Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML19182A345 | 19 August 2019 | Issuance of Amendment No 222 Revise Technical Specifications to Adopt TSTF Traveler TSTF-529, Clarify Use and Application Rules |
WO 19-0031, Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 | 8 August 2019 | Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 |
WO 19-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 | 11 March 2019 | Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 |
ET 19-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 | 23 January 2019 | Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 |
ML18094A115 | 28 March 2018 | Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile Protection. |
05000482/LER-2017-003 | 2 November 2017 | ARV and MSSV Tornado Missile Vulnerabilities Result in Unanalyzed Condition LER 17-003-00 for Wolf Creek Generating Station Regarding ARV and MSSV Tornado Missile Vulnerabilities Result in Unanalyzed Condition |
ML17123A202 | 26 April 2017 | Enclosure to WO 17-0042 - WCNOC EAL Technical Basis Document |
WO 17-0013, Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme | 16 March 2017 | Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme |
WO 16-0045, Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | 30 September 2016 | Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors |
NEI 99-01, Wolf Creek Nuclear Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | 30 September 2016 | Wolf Creek Nuclear Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors |
ML16279A327 | 12 September 2016 | Proposed Revised EAL Technical Basis Document |
NEI 99-01, Wolf Creek Generating Station Proposed Revised EAL Technical Basis Document | 12 September 2016 | Wolf Creek Generating Station Proposed Revised EAL Technical Basis Document |
ML112700890 | 26 August 2011 | 08-Post Examination Comments |
IR 05000482/2010002 | 4 May 2010 | IR 05000482-10-002; 01/01/2010 - 03/31/2010; Wolf Creek Generating Station; Integrated Resident and Regional Report; Fire Protection, Maintenance Effectiveness, Surveillance Testing, Event Response |
WO 10-0013, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating | 6 April 2010 | Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating |
ML100610504 | 12 March 2010 | Request for Additional Information, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources-Operating, for Note, Required Actions and Completion Times |
IR 05000482/2007005 | 12 February 2008 | IR 05000482-07-005, on 10/07/07 - 12/31/0,7, Wolf Creek Generating Station; Operability Evaluations, Postmaintenance Testing, Event Followup, and Other Activities |
ML071430367 | 9 May 2007 | Response 11, to Master List for Audit Needs of NRC Request for Additional Information Re License Renewal Application |
ML070550020 | 17 April 2007 | Tech Spec Pages for License Amendment No. 173 Adopting TSTF-372 on Limiting Condition for Operation 3.0.8, Inoperability of Snubbers |
ET 06-0053, Application for Technical Specification to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process | 15 December 2006 | Application for Technical Specification to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process |
ML053490174 | 26 April 2006 | Issuance of Amendment Extended Diesel Generator Completion Times |
ET 05-0016, Response to Request for Additional Information Regarding Extensions of AC Electrical Power Distribution Completion Time | 31 August 2005 | Response to Request for Additional Information Regarding Extensions of AC Electrical Power Distribution Completion Time |
ML042820562 | 7 October 2004 | Technical Specifications, Increasing Flexibility in Mode Restraints |
ML042080220 | 13 May 2004 | 2004-Final Operating Examination |
ML042080207 | 13 May 2004 | 05-2004 Draft Operating Examination |
ML020640596 | 4 March 2002 | Technical Specification Pages, Amendment No.143 Dated March 4, 2002 Re Missed Surveillances |
ML013530395 | 7 January 2002 | Init Exam - 12-2001 - Draft Operating Test |
ML013530398 | 7 January 2002 | Init Exam - 12-2001 - Final Operating Test |
ML20196K732 | 26 March 1999 | Proposed Tech Specs Converting to Improved Tech Specs |
ML20199A099 | 29 December 1998 | Informs That on 981202,NRC Staff Completed Insp Planning Review (Ipr) of WCGS & Advises of Planned Insp Effort Resulting from Ipr.Forwards Historical Listing of Plant Issues,Referred to Plant Issues Matrix |
ML20202E917 | 11 December 1997 | FOIA Request for Copy of All Documents in Possession,Custody & Control of NRC That Fall Into Any of Listed Categories Re Insp Rept & Nov,All Correspondence from Plant Facility & Info Concerning Fair Labor Stds Act Exempt Employees |
ML20149G152 | 17 July 1997 | Forwards NRC Operator Licensing Exam Rept (Including Completed & Graded Tests) for Tests Administered on 970415-16 |
ML20151T015 | 15 May 1997 | Proposed Tech Specs Re Response to Request for Addl Info on Conversion to Improved Tech Specs |
ML20149G229 | 14 February 1997 | Forwards Exam Outline for 970414 Scheduled Exam for Four SRO Upgrade candidates.Cross-ref Summary Page of Exam Items Ref to Safety Functions Also Encl |
ML20147C156 | 31 January 1997 | Safety Evaluation Accepting Licensee Structural Integrity & Operability |
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly | 5 August 1996 | Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly |
ML20095F886 | 13 December 1995 | Proposed TS Surveillance Requirement 4.1.3.1.3 Re Rod Drop Testing |
ML20069B568 | 24 May 1994 | Proposed Tech Specs,Incorporating Improvements in Scope & Content Endorsed by NRC in Final Policy Statement on TS Improvements for Nuclear Power Reactors,58FR39132,dtd 930722 |
IR 05000482/1993029 | 28 December 1993 | Insp Rept 50-482/93-29 on 931024-1204.Violations Noted. Major Areas Inspected:Plant Status,Operational Safety Verification,Maint & Surveillance Observations,Cold Weather Preparation,Corrective Action Followup |
ML20058K580 | 8 December 1993 | Forwards Tia,Interpretation of Reporting Requirements - 93TIA006,re Multiple Failures of safety-related Components |
ML20059M424 | 15 October 1993 | Responds to NRC Re Violations Noted in Insp Rept 50-482/93-25 on 930818.Corrective Actions:Computer Software Enhancement Initiated |
ML20044D282 | 11 May 1993 | LER 93-007-00:on 930413,determined That Surveillance Test Procedure Re RHR Sys Inservice Pump B Test Not Accomplished by 930410.Caused by Lack of Oversight of Surveillance program.Past-due Notice proceduralized.W/930511 Ltr |
ML20141M102 | 27 March 1992 | Responds to NRC Re Violations Noted in Insp Rept 50-482/91-36.Corrective Actions:Procedures Re Cold Shutdown to Hot Standby Will Be Revised to Provide Better Instructional Guidance & Step Added to Physics Testing |
ML20095J043 | 27 March 1992 | Responds to NRC Re Violations Noted in Insp Rept 50-482/91-36.Corrective Actions:Ccp Immediately Started & Pdp Secured & Control Room Operators Halted Low Power Physics Testing |
ML20029C304 | 20 March 1991 | Proposed Tech Specs 3.1.3.1 Re Movable Control Assemblies - Group Height & 3.1.3.2 Re Digital Rod Position Indication |
ML20058K371 | 15 June 1990 | Insp Rept 50-482/90-24 on 900514-18.Violation Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program,Including Changes to EPIPs & Review of Emergency Facilities |
IR 05000482/1989015 | 23 June 1989 | Insp Rept 50-482/89-15 on 890501-31.Violation Noted.Major Areas Inspected:Plant Status,Followup on Previous NRC Identified Items,Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation |
ML19341D807 | 15 January 1988 | LER 87-056-00:on 871215,one 400 Uci Sr-90/Y-90 Source Could Not Be Located.Caused by Inadequate Control of Licensed matl.Fan-Shaped Apparatuses Removed from Svc to Prevent recurrence.W/880115 Ltr |