 Issue dateTitle
RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency16 November 2023Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency
RA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan29 September 2023Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan
RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 123 August 2023On-Shift Staffing Analysis (Ossa), Revision 1
RA-22-0292, License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies4 April 2023License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies
ML22349A14519 December 2022Non-Proprietary Safety Evaluation Related to the SLRA of Oconee Nuclear Station, Units 1, 2, and 3
RA-22-0285, Subsequent License Renewal - Appendix E Environmental Report Supplement 27 November 2022Subsequent License Renewal - Appendix E Environmental Report Supplement 2
RA-22-0313, Emergency Action Level (EAL) Technical Basis Document, Revision 4, EAL Wallchart, Revision 3 and Alternate TSC and OSC Renovations27 October 2022Emergency Action Level (EAL) Technical Basis Document, Revision 4, EAL Wallchart, Revision 3 and Alternate TSC and OSC Renovations
IR 05000269/202201030 June 2022Triennial Fire Protection Inspection Report 05000269/2022010 and 05000270/2022010 and 05000287/2022010
RA-22-0121, Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification of29 June 2022Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification of Co
IR 05000269/20220014 May 2022Integrated Inspection Report 05000269/2022001, 05000270/2022001 and 05000287/2022001
RA-22-0057, License Amendment Request to Address Technical Specifications Mode Change Limitations31 March 2022License Amendment Request to Address Technical Specifications Mode Change Limitations
ML22042B28611 February 2022Memorandum and Order (Denying Intervention and Terminating Proceeding) (LBP-22-01)
ML22019A24418 January 2022Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000269/2022010, 05000270/2022010, 05000287/2022010) and Request for Information (RFI)
ML22019A1197 January 2022Appendix 1-A - Oconee Nuclear Station 122.21(r)(2)-(13) Submittal Requirement Checklist
ML22019A1247 January 2022Attachment 1: Oconee Nuclear Station, Units 1, 2 & 3, Subsequent License Renewal Application, Appendix E - HDR, Inc., 2020 Clean Water Act Documents
ML21347A01020 December 2021Proposed Alternative to Implement ASME Code Case OMN-26
ML21335A2691 December 2021Petitioners' Response to Duke Motion to Strike Portion of Petitioners' Reply
ML21323A16019 November 2021Transcript of Duke Energy Carolinas, Evidentiary Hearing, November 16, 2021
ML21309A7745 November 2021Petitioners' Reply to Oppositions by Duke Energy Corp. and NRC Staff to Petitioners' Hearing Request and Petition to Intervene and Waiver Petition
IR 05000269/202100328 October 2021Integrated Inspection Report 05000269/2021003 and 05000270/2021003 and 05000287/2021003
ML21295A75522 October 2021NRC Staff'S Answer Opposing Beyond Nuclear and the Sierra Club'S Hearing Request
ML21295A71822 October 2021Applicant'S Answer Opposing Request for Hearing, Petition to Intervene, and Petition for Waiver Submitted by Beyond Nuclear and Sierra Club
ML21270A25027 September 2021Hearing Request and Petition to Intervene by Beyond Nuclear and Sierra Club and Petition for Waiver
RA-21-0240, Supplement to Relief Requests for Inservice Testing Plan - Sixth Interval19 August 2021Supplement to Relief Requests for Inservice Testing Plan - Sixth Interval
IR 05000269/20210024 August 2021Integrated Inspection Report 05000269/2021002 and 05000270/2021002 and 05000287/2021002
RA-21-0169, Relief Requests for Inservice Testing Plan - Sixth Interval29 July 2021Relief Requests for Inservice Testing Plan - Sixth Interval
RA-21-0218, Mcguire, Units 1 & 2, Oconee, Units 1, 2 & 3, H. B. Robinson, Unit 2 - Supplement to Application to Revise Tech Specs to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time Limiting Time from Discovery of Failure to Meet an LC16 July 2021Mcguire, Units 1 & 2, Oconee, Units 1, 2 & 3, H. B. Robinson, Unit 2 - Supplement to Application to Revise Tech Specs to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time Limiting Time from Discovery of Failure to Meet an LCO
RA-19-0043, Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO9 June 2021Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO
ML21158A1967 June 2021Application for Subsequent Renewed Operating Licenses. Part 3 of 8
ML21158A1957 June 2021Application for Subsequent Renewed Operating Licenses. Part 2 of 8
RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan11 March 20211, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan
IR 05000269/202000422 February 2021Reissue- Oconee Nuclear Station Integrated Inspection Report 05000269/2020004, 05000270/2020004, 05000287/2020004
ML21047A24116 February 2021DPO-2019-001, Redacted Differing Professional Opinion (DPO) Case File (Public)
ML21036A0014 February 2021Integrated Inspection Report 05000269/2020004 and 05000270/2020004 and 05000287/2020004
IR 05000269/20200034 November 2020Integrated Inspection Report 05000269/2020003, 05000270/2020003, 05000287/2020003, and 07200004/2020002
ML20266G2193 November 2020Regulatory Audit Report Regarding License Amendment Request to Revise the Licensing Basis for High Energy Line Breaks Outside of the Containment Building
RA-20-0267, Proposed License Amendment Request to Revise Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of Containment Building - Responses to Request for Additional Information17 September 2020Proposed License Amendment Request to Revise Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of Containment Building - Responses to Request for Additional Information
ML20237F4354 September 2020Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations
ML20189A07529 June 20208 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Tables
ML20189A06829 June 20208 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML20181A11829 June 2020Submittal of Revision 28 to Updated Final Safety Analysis Report, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions and 10CFR50.59 Evaluation Summary Report
ML20189A08929 June 20208 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML20189A09529 June 20208 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML20189A08329 June 20208 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards
ML20189A07429 June 20208 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML20189A08029 June 20208 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML20189A09229 June 20208 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML20189A08629 June 20208 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control
ML20135H29414 May 2020Final ASP Analysis - Oconee 1, 2, and 3 (LER 269-92-018)
ML20135H29314 May 2020Final ASP Analysis - Oconee 1, 2, and 3 (LER 269-92-008)