix B, Criterion III, Design Control, was identified for the failure to correctly translate applicable regulatory requirements and the design basis into specifications, drawings, procedures, and instructions . Specifically, the licensee failed to include the pipe support (2 -FPH -CH- 416- 11) in the scope of design change (DC) NA -13- 01059, Unit 2 Reactor Coolant Pump Seal Replacement, which resulted in a large mean stress on the socket weld due to the 1.5- inch controlled bleed- off line piping not being properly aligned in the downstream pipe support, and therefore not allowing for the thermal growth of the reactor coolant system (RCS). As a result of the large mean stress, a crack initiated at a small defect (lack of fusion) in the toe of the socket weld and propagated through the weld due to normal cyclic vibration from the Unit 2 C reactor coolant pump (RCP). This finding was entered into the licensee's corrective action program as Condition Report (CR) 1043540. The finding was more than minor because it was associated with the design control attribute of the Initiating Events and Barrier Integrity cornerstones and adversely affected the cornerstone objective to provide reasonable assurance that physical design barriers protect the public from radio- nuclide releases caused by accidents or events. Specifically, the inadequate design control of the piping support following Unit 2 RCP Seal Replacement resulted in an un-isolable through wall leak in the controlled bleed- off line piping and was identified as RCS pressure boundary leakage. The inspectors evaluated the finding in accordance with Manual Chapter 0609.04, Initial Characterization of Findings, Table 2, dated October 7, 2016, and the inspectors screened the finding using Inspection Manual Chapter (IMC) 0609, Appendix A, Significance Determination Process (SDP) for Findings at -Power, dated June 19, 2012. The finding screened out in the review of the Barrier Integrity cornerstone as the performance deficiency ( PD ) was not related to pressurized thermal shock ; therefore , the finding will be addressed under the Initiating Events cornerstone. Since the issue affected multiple cornerstones and because the licensee classified the leakage as RCS pressure boundary leakage, the NRC performed a detailed risk evaluation for the PD. The detailed risk evaluation was performed by a regional SRA in accordance with the NRC IMC 0609 Appendix A utilizing the NRC North Anna SPAR model. The PD was modeled as an increase in the small loss of coolant accident frequency given a failure of the RCP seal. The dominant sequence was a rupture in the controlled bleed off line leading to a small loss of coolant accident due to RCP seal failure with failure of 3 containment sump recirculation leading to loss of core heat removal and core damage. The risk was mitigated by the RCP seal failure probability and the remaining mitigation. The detailed risk evaluation estimated that the PD resulted in an increase in core damage frequency of < 1.0 E -6/year, a GREEN finding of very low safety significance. The finding had a cross -cutting aspect in the area of human performance, work management H.5, because the licensee failed to include the pipe support (2-FPH -CH- 416 -11) in the scope of the design change by engineering information bulletin (EIB) # N10 -002 requirements |
Site: | North Anna |
---|---|
Report | IR 05000339/2017001 Section 4OA3 |
Date counted | Mar 31, 2017 (2017Q1) |
Type: | NCV: Green |
cornerstone | Initiating Events |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71153 |
Inspectors (proximate) | A Masters D Merzke G Croon J Munday S Cuadrado-Dejesus |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion III, Design Control |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |
Finding - North Anna - IR 05000339/2017001 | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (North Anna) @ 2017Q1
| |||||||||||||