Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000336/2023003 | 6 November 2023 | Integrated Inspection Report 05000336/2023003 and 05000423/2023003 |
ML23188A020 | 26 July 2023 | Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML23193A857 | 28 June 2023 | 8 to Defueled Safety Analysis Report, Redacted |
ML23193A869 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems |
ML23193A906 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics |
ML23193A870 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features Systems |
ML23193A901 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML23193A871 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 5, Structures |
ML23193A897 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report |
ML23193A876 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML23193A881 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations |
ML23193A887 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 4, Reactor |
ML23193A896 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML23193A894 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
ML23193A890 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Frontmatter |
ML23193A891 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary System |
ML23145A195 | 23 May 2023 | Proposed Amendment to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report Related to Framatome Gaia Fuel |
ML22193A131 | 23 June 2022 | 5 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML22193A128 | 23 June 2022 | 5 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML22193A125 | 23 June 2022 | 5 to Updated Final Safety Analysis Report, Chapter 4, Reactor |
ML22193A080 | 23 June 2022 | 0 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations |
ML22193A075 | 23 June 2022 | 0 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML22193A068 | 23 June 2022 | 0 to Updated Final Safety Analysis Report, Chapter 5, Structures |
ML22193A067 | 23 June 2022 | 0 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features Systems |
ML22193A066 | 23 June 2022 | 0 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems |
ML22193A023 | 23 June 2022 | 7 to Defueled Safety Analysis Report |
ML22193A135 | 23 June 2022 | 5 to Updated Final Safety Analysis Report |
ML22193A136 | 23 June 2022 | 5 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML22193A141 | 23 June 2022 | 5 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics |
ML22193A132 | 23 June 2022 | 5 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report |
ML21262A001 | 9 November 2021 | Issuance of Amendment No. 280 Regarding Measurement Uncertainty Recapture Power Uprate |
ML21201A166 | 24 June 2021 | 9 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations |
ML21201A192 | 24 June 2021 | 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics |
ML21201A185 | 24 June 2021 | 4 to Updated Final Safety Analysis Report, Frontmatter |
ML21201A186 | 24 June 2021 | 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML21201A182 | 24 June 2021 | 4 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report |
ML21201A181 | 24 June 2021 | 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML21201A177 | 24 June 2021 | 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML21201A161 | 24 June 2021 | 9 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML21201A146 | 24 June 2021 | 9 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems |
ML21201A147 | 24 June 2021 | 9 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features Systems |
ML21201A150 | 24 June 2021 | 9 to Updated Final Safety Analysis Report, Chapter 5, Structures |
ML21201A174 | 24 June 2021 | 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor |
ML21201A148 | 24 June 2021 | 6 to Defueled Safety Analysis Report, Chapter 1, Introduction and General Description of Plant; Chapter 2, Site Characteristics; Chapter 3, Facility Design and Operation; Chapter 4, Radioactive Waste |
ML20324A703 | 19 November 2020 | Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate |
ML20189A206 | 16 July 2020 | Relief Request IR-4-03 Concerning Non-Code Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping |