| Q | CCA | Title |
---|
05000250/FIN-2014005-01 | 2014Q4 | H.12 | Non-Compliance with HRA Entry Requirements |
05000251/FIN-2014005-02 | 2014Q4 | H.1 | Inadequate Procedure to Realign Steam Supply to the Gland Sealing Steam System |
05000250/FIN-2014005-03 | 2014Q4 | H.1 | Failure to Perform an Adequate Design Verification |
05000250/FIN-2014005-04 | 2014Q4 | H.9 | Failure to Fully Implement Emergency Operating Procedure 3-EOP-ES-0.1, Reactor Trip Response |
05000250/FIN-2015007-01 | 2015Q1 | P.2 | Failure to Establish a Reasonable Maintenance Effectiveness Demonstration for the Unit 3 Containment Atmospheric Temperature System Used in EOPs |
05000251/FIN-2015007-03 | 2015Q1 | | Required Appendix R Instrumentation Not Functional on Unit 4 Alternate Shutdown Panel |
05000250/FIN-2015401-01 | 2015Q1 | | Security |
05000251/FIN-2015001-01 | 2015Q1 | | Untimely 10 CFR 50.72 Notification of a ECC System Functional Failure |
05000250/FIN-2015007-02 | 2015Q1 | | Potential Departure From the Eagle 21 Design Basis |
05000250/FIN-2015201-01 | 2015Q2 | | Security |
05000251/FIN-2015002-01 | 2015Q2 | H.1 | Inadequate General Operating Procedure to Prevent Inadvertent AFAS While Performing a Reactor Plant Planned Shutdown |
05000250/FIN-2015404-01 | 2015Q3 | | Security |
05000251/FIN-2015003-01 | 2015Q3 | H.1 | Inadequate Work Instructions for Replacing Main Generator Current Transformers |