Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML22111A224 | 31 March 2022 | 2 to Updated Safety Analysis Report, Clinton Power Station Operational Requirements Manual (Orm) |
ML20105A277 | 31 March 2020 | 1 to Updated Safety Analysis Report, CPS Operational Requirements |
RS-20-028, 1 to Updated Safety Analysis Report, CPS Tsb | 31 March 2020 | 1 to Updated Safety Analysis Report, CPS Tsb |
IR 05000461/2018003 | 7 November 2018 | NRC Integrated Inspection Report 05000461/2018003 |
IR 05000461/2018002 | 3 August 2018 | NRC Integrated Inspection Report 05000461/2018002 |
IR 05000461/2017004 | 8 February 2018 | NRC Integrated Inspection Report 05000461/2017004, 07201046/2017001 and Emergency Preparedness Annual Inspection Report 05000461/2017501 |
05000461/LER-2017-010 | 5 February 2018 | Division 1 Transformer Failure Leads to Instrument Air Isolation to Containment Requiring a Manual Reactor Scram LER 17-010-00 for Clinton Power Station, Unit 1 Regarding Division 1 Transformer Failure Leads to Instrument Air Isolation to Containment Requiring a Manual Reactor Scram |
05000461/LER-2017-002 | 5 July 2017 | Failure of the Division 1 Diesel Generator Ventilation Fan Load Sequence Relay Circuit During Concurrent Maintenance of RHR Division 2 Results in an Unanalyzed Condition LER 17-002-01 for Clinton, Unit 1, Regarding Failure of the Division 1 Diesel Generator Ventilation Fan Load Sequence Relay Circuit During Concurrent Maintenance of RHR Division 2 Results in an Unanalyzed Condition |
ML17054C552 | 28 June 2017 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident |
IR 05000461/2016004 | 9 February 2017 | NRC Integrated Inspection Report and Exercise of Enforcement Discretion 05000461/2016004, 05000461/2016501 and 07201046/2016003 |
IR 05000461/2016001 | 9 May 2016 | NRC Integrated Inspection Report 05000461/2016001, January 1, 2016 Through March 31, 2016, Clinton Power Station |
IR 05000461/2015003 | 6 November 2015 | IR 05000461/2015003, on 07/01/2015 - 09/30/2015, Clinton Power Station, Unit 1; Operability Determinations and Functionality Assessments, Plant Modifications, and Follow Up of Events and Notices of Enforcement Discretion |
IR 05000461/2015008 | 23 April 2015 | IR 05000461/2015008; 03/02/2015 - 03/20/2015; Clinton Power Station; Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications |
IR 05000461/2014005 | 6 February 2015 | IR 05000461/2014005, October 1, 2014 Through December 31, 2014, Clinton Power Station, Re-Issued Integrated Inspection Report |
ML15029A719 | 29 January 2015 | IR 05000461/2014005; on 10/01/14 - 12/31/14; Clinton Power Station; Adverse Weather Protection, Identification and Resolution of Problems, and Follow-Up of Events and Notices of Enforcement Discretion |
ML14164A298 | 26 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident |
ML14065A559 | 14 May 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident |
RS-14-066, Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review | 31 March 2014 | Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review |
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems | 9 January 2014 | Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems |
ML14015A098 | 9 January 2014 | Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems |
RS-14-006, Updated Safety Analysis Report, Revision 16, CPS Operational Requirements Manual | 9 January 2014 | Updated Safety Analysis Report, Revision 16, CPS Operational Requirements Manual |
ML13325A891 | 23 December 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns |
IR 05000461/2013002 | 23 April 2013 | IR 05000461-13-002, 01/01/2013 - 03/31/2013, Clinton Power Station, Unit 1, Radiological Hazard Assessment and Exposure Controls, Identification and Resolution of Problems |
RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems | 10 January 2013 | Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems |
ML13016A315 | 10 January 2013 | Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems |
RS-13-009, Operational Requirements Manual (Orm) 2013 | 10 January 2013 | Operational Requirements Manual (Orm) 2013 |
RS-12-166, Company, LLCs 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights From. | 27 November 2012 | Company, LLCs 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights From. |
RS-12-165, 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Report | 30 October 2012 | 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Report |
ML12340A347 | 30 October 2012 | 12Q0108.60-R-001, Rev. 0, Seismic Walkdown Report |
ML12053A340 | 12 March 2012 | Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident |
ML12056A049 | 12 March 2012 | Enclosure 3 - Recommendation 2.3: Seismic |
ML12056A050 | 12 March 2012 | Enclosure 4 - Recommendation 2.3: Flooding |
IR 05000461/2011002 | 29 April 2011 | IR 05000461-11-002; 01/01/11 - 03/31/11; Clinton Power Station, Unit 1; Fire Protection, Surveillance Testing |
IR 05000461/2011009 | 25 April 2011 | Fire Protection Triennial Baseline Inspection NRC Inspection Report 05000461/2011-009 |
ML11116A141 | 25 April 2011 | IR 05000461-11-009, on 03/18/11, Clinton Power Station, Routine Triennial Fire Protection Baseline Inspection |
IR 05000461/2010004 | 28 October 2010 | IR 05000461-10-004; on 07/01/10 - 09/30/10; Clinton Power Station, Unit 1, NRC Integrated Inspection Report |
ML103010333 | 26 October 2010 | Interconnecting Floor Drain Impact on ECCS Safety Function for Clinton Power Station |
ML102150468 | 3 August 2010 | IR 05000461-10-003, on 04/01/10 - 06/30/10; Clinton Power Station, Unit 1; Flood Protection Measures, Maintenance Risk Assessments and Emergent Work Control, Operability Evaluations, Emergency Response Organization Augmentation Testing.. |
IR 05000461/2010002 | 4 May 2010 | IR 05000461-10-002; 01/01/10 - 03/31/10; Clinton Power Station, Unit 1; Fire Protection, Flood Protection Measures, Inservice Inspection Activities, Maintenance Effectiveness, and Surveillance Testing |
IR 05000461/2009004 | 10 November 2009 | IR 05000461-09-004 on 07/01/09 - 09/30/09 for Clinton Power Station, Unit 1 |
ML090710332 | 26 June 2009 | Issuance of Amendment Technical Specification Change TSTF-423, Risk-Informed Modification to Selected Required Action End States for BWR Plants, Using Consolidate Line Item Improvement Process |
RS-05-006, Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License | 25 February 2005 | Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License |
RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program | 29 November 2004 | Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program |
ML020440311 | 8 January 2002 | Revision to Emergency Plan Implementing Procedures |
U-603276, Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included | 8 October 1999 | Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included |
IR 05000461/1999011 | 30 April 1999 | Insp Rept 50-461/99-11 on 990408-21.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support |
IR 05000461/1998003 | 27 March 1998 | Insp Rept 50-461/98-03 on 980123-0303.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support |
U-602836, Forwards Rev 7 to Clinton Power Station Usar.Attached Clinton Power Station 10CFR50.59 Rept Identifies All Safety Evaluations for Implemented Changes Affecting USAR for Period of 950430-970630 | 20 October 1997 | Forwards Rev 7 to Clinton Power Station Usar.Attached Clinton Power Station 10CFR50.59 Rept Identifies All Safety Evaluations for Implemented Changes Affecting USAR for Period of 950430-970630 |
ML20199G460 | 20 October 1997 | Vols I,Ii & III, to CPS Integrated Sar |
ML20151K019 | 25 July 1997 | Insp Rept 50-461/97-11 on 970407-0523.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support |