LER-1982-005, Forwards LER 82-005/03L-0.Detailed Event Analysis Encl |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2671982005R00 - NRC Website |
|
text
,
Public Service Company Cf OdlcIrade 4
16805 Road 19 1/2, Clatteville, Colorado 80651-9298 March 17, 1982 Fort St. Vrain Unit No. 1 e,a P-82082 g
//
2 RECBVED g.
H MAR 2 51982>
]6, g
- - 7, Mr. John T. Collins, Regional Administrator Region IV rAc acuuss u Nuclear Regulatory Commission 8
611 Ryan Plaza Drive g
Suite 1000 e
y Arlington, Texas 76011
Reference:
Facility Operating License No. DPR-34 Docket No. 50-267
Dear Mr. Collins:
Enclosed please find a copy of Reportable Occurrence Report No. 50-267/82-005, Final, submitted per the requirements of Technical Specification AC 7.5.2(b)3.
Also, please find enclosed one copy of the Licensee Event Report for i
Reportable Occurrence Report No. 50-267/82-005.
l Very truly yours,
- - f}%wbs Don Warembourg Manager, Nuclear Production DW/cis Enclosure
],[R@fHfRV/[5P, cc:
Director, MIPC
= =-
i MM 2 2 l932
[
V.
Lo l
JL 8203260186 820317 k
PDR ADOCK 05000267 ft l
S PDR
W REPORTABLE OCCURRENCE DISTRIBUTION Nus6er of Copies _
1 (P Tetter)
Dep ar tment o f Ene rgy - - -
San Frmcisco Operations Of fice California Patent Group Attn:
1331 Broadway Oak 1snd, California 94612 1 (P Letter)
Department of Ene rgy - - - - - - - - -
Mr. Glen A. Newby, Chief IITR Branch Division of Nuclear Power Development Mail Station B-107 Washington, D.C.
20545 e
1 (P Letter)
Dep attmen t o f Ener gy - - - - - - - - - - - - - - - - - - - - - - -
Attnt Project Manager 110 West A Street, Suite 460 San Diego, California 92101 1 Original of P !stter)
- --- - - - - - -- l
- tr. John T. Collins, Regional Administrator Region IV Nuclear Regulatory Constission 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011 1 (P Letter)
Mr. Ge o rge Kuzmy cz - -
Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20034 1 (P !stter)
Director - - - - - - -
ion and Program Control Of fice of Maagement Informat Nuclear Regulatory Cossaission Washington, D.C.
20555 1 (P Letter)
Re cor ds Cent e r -
Institute of Nuclear Power Operations 1820 Water Place Atlanta, Georgia 30339 10 (Original of FPLG Letter, Mr. Richard Phelps, FSV, CA Site Representative - - - - - - - - - - -
two copies of FPLC Letter, and one copy of P Letter)
General Atomic Co g any 16864 Weld County Road 191/2 Platteville, Colorado 80651 1 (P Letter)
NRC Resident Site inspector (y
REPORT DATE:
tiarch 17, 1982 REPORTABLE OCCURRENCE 82-005 ISSUE O OCCURRENCE DATE:
February 15, 1932 Page 1 of a FORT ST. VRAIN NUCLEAR GENERATING STATION PUBLIC SERVICE COMPANY OF COLORADO 16805 WELD COUNTY ROAD 19 l/2 PLATTEVILLE, COLORADO 80651-9298 REPORT NO. 50-267/82-005/03-L-0 Final IDENTIFICATION OF OCCURRENCE:
On February 15, 1982, with the reactor pressurized to greater than 100 psia and subcritical, a Loop 2 steam generator penetration pressure switch was found isolated which could have allowed pressure between the steam generator penetration rupture disk and the associated relief valve to be in excess of that specified in LCO 4.2.7(d).
This is reportable per Fort St.
Vrain Technical Specification AC 7.5.2(b)3.
EVENT
DESCRIPTION
(Footnotes ([ ) refer to Figure 1)
At 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br />, February 15, 1982, high gas pressure in the piping betwea No. I Loop 2 steam g rator penetration interspace rupture disk 1 an safety valve 2 caused the pressure swi
, set at 4.5 psig, 3 to open, tripping the Control Room alarm 4 The operat tooK appropriate action by opening the safety stem vent valve o using the Control Room vent valve hand switch 6 This action, while appropriate for the situation, failed to clear the alarm indication.
Since the alarm indication did not clear, at 0710 hours0.00822 days <br />0.197 hours <br />0.00117 weeks <br />2.70155e-4 months <br /> on February 15, 1982, the operator took further appropriate action by switching to the No. 2 safety sys'a This was accomplished by using tne k valve hand switch 7 to close the 1
block valve and simultaneously open ne No. 2 block valve An Instrumentation Technician, calleo to troubleshoot the failure of the alarm to clear, verified proper operation of the No. 1 vent valve, thus, giving assurance that the No. 1 safety system piping had been oreviously relieved of gas pressure.
Further investigation revealed the pressure switch to be in a tripped condition. The technic n lightly tapped the pressure sw *ch while opening a vent valve 10 located on the' same rack 11 the pressure switch was mountec n.
This action caused the pressure switch to reset and clear the alarm. The technician pressurized and vented the pressure switch several times to observe the switching action.
He verified
REPORTABLE OCCURRENCE 82-005 ISSUE O Page 2 of 4 the setpoint was properly calibrated to about 4.5 psig and that the switch was functioning smoothly. Ass. ming that the problem had been caused by a sticking switch mechanism, and that this had been corrected, the technician vented the switch, leaving it in a reset condition.
At 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> on February 16, 1982, the Loop 2 steam generator rupture disk No. I leak alarm again alerted Control Room personnel of high No. I safety ^ system gas pressure.
The Reactor Operator took appropriate action by opening the vent valve, but again, the alarm failed to clear.
An Equipment Operator dispatched to the No. I safety stem, discovered the pressure switch root isolation valve 12 was in a closed position. He opened the isolation valve and observed operation of the vent valve while the Reactor Operator opened it once more. The vent valve did open properly, gas pressure was relieved, and the alarm cleared.
CAUSE
DESCRIPTION:
The cause for the occurrence was the root isolation valve to P3-11158 being closed for unknown reasons. There was enough leakage past the seat of the root isolation valve that the pressure switch could trip.
Although the pressure between the rupture disk and relief valve-could have exceeded the 5 psig allowed by LCO 4.2.7(d), the functional requirements of the system could still have been met.
CORRECTIVE ACTION:
In both instances, when the alarm was received (0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> on February-15, 1932, and 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> on February 16, 1982),
immediate action was taken to vent the safety system to the Reactor Building atmosphere, and in both instances, operation of the vent valve was verified.
The pressure switch was tested and found to be operable and within l
setpoint tolerances.
The pressure switch isolation valve was opened to the full open position.
I No further corrective action is anticipated or required.
l
...:e4,u
REPORTABLE OCCURRENCE 82-005 FIGURE 1 ISSUE O
~
Page 3 of 4 h
To Atmosphere Outside Reactor Building PAH-lll58----]
b l
I-13 8
- - h V-ll 39
)
l g
Set at 475 psig h
i PS-l l l ',8 v
Threaded Local yh Plug and h
Ven t N
Test Con-Valve nection HS-(2) 1116(i A
I T7 Local g Valve l
Isolation l
O u
O O
k 2
To Reactor rg
> Building Atmosphere
( V-ll29
)
( HV-11166 )
l O v
( M-1103 h5f System HS-b 11164 H V-lll64-2 )
g g
(I[
(H V-l ll 64-1 3 __
Puri fied Helium From
)
Loop 2 Steam Generator i
Penetration Interspaces LOOP 2 STEAM GENERATOR PENETRATI0fl If1TERSPACE, iiO.1 RUPTURE DISK AilD SAFETY VALVE SYSTEM T
s REPORTABLE OCCURRENCE 82-005 6
ISSUE O 4
)a
~
4 Prepared By:
Paul A. Tramp
/
Technical Services Technician Reviewed By:
Charles Fuller Technical Services Engineering Supervisor Reviewed By:
[4 k/
A7 Ecwin D. Hill g
/
Station Manager Approved By:
MwM Don Waremoourg
)
Manager, Nuclear Prod Ktion l
l l
y
.7---.
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000267/LER-1982-001-03, /03L-0:on 820108,18 Snubbers Found Inoperable During Surveillance Testing,Indicating Inoperability During Reactor Operation.Caused by Seal Leakage & Deficiencies in Piston Position & Oil Level.Snubbers Repaired | /03L-0:on 820108,18 Snubbers Found Inoperable During Surveillance Testing,Indicating Inoperability During Reactor Operation.Caused by Seal Leakage & Deficiencies in Piston Position & Oil Level.Snubbers Repaired | | | 05000267/LER-1982-001, Forwards LER 82-001/03L-0.Detailed Event Analysis Encl | Forwards LER 82-001/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-002, Forwards LER 82-002/03L-0.Detailed Event Analysis Encl | Forwards LER 82-002/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-002-03, /03L-0:on 820121,during Surveillance Testing, W/Reactor Shut Down,Three Loss of Bearing Water Pressure Differential Switches Found W/Setpoints Less Conservative than Required.Caused by Instrument Drift.Switches Recalibr | /03L-0:on 820121,during Surveillance Testing, W/Reactor Shut Down,Three Loss of Bearing Water Pressure Differential Switches Found W/Setpoints Less Conservative than Required.Caused by Instrument Drift.Switches Recalibr | | | 05000267/LER-1982-003, Forwards LER 82-003/03L-0.Detailed Event Analysis Encl | Forwards LER 82-003/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-003-03, /03L-0:on 820122,one Drain Malfunction Pressure Differential Switch on 1C Helium Circulator Found Less Conservative than Tech Specs.Caused by Dirty Contacts. Contacts Cleaned & Switch Recalibr | /03L-0:on 820122,one Drain Malfunction Pressure Differential Switch on 1C Helium Circulator Found Less Conservative than Tech Specs.Caused by Dirty Contacts. Contacts Cleaned & Switch Recalibr | | | 05000267/LER-1982-004-01, /01T-0:on 820202,inadvertent Radioactive Liquid Waste Release Occurred from Receiver a During Plant Shutdown for Design Mods to Circulator Auxiliary Sys.Caused by Improper Valve Lineup.Event Reviewed W/Operators | /01T-0:on 820202,inadvertent Radioactive Liquid Waste Release Occurred from Receiver a During Plant Shutdown for Design Mods to Circulator Auxiliary Sys.Caused by Improper Valve Lineup.Event Reviewed W/Operators | | | 05000267/LER-1982-004, Forwards LER 82-004/01T-0.Detailed Event Analysis Encl | Forwards LER 82-004/01T-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-005, Forwards LER 82-005/03L-0.Detailed Event Analysis Encl | Forwards LER 82-005/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-005-03, /03L-0:on 820215,loop 2 Steam Generator Penetration Rupture Disk 1 Leak Alarm Pressure Switch Found Isolated.Caused by Closed Pressure Switch Isolation Valve.Valve Opened | /03L-0:on 820215,loop 2 Steam Generator Penetration Rupture Disk 1 Leak Alarm Pressure Switch Found Isolated.Caused by Closed Pressure Switch Isolation Valve.Valve Opened | | | 05000267/LER-1982-006, Forwards LER 82-006/03L-0.Detailed Event Analysis Encl | Forwards LER 82-006/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-006-03, /03L-0:on 820218,primary Coolant Moisture Exceeded Tech Specs.Caused by Contamination W/Moisture During Maint Outage.Reactor Shutdown & Coolant Purification Trains Utilized to Reduce Impurity Levels | /03L-0:on 820218,primary Coolant Moisture Exceeded Tech Specs.Caused by Contamination W/Moisture During Maint Outage.Reactor Shutdown & Coolant Purification Trains Utilized to Reduce Impurity Levels | | | 05000267/LER-1982-007, Forwards LER 82-007/01T-0.Detailed Event Analysis Encl | Forwards LER 82-007/01T-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-007-01, /01T-0:on 820222,control Rod Pairs for Regions 7 & 28 Did Not Insert Automatically Following Manual Scram. Possibly Caused by Binding or Sticking of Control Rod Drive Mechanism.Control Rods Exercised to Eliminate Sticking | /01T-0:on 820222,control Rod Pairs for Regions 7 & 28 Did Not Insert Automatically Following Manual Scram. Possibly Caused by Binding or Sticking of Control Rod Drive Mechanism.Control Rods Exercised to Eliminate Sticking | | | 05000267/LER-1982-008-03, /03L-0:on 820228,nine Class 1 Snubbers Found Inoperable During Surveillance Testing of Hydraulic Shock Suppressors.Caused by Thermal Contraction &/Or External Seal Leakage.Snubbers Repaired as Required | /03L-0:on 820228,nine Class 1 Snubbers Found Inoperable During Surveillance Testing of Hydraulic Shock Suppressors.Caused by Thermal Contraction &/Or External Seal Leakage.Snubbers Repaired as Required | | | 05000267/LER-1982-009-03, /03L-0:on 820306,during Valve Lineup for Authorized Gas Waste Release,Some Gas Released Through Vacuum Tank.Caused by Valve Left Open During Preparations. Unsampled Release Terminated & Valve Lineup Corrected | /03L-0:on 820306,during Valve Lineup for Authorized Gas Waste Release,Some Gas Released Through Vacuum Tank.Caused by Valve Left Open During Preparations. Unsampled Release Terminated & Valve Lineup Corrected | | | 05000267/LER-1982-010-03, /03L-0:on 820407 & 11,pure Helium Leakage in Steam Generator Interspace Found in Excess of Limits.Caused by Faulty Seal.Sys Modified | /03L-0:on 820407 & 11,pure Helium Leakage in Steam Generator Interspace Found in Excess of Limits.Caused by Faulty Seal.Sys Modified | | | 05000267/LER-1982-011-03, /03L-0:during 820412-20,plant Operated in Degraded Mode of Limiting Conditions for Operation 4.2.11 Three Times & 4.2.10 Once.Caused by Offgas of Moisture from Core as Plant Returned to Power from Maint Outage | /03L-0:during 820412-20,plant Operated in Degraded Mode of Limiting Conditions for Operation 4.2.11 Three Times & 4.2.10 Once.Caused by Offgas of Moisture from Core as Plant Returned to Power from Maint Outage | | | 05000267/LER-1982-011, Forwards LER 82-011/03L-0.Detailed Event Analysis Encl | Forwards LER 82-011/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-012-03, /03L-0:on 820410,at 10% Power,Instrument Air Compressor 1C Temporarily Taken Out of Svc to Repair after- Cooler Leak.Water Leak Caused by Normal Wear of after- Cooler.Air Compressor Returned to Svc After Repairs | /03L-0:on 820410,at 10% Power,Instrument Air Compressor 1C Temporarily Taken Out of Svc to Repair after- Cooler Leak.Water Leak Caused by Normal Wear of after- Cooler.Air Compressor Returned to Svc After Repairs | | | 05000267/LER-1982-012, Forwards LER 82-012/03L-0.Detailed Event Analysis Encl | Forwards LER 82-012/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-013, Forwards LER 82-013/03L-0.Detailed Event Analysis Encl | Forwards LER 82-013/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-013-03, /03L-0:on 820412,separation in Axial Positions of Two Partially Inserted Control Rod Groups Fell Slightly Below Limit of 10 Ft.Cause Not Stated.Control Rods Repositioned | /03L-0:on 820412,separation in Axial Positions of Two Partially Inserted Control Rod Groups Fell Slightly Below Limit of 10 Ft.Cause Not Stated.Control Rods Repositioned | | | 05000267/LER-1982-014-03, /03L-0:between 820417 & 26,only One Complete Pcrv Liner Cooling Loop Was Operable.Caused by Isolating Loop 1 Subheaders to Locate Primary Coolant to Pcrv Liner Cooling Sys Leak.Extent & Cause of Tube Failure Unknown | /03L-0:between 820417 & 26,only One Complete Pcrv Liner Cooling Loop Was Operable.Caused by Isolating Loop 1 Subheaders to Locate Primary Coolant to Pcrv Liner Cooling Sys Leak.Extent & Cause of Tube Failure Unknown | | | 05000267/LER-1982-014, Forwards LER 82-014/03L-0.Detailed Event Analysis Encl | Forwards LER 82-014/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-015-03, /03L-0:on 820418 & 19,w/plant Operating at Power, Emergency Feedwater to Loop 2 Circulator Water Turbine Drives Were Isolated to Repair PV-21244 & PV-21244-1.Caused by Normal Wear,Resulting in Excessive Flow | /03L-0:on 820418 & 19,w/plant Operating at Power, Emergency Feedwater to Loop 2 Circulator Water Turbine Drives Were Isolated to Repair PV-21244 & PV-21244-1.Caused by Normal Wear,Resulting in Excessive Flow | | | 05000267/LER-1982-015, Forwards LER 82-015/03L-0.Detailed Event Analysis Encl | Forwards LER 82-015/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-016-03, /03L-0:on 820427,during Surveillance Testing,Class I Hydraulic Check & Sway Suppressor Snubber CRS-144 Found Inoperable.Caused by Seal & Gasket Leakage Allowing Loss of Hydraulic Oil.Snubber Rebuilt | /03L-0:on 820427,during Surveillance Testing,Class I Hydraulic Check & Sway Suppressor Snubber CRS-144 Found Inoperable.Caused by Seal & Gasket Leakage Allowing Loss of Hydraulic Oil.Snubber Rebuilt | | | 05000267/LER-1982-017, Forwards LER 82-017/03L-0.Detailed Event Analysis Encl | Forwards LER 82-017/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-017-03, /03L-0:on 820512,total Primary Coolant Oxidants Exceeded Tech Spec.Caused by Prolonged Maint Outage Allowing Power Operated Relief Valve Depressurization.Offgassing of Core Moisture/Oxidants Resulted When Plant Returned to S | /03L-0:on 820512,total Primary Coolant Oxidants Exceeded Tech Spec.Caused by Prolonged Maint Outage Allowing Power Operated Relief Valve Depressurization.Offgassing of Core Moisture/Oxidants Resulted When Plant Returned to Svc | | | 05000267/LER-1982-018-03, /03L-0:on 820501,essential 480-volt Buses Tie Breaker Would Not Close During Surveillance Test Simulating Loss of Outside Power & Turbine Trip.Caused by Breaker Spring Charging Motor Switch in Off Position | /03L-0:on 820501,essential 480-volt Buses Tie Breaker Would Not Close During Surveillance Test Simulating Loss of Outside Power & Turbine Trip.Caused by Breaker Spring Charging Motor Switch in Off Position | | | 05000267/LER-1982-018, Forwards LER 82-018/03L-0.Detailed Event Analysis Encl | Forwards LER 82-018/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-019-03, /03L-0:on 820518,during Feedwater Flow Surveillance Test,Circulator 1A Speed Program Switch & Two Feedwater Flow Switches Were Out of Calibr.Caused by Instrument Drift.Switches Recalibr | /03L-0:on 820518,during Feedwater Flow Surveillance Test,Circulator 1A Speed Program Switch & Two Feedwater Flow Switches Were Out of Calibr.Caused by Instrument Drift.Switches Recalibr | | | 05000267/LER-1982-019, Forwards LER 82-019/03L-0.Detailed Event Analysis Encl | Forwards LER 82-019/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-020-03, /03L-0:on 820517,w/reactor Operating at 40% Power & Pcrv Pressurized to Greater than 100 Psia,Primary & Secondary Interspace Penetration Pressure Decreased Below Allowable Limits.Caused by Impurities in Low Temp Absorber | /03L-0:on 820517,w/reactor Operating at 40% Power & Pcrv Pressurized to Greater than 100 Psia,Primary & Secondary Interspace Penetration Pressure Decreased Below Allowable Limits.Caused by Impurities in Low Temp Absorber | | | 05000267/LER-1982-020, Forwards LER 82-020/03L-0.Detailed Event Analysis Encl | Forwards LER 82-020/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-021-03, /03L-0:on 820517,plant Protective Sys Circulator Speed Module Found Reading Too Low.Caused by Loose Speed Switch Module Pin Connector,Which Made Poor Connection. Connector Reseated & Tightened in Place | /03L-0:on 820517,plant Protective Sys Circulator Speed Module Found Reading Too Low.Caused by Loose Speed Switch Module Pin Connector,Which Made Poor Connection. Connector Reseated & Tightened in Place | | | 05000267/LER-1982-022-03, /03L-0:on 820521,unplanned Radiological Releases from Reactor Bldg Exhaust Stack Occurred.Caused by Isolation Valve Closure Due to Personnel Error & Airborne Activity Entering Containment Tank Through Water Traps | /03L-0:on 820521,unplanned Radiological Releases from Reactor Bldg Exhaust Stack Occurred.Caused by Isolation Valve Closure Due to Personnel Error & Airborne Activity Entering Containment Tank Through Water Traps | | | 05000267/LER-1982-023-03, /03L-0:on 820527,primary Coolant Oxidants Exceeded Tech Specs AC 7.5.2(b)2 on Three Separate Occasions.Caused by Gradual Ingress of Moisture & Oxidants.Moisture & Oxidant Offgassed from Core.Power & Temp Reduced | /03L-0:on 820527,primary Coolant Oxidants Exceeded Tech Specs AC 7.5.2(b)2 on Three Separate Occasions.Caused by Gradual Ingress of Moisture & Oxidants.Moisture & Oxidant Offgassed from Core.Power & Temp Reduced | | | 05000267/LER-1982-023, Forwards LER 82-023/03L-0.Detailed Event Analysis Encl | Forwards LER 82-023/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-024, Forwards LER 82-024/03X-2.Detailed Event Analysis Encl | Forwards LER 82-024/03X-2.Detailed Event Analysis Encl | | | 05000267/LER-1982-024-03, /03L-0:on 820605,all Three 480-volt Essential Buses Were Lost.Caused by Improperly Calibr Undervoltage Relays Due to Inadequate Relay Calibr Procedure.Procedure Updated | /03L-0:on 820605,all Three 480-volt Essential Buses Were Lost.Caused by Improperly Calibr Undervoltage Relays Due to Inadequate Relay Calibr Procedure.Procedure Updated | | | 05000267/LER-1982-025, Forwards LER 82-025/03L-1.Detailed Event Analysis Encl | Forwards LER 82-025/03L-1.Detailed Event Analysis Encl | | | 05000267/LER-1982-026, Forwards LER 82-026/03L-0.Detailed Event Analysis Encl | Forwards LER 82-026/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-026-03, /03L-0:on 820615,total Primary Coolant Oxidants Exceeded Limiting Conditions for Operation on Two Occasions. Caused by Water in Core Due to Sudden Pressure Surge from Loss of 480-volt Essential Busses.Concentrations Reduced | /03L-0:on 820615,total Primary Coolant Oxidants Exceeded Limiting Conditions for Operation on Two Occasions. Caused by Water in Core Due to Sudden Pressure Surge from Loss of 480-volt Essential Busses.Concentrations Reduced | | | 05000267/LER-1982-027-03, /03L-0:on 820628,11 Flow Alarms Found Out of Tolerance During Primary Coolant Moisture Instrumentation Sample Flow Alarm Function Test.Caused by Instrument Drift & Procedural Inadequacy.Setpoints Readjusted | /03L-0:on 820628,11 Flow Alarms Found Out of Tolerance During Primary Coolant Moisture Instrumentation Sample Flow Alarm Function Test.Caused by Instrument Drift & Procedural Inadequacy.Setpoints Readjusted | | | 05000267/LER-1982-027, Forwards LER 82-027/03L-0.Detailed Event Analysis Encl | Forwards LER 82-027/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-028, Forwards LER 82-028/03L-0.Detailed Event Analysis Encl | Forwards LER 82-028/03L-0.Detailed Event Analysis Encl | | | 05000267/LER-1982-028-03, /03L-0:on 820707,excessive Water Leakage Through PV-21244 Necessitated Isolation of Emergency Feedwater Supply Header.Caused by Water Cut in Valve Seat & Plug. Valve Ring Seat,Plug Assembly,Body & Seat Gaskets Replaced | /03L-0:on 820707,excessive Water Leakage Through PV-21244 Necessitated Isolation of Emergency Feedwater Supply Header.Caused by Water Cut in Valve Seat & Plug. Valve Ring Seat,Plug Assembly,Body & Seat Gaskets Replaced | | | 05000267/LER-1982-029-03, /03X-1:on 820712,20 & 21,emergency Feedwater Headers to Helium Circulator Pelton Wheel Drives Isolated to Perform Maint on Leaking Header Safety Valves.Cause of Leakage Not Stated | /03X-1:on 820712,20 & 21,emergency Feedwater Headers to Helium Circulator Pelton Wheel Drives Isolated to Perform Maint on Leaking Header Safety Valves.Cause of Leakage Not Stated | |
|