| Q | CCA | Title |
---|
05000255/FIN-2012002-02 | 2012Q1 | | Potential Exam Compromise During Requalification Exam |
05000255/FIN-2012002-03 | 2012Q1 | P.5 | Intermittent Fuse Contact Causes Feedwater Transient and Plant Trip |
05000255/FIN-2012002-04 | 2012Q1 | H.14 | Failure to Ensure Reactor Head Vents Closed During PCS Fill |
05000255/FIN-2012002-01 | 2012Q1 | | Potential Exam Compromise During Requalification Exam |
05000255/FIN-2012002-06 | 2012Q1 | | Corrective Action for Potential Fire-Induced Motor Operated Valve Damage |
05000255/FIN-2012003-01 | 2012Q2 | H.2 | Inadequate Design Margins for Evaluation of Leaking SIRWT Nozzles |
05000255/FIN-2012003-02 | 2012Q2 | | Operation of Primary Coolant Pumps Outside Design Basis |
05000255/FIN-2012003-03 | 2012Q2 | H.2 | Failure to Follow Work Management Process for Reactor Head Work |
05000255/FIN-2012004-01 | 2012Q3 | H.14 | Failure to Follow Work Management Processes |
05000255/FIN-2012004-02 | 2012Q3 | H.5 | Water Leakage into Control Room during Maintenance |
05000255/FIN-2012004-03 | 2012Q3 | H.2 | Foreign Material in SIRWT |
05000255/FIN-2012012-03 | 2012Q3 | | Potential Failure to Prevent Recurrence of a Significant Condition Adverse to Quality |
05000255/FIN-2012012-02 | 2012Q3 | | Potential Inadequate Degradation Evaluation of CRDM Housings |
05000255/FIN-2012012-01 | 2012Q3 | | TS for PCS Pressure Boundary Leakage |
05000255/FIN-2012406-01 | 2012Q4 | | Security |
05000255/FIN-2012005-03 | 2012Q4 | | Safety Injection Refueling Water Tank Evaluation of Corrosion |
05000255/FIN-2012005-04 | 2012Q4 | | Underground Pipe and Tank Program- Potential Deviations from NEI 09-14 Guide |
05000255/FIN-2012005-01 | 2012Q4 | H.13 | Failure to Perform Immediate Operability Determination |
05000255/FIN-2012005-05 | 2012Q4 | | Concerns with the Methodology Used to Determine Suction Side Void Acceptance Criteria |
05000255/FIN-2012404-01 | 2012Q4 | P.2 | Security |
05000255/FIN-2012005-02 | 2012Q4 | P.2 | Failure to Manage Non-Covered Worker Hours |