Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML22215A1473 August 2022& Big Rock Point Plant - Update Report for Holtec Decommissioning International (HDI) Fleet Decommissioning Quality Assurance Program (DQAP) Revision 2
ML22104A07814 April 2022Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G
ML21091A1471 April 2021Annual Report for Entergy Quality Assurance Program Manual and Indian Point Energy Center Quality Assurance Program Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to
ML19094B0783 April 2019Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G
ML18099A3679 April 2018Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) (3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G
ML17109A48710 April 2017Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G
CNRO-2015-00012, Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual30 April 2015Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual
CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G25 April 2014Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G
CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G26 April 2013Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G
CNRO-2012-00003, Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G30 April 2012Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G
CNRO-2011-00006, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications13 December 2011Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications
CNRO-2011-00004, Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G29 April 2011Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G
CNRO-2010-00002, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G29 April 2010Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G
CNRO-2009-00006, Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G13 April 2009Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G
ENOC-08-00024, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(e) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G23 April 2008Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(e) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G
ML09041032215 April 2008Entergy'S Quality Assurance Program Manual, Revision 18; Effective: April 15, 2008
ENOC-07-00020, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 1615 June 2007Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 16
ML06261041915 September 200610 CFR 50.59 Report of Changes, Tests and Experiments
ML0333809751 December 2003License Amendment Request - Additional Information
ML02268037217 September 2002Part I of Rev. 10 to Big Rock Point Plant Updated Final Hazards Summary Report (Ufhsr)
ML02268044917 September 2002Part II of Rev. 10 to Big Rock Point Plant Updated Final Hazards Summary Report (Ufhsr)
ML03111044913 October 1999Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes
RIS 1999-02, Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes13 October 1999Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes
Information Notice 1999-17, Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses3 June 1999Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses
Information Notice 1999-07, Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems22 March 1999Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems
ML20198K66124 December 1998Safety Evaluation Supporting Amend 120 to License DPR-6
ML20196J8624 December 1998Discusses Three Plants,Evaluated for Consideration as Abnormal Occurrences & Other Event of Interest.Oconee & Quad Cities Plants Are Being Considered as AOs & Big Rock Point Being Considered as Other Event Interest
ML20236T66521 July 1998Provides Remaining Responses to NRC 980416 RAI Re Big Rock Plant'S Proposed Defueled Tech Specs.Proposed Defueled Tech Specs & Bases,Encl
NRC Generic Letter 1998-0414 July 1998NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i
ML20217G49423 April 1998Informs That Previous Commitments Will Not Be Retained Due to Permanent Cessation of Big Rock Point Plant Operation. Commitments Associated W/Nrc Insp Repts,Encl
ML20202G19412 February 1998Rev 7 to Updated Final Hazards Summary Rept for Big Rock Point Plant
ML20202G17312 February 1998Forwards Rev 7 to Updated Final Hazards Summary Rept for Big Rock Point Plant. W/List of Effective Pages & Index of Chapters
ML20202E66025 November 1997Summary of 971029 Meeting W/Big Rock Point in Rockville,Md Re Proposed Amend of TS to Reflect Permanent Shutdown & Defueled Condition of Plant & Proposed Exemption from 10CFR50 Emergency Planning Requirements
ML20211N73210 October 1997Requests Approval of Changes to Quality Program Description for Operational Nuclear Power Plants (CPC-2a).Discussion of Changes,Matrix Comparing Rev 18 to Proposed Rev 19a,rev 18 & Proposed Rev 19a Included
ML20211F21222 September 1997Amends Relevant Commitments That Were Made to Commission & Informs That Actions Previously Committed to Will Not Be Completed Due to Permanent Cessation of Plant Operation
Information Notice 1997-71, Inappropriate Use of 10 CFR 50.59 Regarding Reduced Seismic Criteria for Temporary Conditions22 September 1997Inappropriate Use of 10 CFR 50.59 Regarding Reduced Seismic Criteria for Temporary Conditions
Information Notice 1997-59, Fire Endurance Test Results of Versawrap Fire Barriers1 August 1997Fire Endurance Test Results of Versawrap Fire Barriers
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures9 July 1997Inadequate or Inappropriate Interim Fire Protection Compensatory Measures
IR 05000155/199700623 May 1997Insp Rept 50-155/97-06 on 970428-0502.No Violations Noted. Major Areas Inspected:Review of Vehicles Barrier Sys,Audits & Self Assessment,Testing,Maint,Security Contingency Capability & Protected Area Detection
ML20137U57411 April 1997Responds to RAI Re GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46
Information Notice 1997-07, Problems Identified During Generic Letter 89-10 Closeout Inspections6 March 1997Problems Identified During Generic Letter 89-10 Closeout Inspections
ML20135D13626 February 1997Responds to NRC Re Violations Noted in Insp Rept 50-155/96-10.Corrective Actions:On 961210 MO-7062 Declared Operable for Startup
ML20138J2313 February 1997Requests Additional Info Re GL 87-02, Verification of Seismic Adequacy of Mechanial & Electrical Equipment in Operating Reactors,Usi A-46
ML20134C94028 January 1997Forwards Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions
Information Notice 1997-01, Improper Electrical Grounding Results in Simultaneous Fires in the Control Room and the Safe-Shutdown Equipment Room8 January 1997Improper Electrical Grounding Results in Simultaneous Fires in the Control Room and the Safe-Shutdown Equipment Room
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls10 December 1996Modifications to Containment Blowout Panels Without Appropriate Design Controls
ML20134F22629 October 1996Advises That Response to Requested Actions Will Be Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, within 120 Days
ML20128M0518 October 1996Forwards Annual Rept Describing Mods Performed at Plant During 1995 & Up to mid-1996.Attachment 2 Provides Miscellaneous Changes to Procedures,Program & Tech Specs Reportable to Nrc,Per 10CFR50.59(b)(2)
ML20128L7418 October 1996Forwards Rev 6 to Updated Final Hazards Summary Rept, List of Effective Pages & Index of Chapters,Followed by Page Replacement Also Encl
Information Notice 1995-52, Fire Endurance Test Results for Electrical Raceway Fire Barrier Systems Constructed from 3M Company Interam Fire Barrier Materials14 November 1995Fire Endurance Test Results for Electrical Raceway Fire Barrier Systems Constructed from 3M Company Interam Fire Barrier Materials