05000219/FIN-2011005-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Establish New Reference Values ln Accordance with ASME Code |
Description | The inspectors identified a Green NCV of 10 CFR Part 50.55a, Codes and Standards, because Exelon did not complete an adequate analysis when establishing a new reference value for the A containment spray pump in accordance with the American Society of Mechanical Engineer (ASME) Operation and Maintenance (OM) Code Subsection ISTB 4.6. The inspectors determined that Exelon\'s failure to correctly establish a new reference value for the A containment spray pump in accordance with the requirements of ASME OM Code Subsection ISTB 4.6 was a performance deficiency. Exelon entered this issue into the corrective action program for resolution as lR 1281326. This finding is more than minor because it is similar to IMC 0612, Appendix C, Example 3.j, in that there was a reasonable doubt that the system met ASME operability requirements due to the inadequate evaluation. Additionally, the inspectors determined that this issue was more than minor because it affected the procedure quality attribute of the Mitigating Systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). The inspectors determined this finding was not a design qualification deficiency resulting in a loss of functionality or operability, did not represent an actual loss of safety function of a system or train of equipment, and was not potentially risk-significant due to a seismic, fire, flooding, or severe weather initiating event. Therefore, the finding is considered to be of very low safety significance. This finding has a cross-cutting aspect in the area of Mitigating Systems cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences, because Exelon did not fully follow the ASME requirements in Subsection ISTB 4.6, New Reference Values. |
Site: | Oyster Creek |
---|---|
Report | IR 05000219/2011005 Section 1R15 |
Date counted | Dec 31, 2011 (2011Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.15 |
Inspectors (proximate) | C Newgent G Hunegs J Amberosini J Kulp J White M Modes N Lafferty R Montgomery R Nimitz S Barr |
CCA | P.2, Evaluation |
INPO aspect | PI.2 |
' | |