05000244/FIN-2018011-02: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 13: | Line 13: | ||
| Inspection procedure = IP 71152 | | Inspection procedure = IP 71152 | ||
| Inspector = J Hawkins, C Lally, L Mckown, S Obadina, A Rosebrook, M Catts | | Inspector = J Hawkins, C Lally, L Mckown, S Obadina, A Rosebrook, M Catts | ||
| CCA = | | CCA = | ||
| INPO aspect = QA.4 | | INPO aspect = QA.4 | ||
| description = A self-revealing Green non-cited violation (NCV)of Technical Specification 5.4.1.a, Procedures, was identified for the failure of Exelon to operate refueling equipment in accordance with technical procedures in April and May of 2017, which resulted in a fuel interference event, damage to the rod cluster control assembly, and the need for a detailed inspection of a fuel assembly | | description = A self-revealing Green non-cited violation (NCV)of Technical Specification 5.4.1.a, Procedures, was identified for the failure of Exelon to operate refueling equipment in accordance with technical procedures in April and May of 2017, which resulted in a fuel interference event, damage to the rod cluster control assembly, and the need for a detailed inspection of a fuel assembly | ||
}} | }} |
Latest revision as of 18:35, 10 September 2018
Site: | Ginna |
---|---|
Report | IR 05000244/2018011 Section 4OA2 |
Date counted | Mar 31, 2018 (2018Q1) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | J Hawkins C Lally L Mckown S Obadina A Rosebrook M Catts |
Violation of: | Technical Specification - Procedures |
INPO aspect | QA.4 |
' | |