05000289/FIN-2012004-02 | 2012Q3 | | Remote Shutdown Relay 69X1RR Contact Failure |
05000289/FIN-2012403-02 | 2012Q3 | P.5 | Security |
05000289/FIN-2012403-01 | 2012Q3 | H.14 | Security |
05000289/FIN-2012004-01 | 2012Q3 | H.5 | Failure to Maintain Combustible Loading in the Bwst Tunnel within Fhar Limits |
05000289/FIN-2012005-02 | 2012Q4 | P.1 | Failure to Identify and Correct Licensing Basis Flood Barrier and Support Equipment Deficiencies in Intake Screen and Pump House |
05000289/FIN-2012005-01 | 2012Q4 | H.14 | Adequacy of Seismic Gap Flood Seal |
05000289/FIN-2012012-01 | 2012Q4 | | Failure to provide complete and accurate decommissioning status reports |
05000289/FIN-2012005-03 | 2012Q4 | P.1 | Failure to Identify and Correct Missing Electrical Conduit Flood Seals in the Air Intake Tunnel |
05000289/FIN-2013002-01 | 2013Q1 | P.2 | Failure to Maintain Combustible Loading Near the B CST within Fhar Limits |
05000289/FIN-2013404-02 | 2013Q2 | | Security |
05000289/FIN-2013404-01 | 2013Q2 | | Security |