Finding | |
---|---|
Title | Inadequate Acceptance Criteria for Testing Equipment Relied Upon to Mitigate the Consequences of a Lock and Dam Failure |
Description | A finding of very low safety significance and associated NCV of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures and Drawings, was identified by the inspectors for the licensees failure to establish adequate acceptance criteria for testing equipment relied upon to mitigate the consequences of a dam failure. Specifically, the acceptance criteria in DOS 0010-01, Dresden Dam Failure Equipment Test, did not consider additional steps required to demonstrate the ability of the screen refuse pumps to deliver water to the enclosure for the safety-related pumps to support operability of the isolation condensers. The licensee entered this issue into the corrective action program and initiated procedure revisions to include these additional steps in the procedures acceptance criteria. The performance deficiency was determined to be more than minor because it adversely affected the availability, reliability, and capability of mitigating systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). The finding screened as of very low safety significance because it was a qualification deficiency confirmed not to result in loss of operability or functionality. Specifically, the licensee estimated that the time it would take to perform the additional steps not included in the procedures acceptance criteria was within the time required. The inspectors determined the cause of this finding did not represent current licensee performance and no cross-cutting aspect was assigned. |
Site: | Dresden |
---|---|
Report | IR 05000237/2011003 Section 1R07 |
Date counted | Jun 30, 2011 (2011Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.07 |
Inspectors (proximate) | M Bielby M Ring T Go J Draper C Tilton J Corujo-Sandin M Munir R Winter A Dahbur D Melendez-Colon C Phillips C Moore |
INPO aspect | |
' | |
Finding - Dresden - IR 05000237/2011003 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Dresden) @ 2011Q2
Self-Identified List (Dresden)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||