| Q | CCA | Title |
---|
05000275/FIN-2011004-01 | 2011Q3 | H.5 | Failure to Maintain the Control Room Habitability System in the Design Configuration |
05000275/FIN-2011004-03 | 2011Q3 | P.3 | Failure to Maintain a Fire Barrier |
05000275/FIN-2011004-04 | 2011Q3 | P.2 | Failure to Perform Surveillances on Fire Barriers |
05000275/FIN-2011004-05 | 2011Q3 | H.14 | Failure to Ensure Emergency Response Organization Qualifications |
05000275/FIN-2011004-06 | 2011Q3 | H.8 | Failure to Follow a Procedural Requirement for Reactivity Manipulation |
05000275/FIN-2011403-01 | 2011Q3 | | Security |
05000275/FIN-2011004-02 | 2011Q3 | | Inconsistent Control Room In-Leakage Test Results Reported to NRC |
05000275/FIN-2011005-01 | 2011Q4 | P.2 | Less than Adequate Evaluations of a Degreaded/Non-conforming Control Room Habitability Train |
05000275/FIN-2011005-02 | 2011Q4 | H.14 | Failure to Perform an Operability Determination for New Seismic Information |
05000275/FIN-2012002-02 | 2012Q1 | | Incomplete and Inaccurate Information Provided to the NRC in Response to Generic Letter 2003-01, Control Room Habitability |
05000275/FIN-2012002-01 | 2012Q1 | P.2 | Inadequate Operability Determination |
05000275/FIN-2012403-01 | 2012Q1 | P.6 | Security |