05000266/FIN-2015002-02
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Control Transient Combustibles During Service Water Pumphouse Maintenance |
Description | A finding of very low safety significance and associated NCV of Technical Specification (TS) 5.4.1.h was identified by the inspectors for the failure to control transient combustible material in accordance with the licensees Fire Protection Program requirements. Specifically, the licensee installed a power cord in the north side of the service water pump room that was subsequently extended also into the south side of the service water pump room across a transient combustible exclusion boundary with no prior evaluation. The licensees corrective actions included immediately removing the power cord from the fire exclusion zone and standing-down the work group for a brief of the event and a review of the requirements for transient combustibles. The inspectors determined the finding was more than minor because the failure to identify the transient combustibles was associated with the Mitigating Systems Cornerstone attribute of Protection Against External Events (Fire) and affected the cornerstone objective of preventing undesirable consequences (i.e., core damage). In accordance with IMC 0609, Significance Determination Process, Attachment 0609.04, Initial Characterization of Findings, Table 2, the inspectors determined the finding affected the Mitigating Systems cornerstone. The finding degraded fire protection defense-in-depth strategies, and the inspectors determined, using Table 3, that it could be evaluated using Appendix F, Fire Protection Significance Determination Process. The inspectors screened the issue to Green under the Phase 1 Screening Question 1.3.B, because the inspectors assigned a Low degradation rating to the single cable that crossed through the exclusion zone. This finding has a cross-cutting aspect of Field Presence (H.2), in the area of human performance, because the licensees leadership did not ensure that oversight of work activities, including contractors and supplemental personnel was provided such that nuclear safety was supported. |
Site: | Point Beach |
---|---|
Report | IR 05000266/2015002 Section 1R05 |
Date counted | Jun 30, 2015 (2015Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.05 |
Inspectors (proximate) | B Bartlett D Oliver J Boettcher J Cameron K Barclay V Myers |
Violation of: | Technical Specification Technical Specification - Procedures |
CCA | H.2, Field Presence |
INPO aspect | LA.2 |
' | |
Finding - Point Beach - IR 05000266/2015002 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Point Beach) @ 2015Q2