| Q | CCA | Title |
---|
05000255/FIN-2009006-02 | 2009Q4 | P.2 | Failure to Translate the Design Basis for the CV-11 Control Room HVAC Chiller Into Specifications and Drawings |
05000255/FIN-2009005-02 | 2009Q4 | | Adequacy of evaluation of interface with state and local governments |
05000255/FIN-2009005-01 | 2009Q4 | | NOED for repair to service water pump P-7C |
05000255/FIN-2009006-01 | 2009Q4 | P.5 | Agastat Time Delay Relays Design, Testing and Configuration Control Issues |
05000255/FIN-2009005-03 | 2009Q4 | | Adequacy of building lightning protection |
05000255/FIN-2009008-01 | 2009Q4 | | Loss of Spent Fuel Pool Neutron Absorption Capability |
05000255/FIN-2010502-01 | 2010Q1 | P.6 | Inadequate Evaluation of Interface with State and Local Governments |
05000255/FIN-2010002-03 | 2010Q1 | | Failure to Adequately Manage Changes to the ODCM |
05000255/FIN-2010002-01 | 2010Q1 | | Inadequate Fire Barrier |
05000255/FIN-2010002-02 | 2010Q1 | H.5 | Improper Construction of Scaffolding |
05000255/FIN-2010004-04 | 2010Q3 | H.7 | Failure to Ensure Code Requirements Met When Performing VT-2 Exams |
05000255/FIN-2010403-02 | 2010Q3 | | Security |
05000255/FIN-2010403-01 | 2010Q3 | | Security |
05000255/FIN-2010404-01 | 2010Q3 | | Security |
05000255/FIN-2010004-05 | 2010Q3 | H.12 | Ground on Preferred AC Bus due to Improperly Installed Electrical Bushing |
05000255/FIN-2010004-02 | 2010Q3 | H.14 | Failure to Complete Actions Required by LCO 3.0.3 and 3.3.1 |
05000255/FIN-2010004-01 | 2010Q3 | H.7 | Failure to Perform an Adequate Risk Assessment for Maintenance Activities |
05000255/FIN-2010004-07 | 2010Q3 | | Description of Liquid Waste Incidents |
05000255/FIN-2010004-06 | 2010Q3 | | Use of TLDs May Not Be Consistent With the Methods Used by the NVLAP Accreditation Process |
05000255/FIN-2010004-03 | 2010Q3 | | Failure to Make 8 hour Report Pursuant to 10 CFR 50.72 |
05000255/FIN-2010009-01 | 2010Q3 | P.2 | Corrective Action to Prevent Recurrence Failed to Address Root Causes |