Issue date | Title | |
---|---|---|
RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency | 16 November 2023 | Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency |
RA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan | 29 September 2023 | Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan |
RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 1 | 23 August 2023 | On-Shift Staffing Analysis (Ossa), Revision 1 |
RA-22-0292, License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 4 April 2023 | License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies |
ML22349A145 | 19 December 2022 | Non-Proprietary Safety Evaluation Related to the SLRA of Oconee Nuclear Station, Units 1, 2, and 3 |
RA-22-0285, Subsequent License Renewal - Appendix E Environmental Report Supplement 2 | 7 November 2022 | Subsequent License Renewal - Appendix E Environmental Report Supplement 2 |
RA-22-0313, Emergency Action Level (EAL) Technical Basis Document, Revision 4, EAL Wallchart, Revision 3 and Alternate TSC and OSC Renovations | 27 October 2022 | Emergency Action Level (EAL) Technical Basis Document, Revision 4, EAL Wallchart, Revision 3 and Alternate TSC and OSC Renovations |
IR 05000269/2022010 | 30 June 2022 | Triennial Fire Protection Inspection Report 05000269/2022010 and 05000270/2022010 and 05000287/2022010 |
RA-22-0121, Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification of | 29 June 2022 | Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification of Co |
IR 05000269/2022001 | 4 May 2022 | Integrated Inspection Report 05000269/2022001, 05000270/2022001 and 05000287/2022001 |
RA-22-0057, License Amendment Request to Address Technical Specifications Mode Change Limitations | 31 March 2022 | License Amendment Request to Address Technical Specifications Mode Change Limitations |
ML22042B286 | 11 February 2022 | Memorandum and Order (Denying Intervention and Terminating Proceeding) (LBP-22-01) |
ML22019A244 | 18 January 2022 | Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000269/2022010, 05000270/2022010, 05000287/2022010) and Request for Information (RFI) |
ML22019A119 | 7 January 2022 | Appendix 1-A - Oconee Nuclear Station 122.21(r)(2)-(13) Submittal Requirement Checklist |
ML22019A124 | 7 January 2022 | Attachment 1: Oconee Nuclear Station, Units 1, 2 & 3, Subsequent License Renewal Application, Appendix E - HDR, Inc., 2020 Clean Water Act Documents |
ML21347A010 | 20 December 2021 | Proposed Alternative to Implement ASME Code Case OMN-26 |
ML21335A269 | 1 December 2021 | Petitioners' Response to Duke Motion to Strike Portion of Petitioners' Reply |
ML21323A160 | 19 November 2021 | Transcript of Duke Energy Carolinas, Evidentiary Hearing, November 16, 2021 |
ML21309A774 | 5 November 2021 | Petitioners' Reply to Oppositions by Duke Energy Corp. and NRC Staff to Petitioners' Hearing Request and Petition to Intervene and Waiver Petition |
IR 05000269/2021003 | 28 October 2021 | Integrated Inspection Report 05000269/2021003 and 05000270/2021003 and 05000287/2021003 |
ML21295A755 | 22 October 2021 | NRC Staff'S Answer Opposing Beyond Nuclear and the Sierra Club'S Hearing Request |
ML21295A718 | 22 October 2021 | Applicant'S Answer Opposing Request for Hearing, Petition to Intervene, and Petition for Waiver Submitted by Beyond Nuclear and Sierra Club |
ML21270A250 | 27 September 2021 | Hearing Request and Petition to Intervene by Beyond Nuclear and Sierra Club and Petition for Waiver |
RA-21-0240, Supplement to Relief Requests for Inservice Testing Plan - Sixth Interval | 19 August 2021 | Supplement to Relief Requests for Inservice Testing Plan - Sixth Interval |
IR 05000269/2021002 | 4 August 2021 | Integrated Inspection Report 05000269/2021002 and 05000270/2021002 and 05000287/2021002 |
RA-21-0169, Relief Requests for Inservice Testing Plan - Sixth Interval | 29 July 2021 | Relief Requests for Inservice Testing Plan - Sixth Interval |
RA-21-0218, Mcguire, Units 1 & 2, Oconee, Units 1, 2 & 3, H. B. Robinson, Unit 2 - Supplement to Application to Revise Tech Specs to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time Limiting Time from Discovery of Failure to Meet an LC | 16 July 2021 | Mcguire, Units 1 & 2, Oconee, Units 1, 2 & 3, H. B. Robinson, Unit 2 - Supplement to Application to Revise Tech Specs to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time Limiting Time from Discovery of Failure to Meet an LCO |
RA-19-0043, Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | 9 June 2021 | Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO |
ML21158A196 | 7 June 2021 | Application for Subsequent Renewed Operating Licenses. Part 3 of 8 |
ML21158A195 | 7 June 2021 | Application for Subsequent Renewed Operating Licenses. Part 2 of 8 |
RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan | 11 March 2021 | 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan |
IR 05000269/2020004 | 22 February 2021 | Reissue- Oconee Nuclear Station Integrated Inspection Report 05000269/2020004, 05000270/2020004, 05000287/2020004 |
ML21047A241 | 16 February 2021 | DPO-2019-001, Redacted Differing Professional Opinion (DPO) Case File (Public) |
ML21036A001 | 4 February 2021 | Integrated Inspection Report 05000269/2020004 and 05000270/2020004 and 05000287/2020004 |
IR 05000269/2020003 | 4 November 2020 | Integrated Inspection Report 05000269/2020003, 05000270/2020003, 05000287/2020003, and 07200004/2020002 |
ML20266G219 | 3 November 2020 | Regulatory Audit Report Regarding License Amendment Request to Revise the Licensing Basis for High Energy Line Breaks Outside of the Containment Building |
RA-20-0267, Proposed License Amendment Request to Revise Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of Containment Building - Responses to Request for Additional Information | 17 September 2020 | Proposed License Amendment Request to Revise Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of Containment Building - Responses to Request for Additional Information |
ML20237F435 | 4 September 2020 | Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations |
ML20189A075 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Tables |
ML20189A068 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML20181A118 | 29 June 2020 | Submittal of Revision 28 to Updated Final Safety Analysis Report, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions and 10CFR50.59 Evaluation Summary Report |
ML20189A089 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 8, Electric Power |
ML20189A095 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
ML20189A083 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards |
ML20189A074 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
ML20189A080 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML20189A092 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML20189A086 | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control |
ML20135H294 | 14 May 2020 | Final ASP Analysis - Oconee 1, 2, and 3 (LER 269-92-018) |
ML20135H293 | 14 May 2020 | Final ASP Analysis - Oconee 1, 2, and 3 (LER 269-92-008) |