05000277/FIN-2014007-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Deficient E2 EDG Loading Calculation Design |
Description | The team identified a Green non-cited violation of Title 10 Code of Federal Regulations 50, Appendix B, Criterion III, Design Control, for failure to verify and ensure that the emergency diesel generators (EDGs) were capable of performing their design safety functions at the limits of voltage and frequency allowed by Technical Specifications (TS). Specifically, the existing EDG loading calculation permitted the E2 EDG and associated bus to be loaded up to 3100 KW at nominal frequency and voltage. At the maximum frequency and voltage values permitted by TS, the calculation-allowed maximum load would have exceeded the EDG 30-minute rating limit of 3250 KW and potentially damaged the EDG. Immediate corrective actions included evaluation of EDG loading for TS maximum voltage and frequency and changing design calculation PE-0166 to reduce the maximum permitted E2 EDG load from 3100 kW to 3052 kW at nominal voltage and frequency. Exelon entered the issue into their corrective action program (issue report 1638255) to evaluate the adequacy of the design and ensure that the allowed maximum diesel loading would not exceed the design capabilities of the diesels. The finding was more than minor because it was associated with the Mitigating Systems Cornerstone attribute of design control and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of the emergency diesels to respond to initiating events to prevent undesirable consequences. The team evaluated the finding in accordance with Inspection Manual Chapter (IMC) 0609, Significance Determination Process, Attachment 0609.04, Initial Characterization of Findings, dated June 19, 2012, for the Mitigating Systems Cornerstone, and IMC 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012. The team determined the finding was of very low safety significance because it was a design deficiency confirmed not to result in a loss of EDG operability. This team assigned a cross-cutting aspect associated with this finding because the performance deficiency continued during the 2012 assessment of WCAP-17308-NP and was reflective of current performance. The team determined this finding had a crosscutting aspect in the area of Problem Identification and Resolution, Evaluation (PI.2), because engineers did not thoroughly evaluate the EDG loading issue and ensure the resolution addressed its cause commensurate with the safety significance. Specifically, Exelon relied on invalid assumptions to determine the issue was not applicable, and did not thoroughly evaluat
the technical issue addressed in the WCAP. |
Site: | Peach Bottom |
---|---|
Report | IR 05000277/2014007 Section 1R21 |
Date counted | Jun 30, 2014 (2014Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.21 |
Inspectors (proximate) | G Ottenberg H Campbell J Ayala N Della Grecap Krohn T O'Hara W Cook |
Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control Technical Specification |
CCA | P.2, Evaluation |
INPO aspect | PI.2 |
' | |