Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML22215A147 | 3 August 2022 | & Big Rock Point Plant - Update Report for Holtec Decommissioning International (HDI) Fleet Decommissioning Quality Assurance Program (DQAP) Revision 2 |
ML22104A078 | 14 April 2022 | Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G |
ML21091A147 | 1 April 2021 | Annual Report for Entergy Quality Assurance Program Manual and Indian Point Energy Center Quality Assurance Program Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to |
ML19094B078 | 3 April 2019 | Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G |
ML18099A367 | 9 April 2018 | Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) (3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G |
ML17109A487 | 10 April 2017 | Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G |
CNRO-2015-00012, Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual | 30 April 2015 | Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual |
CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G | 25 April 2014 | Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G |
CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G | 26 April 2013 | Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G |
CNRO-2012-00003, Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G | 30 April 2012 | Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G |
CNRO-2011-00006, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications | 13 December 2011 | Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications |
CNRO-2011-00004, Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G | 29 April 2011 | Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G |
CNRO-2010-00002, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G | 29 April 2010 | Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G |
CNRO-2009-00006, Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G | 13 April 2009 | Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G |
ENOC-08-00024, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(e) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G | 23 April 2008 | Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(e) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G |
ML090410322 | 15 April 2008 | Entergy'S Quality Assurance Program Manual, Revision 18; Effective: April 15, 2008 |
ENOC-07-00020, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 16 | 15 June 2007 | Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 16 |
ML062610419 | 15 September 2006 | 10 CFR 50.59 Report of Changes, Tests and Experiments |
ML033380975 | 1 December 2003 | License Amendment Request - Additional Information |
ML022680372 | 17 September 2002 | Part I of Rev. 10 to Big Rock Point Plant Updated Final Hazards Summary Report (Ufhsr) |
ML022680449 | 17 September 2002 | Part II of Rev. 10 to Big Rock Point Plant Updated Final Hazards Summary Report (Ufhsr) |
ML031110449 | 13 October 1999 | Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes |
RIS 1999-02, Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes | 13 October 1999 | Relaxation of Technical Specification Requirements for PORC Review of Fire Protection Program Changes |
Information Notice 1999-17, Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses | 3 June 1999 | Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses |
Information Notice 1999-07, Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems | 22 March 1999 | Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems |
ML20198K661 | 24 December 1998 | Safety Evaluation Supporting Amend 120 to License DPR-6 |
ML20196J862 | 4 December 1998 | Discusses Three Plants,Evaluated for Consideration as Abnormal Occurrences & Other Event of Interest.Oconee & Quad Cities Plants Are Being Considered as AOs & Big Rock Point Being Considered as Other Event Interest |
ML20236T665 | 21 July 1998 | Provides Remaining Responses to NRC 980416 RAI Re Big Rock Plant'S Proposed Defueled Tech Specs.Proposed Defueled Tech Specs & Bases,Encl |
NRC Generic Letter 1998-04 | 14 July 1998 | NRC Generic Letter 1998-004: Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material i |
ML20217G494 | 23 April 1998 | Informs That Previous Commitments Will Not Be Retained Due to Permanent Cessation of Big Rock Point Plant Operation. Commitments Associated W/Nrc Insp Repts,Encl |
ML20202G194 | 12 February 1998 | Rev 7 to Updated Final Hazards Summary Rept for Big Rock Point Plant |
ML20202G173 | 12 February 1998 | Forwards Rev 7 to Updated Final Hazards Summary Rept for Big Rock Point Plant. W/List of Effective Pages & Index of Chapters |
ML20202E660 | 25 November 1997 | Summary of 971029 Meeting W/Big Rock Point in Rockville,Md Re Proposed Amend of TS to Reflect Permanent Shutdown & Defueled Condition of Plant & Proposed Exemption from 10CFR50 Emergency Planning Requirements |
ML20211N732 | 10 October 1997 | Requests Approval of Changes to Quality Program Description for Operational Nuclear Power Plants (CPC-2a).Discussion of Changes,Matrix Comparing Rev 18 to Proposed Rev 19a,rev 18 & Proposed Rev 19a Included |
ML20211F212 | 22 September 1997 | Amends Relevant Commitments That Were Made to Commission & Informs That Actions Previously Committed to Will Not Be Completed Due to Permanent Cessation of Plant Operation |
Information Notice 1997-71, Inappropriate Use of 10 CFR 50.59 Regarding Reduced Seismic Criteria for Temporary Conditions | 22 September 1997 | Inappropriate Use of 10 CFR 50.59 Regarding Reduced Seismic Criteria for Temporary Conditions |
Information Notice 1997-59, Fire Endurance Test Results of Versawrap Fire Barriers | 1 August 1997 | Fire Endurance Test Results of Versawrap Fire Barriers |
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures | 9 July 1997 | Inadequate or Inappropriate Interim Fire Protection Compensatory Measures |
IR 05000155/1997006 | 23 May 1997 | Insp Rept 50-155/97-06 on 970428-0502.No Violations Noted. Major Areas Inspected:Review of Vehicles Barrier Sys,Audits & Self Assessment,Testing,Maint,Security Contingency Capability & Protected Area Detection |
ML20137U574 | 11 April 1997 | Responds to RAI Re GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46 |
Information Notice 1997-07, Problems Identified During Generic Letter 89-10 Closeout Inspections | 6 March 1997 | Problems Identified During Generic Letter 89-10 Closeout Inspections |
ML20135D136 | 26 February 1997 | Responds to NRC Re Violations Noted in Insp Rept 50-155/96-10.Corrective Actions:On 961210 MO-7062 Declared Operable for Startup |
ML20138J231 | 3 February 1997 | Requests Additional Info Re GL 87-02, Verification of Seismic Adequacy of Mechanial & Electrical Equipment in Operating Reactors,Usi A-46 |
ML20134C940 | 28 January 1997 | Forwards Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions |
Information Notice 1997-01, Improper Electrical Grounding Results in Simultaneous Fires in the Control Room and the Safe-Shutdown Equipment Room | 8 January 1997 | Improper Electrical Grounding Results in Simultaneous Fires in the Control Room and the Safe-Shutdown Equipment Room |
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls | 10 December 1996 | Modifications to Containment Blowout Panels Without Appropriate Design Controls |
ML20134F226 | 29 October 1996 | Advises That Response to Requested Actions Will Be Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, within 120 Days |
ML20128M051 | 8 October 1996 | Forwards Annual Rept Describing Mods Performed at Plant During 1995 & Up to mid-1996.Attachment 2 Provides Miscellaneous Changes to Procedures,Program & Tech Specs Reportable to Nrc,Per 10CFR50.59(b)(2) |
ML20128L741 | 8 October 1996 | Forwards Rev 6 to Updated Final Hazards Summary Rept, List of Effective Pages & Index of Chapters,Followed by Page Replacement Also Encl |
Information Notice 1995-52, Fire Endurance Test Results for Electrical Raceway Fire Barrier Systems Constructed from 3M Company Interam Fire Barrier Materials | 14 November 1995 | Fire Endurance Test Results for Electrical Raceway Fire Barrier Systems Constructed from 3M Company Interam Fire Barrier Materials |