Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML20210M014 | 8 September 2020 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules |
ML20245E569 | 27 August 2020 | ES-401-9 |
ML20058F943 | 27 February 2020 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - License Amendment Request: Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules Revision 4 |
ML19128A133 | 6 June 2019 | Issuance of Amendments TSTF-439 Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO |
IR 05000282/2019001 | 1 May 2019 | Prarie Island Nuclear Generating Plant, Units 1 and 2 - NRC Integrated Inspection Report 05000282/2019001 and 05000306/2019001 |
IR 05000282/2017003 | 28 November 2017 | Errata - Prairie Island, Units 1 and 2 - NRC Integrated Inspection Report 05000282/2017003 and 05000306/2017003 |
ML17313A084 | 8 November 2017 | NRC Integrated Inspection Report 05000282/2017003 and 05000306/2017003 |
L-PI-17-035, License Amendment Request to Revise the Emergency Action Level (EAL) Scheme - Supplement and Response to Requests for Additional Information | 27 September 2017 | License Amendment Request to Revise the Emergency Action Level (EAL) Scheme - Supplement and Response to Requests for Additional Information |
ML17094A576 | 29 March 2017 | License Amendment Request to Revise Emergency Action Level (EAL) Scheme |
ML16285A334 | 12 October 2016 | ROP PI Frequently Asked Questions (Faqs): 15-02 |
05000282/LER-2016-004 | 21 June 2016 | 1 OF 4 LER 16-004-00 for Prairie Island, Unit 1, Regarding Missing Fire Barrier Between Fire Area (FA) 59 and 85 / Fire Hazard Analysis Drawings Do Not Match Boundary Description |
IR 05000282/2016001 | 20 April 2016 | NRC Integrated Inspection Report 05000282/2016001; 05000306/2016001 |
ML15182A033 | 16 June 2015 | Enclosure 3 - Reactor Oversight Process Task Force FAQ Log- June 17, 2015 |
ML15079A003 | 4 May 2015 | Relief Requests 1-RR-5-5 and 2-RR-5-5 for Fifth 10-Year Interval for the Inservice Inspection Program |
IR 05000282/2012003 | 9 August 2012 | IR 05000282-12-003, 05000306-12-003; 04/01/2012-06/30/2012; Prairie Island Nuclear Generating Plant, Units 1 and 2; Maintenance Risk & Emergent Work; and Event Followup |
ML12178A378 | 22 May 2012 | 2012 Prairie Island Nuclear Generating Plant Initial License Examination Proposed Written Examination |
IR 05000282/2011004 | 23 October 2011 | IR 05000282-11-004; 05000306-11-004; 07/01/2011 09/30/2011; Prairie Island Nuclear Generating Plant, Units 1 and 2; Maintenance Effectiveness, Problem Identification and Resolution, and Event Follow-up |
ML11172A020 | 27 June 2011 | Technical Specifications, Unit 1, Renewed Facility Operating License for Prairie Island Nuclear Generating Plant |
IR 05000282/2010005 | 31 January 2011 | IR 05000282-10-005, 05000306-10-005, on 10/01/2010 - 12/31/2010, Prairie Island Nuclear Generating Plant, Units 1 and 2, Operability Evaluations, Event Follow-up and Other Activities |
L-PI-09-122, Supplement to Responses to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | 24 November 2009 | Supplement to Responses to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems |
ML102120042 | 25 September 2009 | Applicant-Northard Exhibit 36 NRC Letter Re CAP Problem Idenitification and Resolution Inspection Report |
ML092680208 | 25 September 2009 | IR 05000282-09-009, 05000306-09-009, on 07/20/2009 - 08/13/2009, Prairie Island Nuclear Plant, Routine Biennial Problem Identification and Resolution Inspection |
IR 05000282/2009009 | 25 September 2009 | NSP000054-Inspection Report 05000282/2009009; 05000306/2009009 |
ML102160771 | 25 September 2009 | Intervenor-Exhibit 20-NRC Biennial Problem Identification and Resolution (Pi&R) Inspection Report (EA 06-178, ML092680208) |
IR 05000282/2009003 | 5 August 2009 | IR 05000282-09-003 and 05000306-09-003 on 04/01/2009 - 06/30/009 for Prairie Island, Units 1 and 2 |
IR 05000282/2008002 | 14 May 2008 | IR 05000282-08-002, 05000306-08-002, on 01/01/2008 - 03/31/2008, Prairie Island Nuclear Generating Plant, Units 1 & 2, Operability Evaluations, Access Control to Radiologically Significant Areas |
ML102500671 | 1 February 2008 | NRC000052-Palo Verde Nuclear Generating Station NRC Supplemental Inspection 95003 Inspection Report February 1, 2008 |
IR 05000282/2007007 | 3 August 2007 | IR 05000282-07-007 and 05000306-07-007, on 05/21/07 - 06/22/07; Prairie Island Nuclear Generating Plant, Units 1 and 2; Component Design Bases Inspection (CDBI) |
ML070460318 | 13 February 2007 | Technical Specifications, Request for Miscellaneous Technical Specification Administrative Changes |
IR 05000282/2006002 | 11 May 2006 | IR 05000282-06-002, 05000306-06-002; on 01/01/2006 - 03/31/2006; Prairie Island Nuclear Generating Plant, Units 1 and 2 |
L-PI-06-005, License Amendment Request for Miscellaneous Technical Specification Administrative Changes | 13 February 2006 | License Amendment Request for Miscellaneous Technical Specification Administrative Changes |
ML043570017 | 14 December 2004 | from NMC Re Technical Evaluation of Proposed Method of Class 3 Pipe Leak Operability Determinations |
ML042950256 | 20 October 2004 | Technical Specifications, Amendments 167 and 157, Increased Flexibility in Mode Restraints |
ML041470488 | 23 April 2004 | Items for Proposed Examination for Prairie Island Retake Examination - 2004 |
L-PI-04-009, Inservice Inspection Summary Report, Interval 3, Period 3, Refueling Outage Dates: 9-13-2003 to 10-10-2003 Fuel Cycle 21: 3-3-2002 to 10-10-2003 | 7 January 2004 | Inservice Inspection Summary Report, Interval 3, Period 3, Refueling Outage Dates: 9-13-2003 to 10-10-2003 Fuel Cycle 21: 3-3-2002 to 10-10-2003 |
ML033650404 | 23 December 2003 | Nuclear Management Company, LLC - License Amendment Regarding Adoption of Consolidated Line Item Improvement Process (CLIIP) Technical Specification Change |
ML022210043 | 26 July 2002 | Technical Specifications for License Amendment Nos. 158 and 149, Pages 1.1-1 to 3.4.13-1 (174 Pages) |
ML021550037 | 30 May 2002 | Supplement to License Amendment Request Dated 12/11/2000, Conversion to Improved Technical Specifications (ITS) |
ML020560575 | 31 January 2002 | Supplement to License Amendment Request for Conversion to Improved Technical Specifications (ITS) for Prairie Island Nuclear Generating Plant |
IR 05000282/1998007 | 5 June 1998 | Insp Repts 50-282/98-07 & 50-306/98-07 on 980329-0511. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support |
ML20247R876 | 22 May 1998 | Informs NRC of Error Made in Submittals & 1114. Corrected Info Is Submitted & New Commitments Are Being Made in Corrective Actions Sections |
ML20202C058 | 30 January 1998 | Insp Repts 50-282/97-23 & 50-306/97-23 on 971203-980113. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support |
IR 05000282/1997018 | 14 November 1997 | Insp Repts 50-282/97-18 & 50-306/97-18 on 970910-971021.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support |
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly | 5 August 1996 | Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly |
IR 05000306/1993021 | 3 January 1994 | Insp Rept 50-306/93-21 on 931206-22.Violation Noted.Major Areas Inspected:Overpressurization of Safety Injection Sys Piping,Core Alterations While Required Condition of Refueling Integrity Did Not Exist & Lockout of 4,160 Volt |
ML20065D986 | 24 September 1990 | Responds to NRC Re Violations Noted in Insp Repts 50-282/90-12 & 50-306/90-12.Corrective Actions:Procedures Governing Surveillance Schedule Changes Will Be in Place by 901031 |
ML20155A316 | 17 March 1986 | Proposed Tech Specs Reflecting Changes in Limiting Conditions for Operations & Miscellaneous Changes |