| Q | CCA | Title |
---|
05000333/FIN-2015004-01 | 2015Q4 | H.5 | Unintended Elevated Plant Risk During EDG Maintenance |
05000333/FIN-2015004-02 | 2015Q4 | | Untimely 10 CFR 50.72 Notification of Inoperable Secondary Containment |
05000333/FIN-2016001-01 | 2016Q1 | H.8 | Unintended HPCI Pump Suction Transfer during Pressure Control Mode Operation |
05000333/FIN-2016001-02 | 2016Q1 | H.11 | Uncontrolled RPV Level Increase after Initiation of RHR Shutdown Cooling |
05000333/FIN-2016001-03 | 2016Q1 | H.1 | Inadequate Post-Maintenance Testing of the Reactor Building Ventilation System Resulted in Short-Term Inoperability of Secondary Containment |
05000333/FIN-2016001-04 | 2016Q1 | | Untimely 10 CFR 50.72 Notification of Inoperable Secondary Containment |
05000333/FIN-2016007-01 | 2016Q2 | | Failure to ensure design basis of EDG LO storage facility |
05000333/FIN-2016007-02 | 2016Q2 | P.2 | Failure to adequately evaluate a procedure change impacting a PRA-credited time critical operator action |
05000333/FIN-2016002-01 | 2016Q2 | H.4 | Failure to Determine Dose Rates Prior to Entering a High Radiation Area |
05000333/FIN-2016002-02 | 2016Q2 | P.3 | Failure to Conduct Operations to Minimize the Introduction of Residual Radioactivity to the Site |
05000333/FIN-2016403-01 | 2016Q3 | H.8 | Security |
05000333/FIN-2016003-01 | 2016Q3 | | Inadequate Preventive Maintenance Results In Transformer Failure and Reactor Scram |