| Q | CCA | Title |
---|
05000237/FIN-2010004-04 | 2010Q3 | | Failure to Identify and Correct Test Procedures to Assess the As-Found Trip Setpoint for Pressure Switches that Satisfy Technical Specification Functions |
05000237/FIN-2010004-03 | 2010Q3 | H.13 | Installation of Nonconforming Material Into a Safety-Related System |
05000237/FIN-2010004-02 | 2010Q3 | | Failure to Seal Holes in the Floor Above the Emergency Core Cooling System (ECCS) Corner Rooms |
05000237/FIN-2010004-01 | 2010Q3 | | Failure to Address NRC Concerns Regarding a Reactor Building Closed Cooling Water (RBCCW) Line Break in the Unit 3 Reactor Building |
05000237/FIN-2010005-04 | 2010Q4 | | Adequacy of High Pressure Core Injection System Low Pressure Testing |
05000237/FIN-2010005-02 | 2010Q4 | H.12 | Failure to Perform Magnetic Particle Examination on the 3/2/1501-20/20-10 U3 LPCI Support in Accordance with Procedures |
05000237/FIN-2010005-01 | 2010Q4 | P.3 | Failure to Provide Robust Indication of Adequate Oil Level in High Pressure Coolant Injection Booster Pump Sight Glasses |
05000249/FIN-2010010-01 | 2010Q4 | | Failure to Perform an Ultrasound Thickness Measurement of the Drywell liner in accordance with procedures |
05000237/FIN-2010005-03 | 2010Q4 | | Drywell Equipment Drain Sump Discharge Valves 2-2001-5 and 2-2001-6 Body to Diaphragm Leakage |
05000237/FIN-2011002-01 | 2011Q1 | | Satisfactory Performance of a Surveillance Test Procedure That Was Later Demonstrated to be Not Capable of Being Performed |
05000237/FIN-2011002-02 | 2011Q1 | H.5 | Control Room Ventilation Smoke Detector Failure to Perform Post-Maintenance Testing |
05000237/FIN-2011002-03 | 2011Q1 | | Adequacy of Control Room Ventilation Smoke Purge Function |
05000237/FIN-2011403-01 | 2011Q1 | H.2 | Security |
05000237/FIN-2011002-07 | 2011Q1 | H.11 H.12 | Dresden 3B Circulating Water Pump Bearing Failure Due to Low Oil Level |
05000237/FIN-2011002-06 | 2011Q1 | H.2 | Failure to Follow TS 5.5.2 Implementing Procedures |
05000237/FIN-2011002-05 | 2011Q1 | | Undocumented Technical Basis for Change to EOP ATWS Mitigation Strategy |
05000237/FIN-2011002-04 | 2011Q1 | H.5 | Failure to Perform Surveillance Testing on East Turbine Building Vent HVAC Smoke Detectors |