| Q | CCA | Title |
---|
05000237/FIN-2009005-08 | 2009Q4 | H.7 | Procedural Deficiency Causing a Pressure Pulse Resulting in a Reactor Water Level Low-Low Group 1 Isolation Signal and Unit 3 Reactor Scram |
05000237/FIN-2009005-04 | 2009Q4 | | 2/3 Emergency Diesel Generator (EDG) Overvoltage During Division I Undervoltage Surveillance |
05000237/FIN-2009007-04 | 2009Q4 | | Potential Non-Conservative Fatigue Analysis |
05000237/FIN-2009007-01 | 2009Q4 | H.2 | Ventilation System One-Time Inspection Results |
05000237/FIN-2009007-02 | 2009Q4 | | Unit 2 SBLC Tank Thickness Calculation Errors |
05000237/FIN-2009007-03 | 2009Q4 | H.7 | Failure to Inspect the Non-EQ Electrical Connections Subject to Localized Adverse Environment |
05000237/FIN-2009005-01 | 2009Q4 | H.11 H.12 | Operating Personnel Incorrectly Placed Clearance Tags |
05000237/FIN-2009005-02 | 2009Q4 | H.12 | NRC Inspector-Identified Control Room Alarm Isolation Valve Out-of-Position |
05000237/FIN-2009005-03 | 2009Q4 | H.4 H.5 | Preconditioning the Unit 2 Emergency Diesel Generator Prior to Performing TS Surveillance Requirements |
05000237/FIN-2009005-05 | 2009Q4 | H.11 H.12 | Failure to Follow the Master Refueling Procedure During Movement of Fuel Assembly JLU569 |
05000237/FIN-2009005-09 | 2009Q4 | H.8 | Failure to Ensure a Safety-Related Plug was Ordered and Installed in the 2/3 Emergency Diesel Generator Turbo Lube Oil Y Strainer |
05000237/FIN-2009005-07 | 2009Q4 | | Changes to EAL HU6 Potentially Decreased the Effectiveness of the Plans without Prior NRC Approval |
05000237/FIN-2009005-06 | 2009Q4 | | Mispositioning of a Unit 3 Control Rod at Power |
05000237/FIN-2009005-10 | 2009Q4 | | Electro-Hydraulic Control (EHC) Fluid Leaking From Stop Valve 3-5699-MSV4-FA Resulting in Forced Outage D3F49 |
05000237/FIN-2010002-04 | 2010Q1 | | Significance of Potentially Submerged Safety and Nonsafetyrelated Low Voltage Power and Control Power Cables |
05000237/FIN-2010002-03 | 2010Q1 | H.1 H.2(d) | Failure to Meet Regulatory Commitment to Maintain Contingency Plans for Post-Accident Sampling |
05000237/FIN-2010002-05 | 2010Q1 | P.5 P.2(b) | Electro-Hydraulic Control (EHC) Fluid Leaking From Stop Valve 3-5699-MSV4-FA Resulting in Forced Outage D3F49 |
05000237/FIN-2010002-01 | 2010Q1 | H.7 | Failure to Record the Identity of Personnel Performing Post-Maintenance Tests |
05000237/FIN-2010002-02 | 2010Q1 | H.14 | Failure to Follow Technical Specification 5.5.4 Implementing Procedure |
05000237/FIN-2010003-07 | 2010Q2 | | 2/3 Emergency Diesel Generator (EDG) Overvoltage during Division I Undervoltage |
05000237/FIN-2010003-06 | 2010Q2 | | Failure To Perform An Adequate Inspection of Circulating Water Valve 3-4402-C |
05000237/FIN-2010003-05 | 2010Q2 | P.3 | Failure to Provide An Adequate Procedure for Several Instrument Maintenance Surveillance Tests |
05000237/FIN-2010003-04 | 2010Q2 | | Failure to Monitor Unit 3 Drywell Temperature |
05000237/FIN-2010003-02 | 2010Q2 | | LPCI Room Heat-up Calculation Deficiencies |
05000237/FIN-2010003-01 | 2010Q2 | | High Pressure Coolant Injection (HPCI) Booster Pump Bearing Oil Levels |
05000237/FIN-2010007-03 | 2010Q2 | | Failure to Perform Adequate Testing to Confirm Acceptable Fast Bus Transfer Time |
05000237/FIN-2010007-02 | 2010Q2 | H.14 | Improper Reclassification of LPCI Pump Mechanical Seals |
05000237/FIN-2010007-01 | 2010Q2 | H.14 | Failure to Establish Heat Exchanger Inspection Procedures Appropriate for the Circumstances |
05000237/FIN-2010003-03 | 2010Q2 | | Undocumented Technical Basis for change to EOP ATWS Mitigation Strategy |
05000237/FIN-2010003-08 | 2010Q2 | | Potential Safety Significance of Free-Standing Stack Configuration during MPC Transfer from HI-TRAC Transfer Cask into HI-STORM Storage Cask |
05000237/FIN-2010004-04 | 2010Q3 | | Failure to Identify and Correct Test Procedures to Assess the As-Found Trip Setpoint for Pressure Switches that Satisfy Technical Specification Functions |
05000237/FIN-2010004-03 | 2010Q3 | H.13 | Installation of Nonconforming Material Into a Safety-Related System |
05000237/FIN-2010004-01 | 2010Q3 | | Failure to Address NRC Concerns Regarding a Reactor Building Closed Cooling Water (RBCCW) Line Break in the Unit 3 Reactor Building |
05000237/FIN-2010004-02 | 2010Q3 | | Failure to Seal Holes in the Floor Above the Emergency Core Cooling System (ECCS) Corner Rooms |