Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML22111A22431 March 20222 to Updated Safety Analysis Report, Clinton Power Station Operational Requirements Manual (Orm)
ML20105A27731 March 20201 to Updated Safety Analysis Report, CPS Operational Requirements
RS-20-028, 1 to Updated Safety Analysis Report, CPS Tsb31 March 20201 to Updated Safety Analysis Report, CPS Tsb
IR 05000461/20180037 November 2018NRC Integrated Inspection Report 05000461/2018003
IR 05000461/20180023 August 2018NRC Integrated Inspection Report 05000461/2018002
IR 05000461/20170048 February 2018NRC Integrated Inspection Report 05000461/2017004, 07201046/2017001 and Emergency Preparedness Annual Inspection Report 05000461/2017501
05000461/LER-2017-0105 February 2018Division 1 Transformer Failure Leads to Instrument Air Isolation to Containment Requiring a Manual Reactor Scram
LER 17-010-00 for Clinton Power Station, Unit 1 Regarding Division 1 Transformer Failure Leads to Instrument Air Isolation to Containment Requiring a Manual Reactor Scram
05000461/LER-2017-0025 July 2017Failure of the Division 1 Diesel Generator Ventilation Fan Load Sequence Relay Circuit During Concurrent Maintenance of RHR Division 2 Results in an Unanalyzed Condition
LER 17-002-01 for Clinton, Unit 1, Regarding Failure of the Division 1 Diesel Generator Ventilation Fan Load Sequence Relay Circuit During Concurrent Maintenance of RHR Division 2 Results in an Unanalyzed Condition
ML17054C55228 June 2017Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident
IR 05000461/20160049 February 2017NRC Integrated Inspection Report and Exercise of Enforcement Discretion 05000461/2016004, 05000461/2016501 and 07201046/2016003
IR 05000461/20160019 May 2016NRC Integrated Inspection Report 05000461/2016001, January 1, 2016 Through March 31, 2016, Clinton Power Station
IR 05000461/20150036 November 2015IR 05000461/2015003, on 07/01/2015 - 09/30/2015, Clinton Power Station, Unit 1; Operability Determinations and Functionality Assessments, Plant Modifications, and Follow Up of Events and Notices of Enforcement Discretion
IR 05000461/201500823 April 2015IR 05000461/2015008; 03/02/2015 - 03/20/2015; Clinton Power Station; Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
IR 05000461/20140056 February 2015IR 05000461/2014005, October 1, 2014 Through December 31, 2014, Clinton Power Station, Re-Issued Integrated Inspection Report
ML15029A71929 January 2015IR 05000461/2014005; on 10/01/14 - 12/31/14; Clinton Power Station; Adverse Weather Protection, Identification and Resolution of Problems, and Follow-Up of Events and Notices of Enforcement Discretion
ML14164A29826 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident
ML14065A55914 May 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident
RS-14-066, Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review31 March 2014Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems9 January 2014Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems
ML14015A0989 January 2014Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems
RS-14-006, Updated Safety Analysis Report, Revision 16, CPS Operational Requirements Manual9 January 2014Updated Safety Analysis Report, Revision 16, CPS Operational Requirements Manual
ML13325A89123 December 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns
IR 05000461/201300223 April 2013IR 05000461-13-002, 01/01/2013 - 03/31/2013, Clinton Power Station, Unit 1, Radiological Hazard Assessment and Exposure Controls, Identification and Resolution of Problems
RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems10 January 2013Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems
ML13016A31510 January 2013Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems
RS-13-009, Operational Requirements Manual (Orm) 201310 January 2013Operational Requirements Manual (Orm) 2013
RS-12-166, Company, LLCs 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights From.27 November 2012Company, LLCs 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights From.
RS-12-165, 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Report30 October 201212Q0108.60-R-001, Rev. 0, Seismic Walkdown Report
ML12340A34730 October 201212Q0108.60-R-001, Rev. 0, Seismic Walkdown Report
ML12053A34012 March 2012Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident
ML12056A04912 March 2012Enclosure 3 - Recommendation 2.3: Seismic
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: Flooding
IR 05000461/201100229 April 2011IR 05000461-11-002; 01/01/11 - 03/31/11; Clinton Power Station, Unit 1; Fire Protection, Surveillance Testing
IR 05000461/201100925 April 2011Fire Protection Triennial Baseline Inspection NRC Inspection Report 05000461/2011-009
ML11116A14125 April 2011IR 05000461-11-009, on 03/18/11, Clinton Power Station, Routine Triennial Fire Protection Baseline Inspection
IR 05000461/201000428 October 2010IR 05000461-10-004; on 07/01/10 - 09/30/10; Clinton Power Station, Unit 1, NRC Integrated Inspection Report
ML10301033326 October 2010Interconnecting Floor Drain Impact on ECCS Safety Function for Clinton Power Station
ML1021504683 August 2010IR 05000461-10-003, on 04/01/10 - 06/30/10; Clinton Power Station, Unit 1; Flood Protection Measures, Maintenance Risk Assessments and Emergent Work Control, Operability Evaluations, Emergency Response Organization Augmentation Testing..
IR 05000461/20100024 May 2010IR 05000461-10-002; 01/01/10 - 03/31/10; Clinton Power Station, Unit 1; Fire Protection, Flood Protection Measures, Inservice Inspection Activities, Maintenance Effectiveness, and Surveillance Testing
IR 05000461/200900410 November 2009IR 05000461-09-004 on 07/01/09 - 09/30/09 for Clinton Power Station, Unit 1
ML09071033226 June 2009Issuance of Amendment Technical Specification Change TSTF-423, Risk-Informed Modification to Selected Required Action End States for BWR Plants, Using Consolidate Line Item Improvement Process
RS-05-006, Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License25 February 2005Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License
RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program29 November 2004Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program
ML0204403118 January 2002Revision to Emergency Plan Implementing Procedures
U-603276, Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included8 October 1999Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included
IR 05000461/199901130 April 1999Insp Rept 50-461/99-11 on 990408-21.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support
IR 05000461/199800327 March 1998Insp Rept 50-461/98-03 on 980123-0303.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support
U-602836, Forwards Rev 7 to Clinton Power Station Usar.Attached Clinton Power Station 10CFR50.59 Rept Identifies All Safety Evaluations for Implemented Changes Affecting USAR for Period of 950430-97063020 October 1997Forwards Rev 7 to Clinton Power Station Usar.Attached Clinton Power Station 10CFR50.59 Rept Identifies All Safety Evaluations for Implemented Changes Affecting USAR for Period of 950430-970630
ML20199G46020 October 1997Vols I,Ii & III, to CPS Integrated Sar
ML20151K01925 July 1997Insp Rept 50-461/97-11 on 970407-0523.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support