The inspectors are opening a
URI to facilitate prompt tracking, documentation, and closure of inspection, verification, and resolution activities, including enforcement action determinations, associated with the Alert declaration due to the electrical fault resulting in an explosion/fire in the Unit 1
BOP 4 kV switchgear bus area. The inspectors are opening a
URI to review the root cause and determine if a performance deficiency exists. On February 7, 2015, operations personnel declared an Alert for Units 1 and 2, in accordance with Emergency Action Level HA 2.1 due to an explosion/fire in the Unit 1
BOP 4 kV switchgear bus area. A
manual reactor SCRAM was initiated due to loss of both recirculation system variable speed drives as a result of an electrical fault. The
SAT experienced a lockout fault; interrupting offsite power to emergency buses 1 and 2.
EDGs 1, 2, 3, and 4 automatically started and
EDGs 1 and 2 synchronized to emergency buses 1 and 2 per design. The licensee restored offsite power to the emergency buses and exited the
NOUE. The licensee wrote
NCR 1998726 to address this event. This issue is being tracked as a URI:
URI 05000325/2016001-03; Alert Declared Due to Electrical Fault Resulting in a Fire/Explosion.