ML19182A34519 August 2019Issuance of Amendment No 222 Revise Technical Specifications to Adopt TSTF Traveler TSTF-529, Clarify Use and Application Rules
WO 19-0031, Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 48 August 2019Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4
WO 19-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 411 March 2019Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4
ET 19-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 423 January 2019Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4
ML18094A11528 March 2018Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile Protection.
05000482/LER-2017-0032 November 2017ARV and MSSV Tornado Missile Vulnerabilities Result in Unanalyzed Condition
LER 17-003-00 for Wolf Creek Generating Station Regarding ARV and MSSV Tornado Missile Vulnerabilities Result in Unanalyzed Condition
ML17123A20226 April 2017Enclosure to WO 17-0042 - WCNOC EAL Technical Basis Document
WO 17-0013, Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme16 March 2017Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme
WO 16-0045, Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors30 September 2016Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors
NEI 99-01, Wolf Creek Nuclear Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors30 September 2016Wolf Creek Nuclear Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors
ML16279A32712 September 2016Proposed Revised EAL Technical Basis Document
NEI 99-01, Wolf Creek Generating Station Proposed Revised EAL Technical Basis Document12 September 2016Wolf Creek Generating Station Proposed Revised EAL Technical Basis Document
ML11270089026 August 201108-Post Examination Comments
IR 05000482/20100024 May 2010IR 05000482-10-002; 01/01/2010 - 03/31/2010; Wolf Creek Generating Station; Integrated Resident and Regional Report; Fire Protection, Maintenance Effectiveness, Surveillance Testing, Event Response
WO 10-0013, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating6 April 2010Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating
ML10061050412 March 2010Request for Additional Information, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources-Operating, for Note, Required Actions and Completion Times
IR 05000482/200700512 February 2008IR 05000482-07-005, on 10/07/07 - 12/31/0,7, Wolf Creek Generating Station; Operability Evaluations, Postmaintenance Testing, Event Followup, and Other Activities
ML0714303679 May 2007Response 11, to Master List for Audit Needs of NRC Request for Additional Information Re License Renewal Application
ML07055002017 April 2007Tech Spec Pages for License Amendment No. 173 Adopting TSTF-372 on Limiting Condition for Operation 3.0.8, Inoperability of Snubbers
ET 06-0053, Application for Technical Specification to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process15 December 2006Application for Technical Specification to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process
ML05349017426 April 2006Issuance of Amendment Extended Diesel Generator Completion Times
ET 05-0016, Response to Request for Additional Information Regarding Extensions of AC Electrical Power Distribution Completion Time31 August 2005Response to Request for Additional Information Regarding Extensions of AC Electrical Power Distribution Completion Time
ML0428205627 October 2004Technical Specifications, Increasing Flexibility in Mode Restraints
ML04208022013 May 20042004-Final Operating Examination
ML04208020713 May 200405-2004 Draft Operating Examination
ML0206405964 March 2002Technical Specification Pages, Amendment No.143 Dated March 4, 2002 Re Missed Surveillances
ML0135303957 January 2002Init Exam - 12-2001 - Draft Operating Test
ML0135303987 January 2002Init Exam - 12-2001 - Final Operating Test
ML20196K73226 March 1999Proposed Tech Specs Converting to Improved Tech Specs
ML20199A09929 December 1998Informs That on 981202,NRC Staff Completed Insp Planning Review (Ipr) of WCGS & Advises of Planned Insp Effort Resulting from Ipr.Forwards Historical Listing of Plant Issues,Referred to Plant Issues Matrix
ML20202E91711 December 1997FOIA Request for Copy of All Documents in Possession,Custody & Control of NRC That Fall Into Any of Listed Categories Re Insp Rept & Nov,All Correspondence from Plant Facility & Info Concerning Fair Labor Stds Act Exempt Employees
ML20149G15217 July 1997Forwards NRC Operator Licensing Exam Rept (Including Completed & Graded Tests) for Tests Administered on 970415-16
ML20151T01515 May 1997Proposed Tech Specs Re Response to Request for Addl Info on Conversion to Improved Tech Specs
ML20149G22914 February 1997Forwards Exam Outline for 970414 Scheduled Exam for Four SRO Upgrade candidates.Cross-ref Summary Page of Exam Items Ref to Safety Functions Also Encl
ML20147C15631 January 1997Safety Evaluation Accepting Licensee Structural Integrity & Operability
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly5 August 1996Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly
ML20095F88613 December 1995Proposed TS Surveillance Requirement 4.1.3.1.3 Re Rod Drop Testing
ML20069B56824 May 1994Proposed Tech Specs,Incorporating Improvements in Scope & Content Endorsed by NRC in Final Policy Statement on TS Improvements for Nuclear Power Reactors,58FR39132,dtd 930722
IR 05000482/199302928 December 1993Insp Rept 50-482/93-29 on 931024-1204.Violations Noted. Major Areas Inspected:Plant Status,Operational Safety Verification,Maint & Surveillance Observations,Cold Weather Preparation,Corrective Action Followup
ML20058K5808 December 1993Forwards Tia,Interpretation of Reporting Requirements - 93TIA006,re Multiple Failures of safety-related Components
ML20059M42415 October 1993Responds to NRC Re Violations Noted in Insp Rept 50-482/93-25 on 930818.Corrective Actions:Computer Software Enhancement Initiated
ML20044D28211 May 1993LER 93-007-00:on 930413,determined That Surveillance Test Procedure Re RHR Sys Inservice Pump B Test Not Accomplished by 930410.Caused by Lack of Oversight of Surveillance program.Past-due Notice proceduralized.W/930511 Ltr
ML20141M10227 March 1992Responds to NRC Re Violations Noted in Insp Rept 50-482/91-36.Corrective Actions:Procedures Re Cold Shutdown to Hot Standby Will Be Revised to Provide Better Instructional Guidance & Step Added to Physics Testing
ML20095J04327 March 1992Responds to NRC Re Violations Noted in Insp Rept 50-482/91-36.Corrective Actions:Ccp Immediately Started & Pdp Secured & Control Room Operators Halted Low Power Physics Testing
ML20029C30420 March 1991Proposed Tech Specs 3.1.3.1 Re Movable Control Assemblies - Group Height & 3.1.3.2 Re Digital Rod Position Indication
ML20058K37115 June 1990Insp Rept 50-482/90-24 on 900514-18.Violation Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program,Including Changes to EPIPs & Review of Emergency Facilities
IR 05000482/198901523 June 1989Insp Rept 50-482/89-15 on 890501-31.Violation Noted.Major Areas Inspected:Plant Status,Followup on Previous NRC Identified Items,Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation
ML19341D80715 January 1988LER 87-056-00:on 871215,one 400 Uci Sr-90/Y-90 Source Could Not Be Located.Caused by Inadequate Control of Licensed matl.Fan-Shaped Apparatuses Removed from Svc to Prevent recurrence.W/880115 Ltr