05000327/LER-1982-112, Forwards LER 82-112/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-112/03L-0
ML20065N110
Person / Time
Site: Sequoyah 
Issue date: 10/08/1982
From: Green H
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20065N112 List:
References
NUDOCS 8210220081
Download: ML20065N110 (1)


LER-1982-112, Forwards LER 82-112/03L-0
Event date:
Report date:
3271982112R00 - NRC Website

text

r

  • .?

~'

TENNESSEE VALLEY AUTHORITY CH ATTANOOGA, TENNESSEE 374o1 1750 Chestnut Street Tower II October 8, 1982 cu N

Y-

q Mr. James P. O'Reilly, Director e

7 b e-U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement ZZ NO N

Region II 101 Marietta Street, Suite 3100

[

Atlanta, Georgia 30303 m. a

{Z

Dear Mr. O'Reilly:

e m

TENNESSEE VALLE' fHORITY - SEQUOYAH NUCLEAR PLANT UNI t * - DOCKET NO. 50-327 - FACILITY OPERATING LICENSE DPR REPORTAB E OCCURRENCE REPORT SQRO-50-327/82112 The enclosed report provides details concerning the inoperability of the upper head injection system. This report is submitted in accordance with Sequoyah unit 1 Technical Specification 6.9.1.13.b.

Very truly yours, TENNESS VALLEY AUTHORITY H. J een Dir tor of Nuclear Power Enclosure cc (Enclosure):

Document Control Desk-U.S. Nuclear Regulatory Commission Washington, DC 20555 Records Center Institute of Nuclear Power Operations Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30339 NRC Inspector, Sequoyah i

,c#cg4 jl?h o1 m

8210220081 821008 OM ON i

An Equal opportunity Employer