| | Q | CCA | Title |
|---|
| 05000270/FIN-2015004-02 | 2015Q4 | H.8 | Failure to Accomplish Activities Affecting Quality in Accordance With Station Instructions and Procedures Which Resulted in a Valid AFIS Actuation |
| 05000269/FIN-2015004-01 | 2015Q4 | H.7 | Failure to Adequately Maintain Controlled Procedures in Emergency Response Facilities |
| 05000269/FIN-2016008-01 | 2015Q4 | | Potential lack of adequacy of the licensees maintenance program to detect substantial degradation of cables and their connections used on Oconee large oil filled stationary transformers |
| 05000269/FIN-2016007-02 | 2016Q1 | H.13 | Postulated Fire Affecting High Pressure Injection Pump Did Not Receive a VFDR Evaluation |
| 05000269/FIN-2016007-01 | 2016Q1 | | Pressure Boundary of Motor Operated Valves Could be Breached Due to Fire- Induced Hot Short |
| 05000287/FIN-2016002-04 | 2016Q2 | | Failure to Make a Non-Emergency Eight Hour Notification of a Loss of Safety Function |
| 05000287/FIN-2016002-01 | 2016Q2 | | Failure to Perform ISI General Visual Examinations of Containment Moisture Barrier |
| 05000287/FIN-2016002-03 | 2016Q2 | P.2 | Degraded power cables result in inoperable startup transformer and loss of Unit 3 safety function |
| 05000269/FIN-2016002-02 | 2016Q2 | H.8 | Failure to Properly Control Transient Combustible Materials in the Oconee Main Control Rooms |
| 05000269/FIN-2016405-01 | 2016Q3 | | Security |
| 05000269/FIN-2016003-01 | 2016Q3 | H.6 | Failure to Translate Design Requirements to Prevent the Effects of Waterhammer |