Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
Information Notice 1991-32, Possible Flaws in Certain Piping Systems Fabricated by Associated Piping and Engineering | 15 May 1991 | Possible Flaws in Certain Piping Systems Fabricated by Associated Piping and Engineering |
Information Notice 1991-05, Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles | 30 January 1991 | Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles |
Information Notice 1990-29, Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head | 30 April 1990 | Cracking of Cladding and Its Heat-Affected Zone in the Base Metal of a Reactor Vessel Head |
Information Notice 1990-03, Malfunction of Borg-Warner Bolted Bonnet Check Valves Caused by Failure of the Swing Arm | 23 January 1990 | Malfunction of Borg-Warner Bolted Bonnet Check Valves Caused by Failure of the Swing Arm |
ML20245B890 | 21 April 1989 | License NPF-82,authorizing Operation of Core Levels Not to Exceed 2,436 Mwt |
ML20196B671 | 30 November 1988 | Amend 9 to License NPF-36,revising Attachment 3 to Plant License Re Maint & Surveillance Program for Tdi Diesel Generators |
ML20151D608 | 13 July 1988 | Rev 1 to Procedure 21.009.02, Technical Review of New or Revised Symptom Oriented Emergency Operating Procedures |
IR 05000322/1988002 | 2 June 1988 | Insp Rept 50-322/88-02 on 880221-0429.No Violations Noted. Major Areas Inspected:Plant Operations,Radiation Protection, Security,Plant Events,Maint,Surveillance,Outage Activities & Repts to NRC |
ML20196A841 | 25 January 1988 | Rev 4 to 80A8608, Inservice Insp Program Plan,General Text for Shoreham Nuclear Power Plant Unit 1 |
Information Notice 1987-64, Conviction for Falsification of Security Training Records | 22 December 1987 | Conviction for Falsification of Security Training Records |
IR 05000322/1987015 | 30 November 1987 | Insp Rept 50-322/87-15 on 870831-1023.No Violations Noted. Unresolved Item Noted.Major Areas Inspected:Plant Operations,Radiation Protection,Security,Plant Events,Maint, Surveillance,Outage Activities & Repts to NRC |
IR 05000322/1987010 | 21 August 1987 | Insp Rept 50-322/87-10 on 870713-17.Violations Noted.Major Areas Inspected:Effectiveness of Engineering Support to Plant,Maint,Training & QA |
SNRC-1366, Part 21 Rept Re 2 Inch 90 Degree Elbow Forged Steel Fittings Mfg by Std Fittings Co & Inspected by X-Ray Insp Inc. Existing Plant Documents Will Be Reviewed in Attempt to Locate Listed Identified Fittings & Completed by 870930 | 14 August 1987 | Part 21 Rept Re 2 Inch 90 Degree Elbow Forged Steel Fittings Mfg by Std Fittings Co & Inspected by X-Ray Insp Inc. Existing Plant Documents Will Be Reviewed in Attempt to Locate Listed Identified Fittings & Completed by 870930 |
ML20209D231 | 24 April 1987 | Application for Amend to License NPF-36,modifying Certain Emergency Diesel Generator License Conditions to Form Basis for Qualification of Tdi Emergency Diesel Generators Over Entire Life of Plant.Supporting Documentation Encl |
IR 05000322/1987001 | 30 March 1987 | Insp Rept 50-322/87-01 on 870101-0215.No Unacceptable Condition Observed.Major Areas Inspected:Radiation Protection,Security,Plant Events,Maint,Surveillance,Outage Activities & Repts to NRC |
ML20154A283 | 13 December 1986 | Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985 |
IR 05000322/1986017 | 22 October 1986 | Insp Rept 50-322/86-17 on 860908-12.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training |
ML20205E060 | 1 August 1986 | SER of Tdi Owners Group Program to Validate & Upgrade Quality of Tdi Diesel Generators for Nuclear Emergency Standby Svc.Technical Solution Available to Address Problem |
ML20211L109 | 24 June 1986 | Insp Rept 50-322/86-10 on 860416-0531.No Unacceptable Conditions Identified.Major Areas Inspected:Previous Insp Items,Facility Operations,Lers & Followup of IE Notices, Bulletins & Generic Ltrs |
ML20203N417 | 30 April 1986 | Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications |
ML20141D865 | 31 December 1985 | Safety Evaluation Report Related to the Operation of Shoreham Nuclear Power Station,Unit 1.Docket No. 50-322. (Long Island Lighting Company) |
Information Notice 1985-97, Jail Term for Former Contractor Employee Who Intentionally Falsified Welding Inspection Records, Attachment 1 to NRC Information Notice 1986-054 | 26 December 1985 | Jail Term for Former Contractor Employee Who Intentionally Falsified Welding Inspection Records, Attachment 1 to NRC Information Notice 1986-054 |
ML20138K824 | 31 October 1985 | Review of Design Review & Quality Revalidation Rept for Tdi Diesel Generators at Shoreham Nuclear Power Station Unit 1, Technical Evaluation Rept |
IR 05000322/1985021 | 12 August 1985 | Insp Rept 50-322/85-21 on 850409-0510.No Violation Noted. Major Areas Inspected:Allegations Re Design,Insp & Testing of Plant |
ML20132G763 | 3 July 1985 | License NPF-36 for Facility |
ML20126F104 | 14 June 1985 | Partial Initial Decision on Tdi Emergency Diesel Generators. NRR Authorized to Issue License for Low Power Testing (Up to 5% Rated Power) Upon Findings on Applicable 10CFR50.57(a) Matters.Served on 850614 |
ML20128K008 | 10 May 1985 | Rev 1 to Procedure 83A0273, Support & Snubber Inservice Exam & Testing Program Plan,Vol 1 |
ML20128J952 | 8 May 1985 | Rev 3 to Procedure 80A8608, Inservice Insp Program Plan, Vol 1. W/17 Oversize Drawings.Aperture Cards Available in PDR |
ML20117A279 | 7 May 1985 | Forwards Updated Lists of Witnesses,Exhibits & Sequence of Testimony.Related Correspondence |
ML20116P096 | 2 May 1985 | Reply Findings of Fact Re Emergency Diesel Generator Contentions.Findings That Qualified Load Does Not Encompass Cyclic & Intermittent Loads Contain Number of Significant Inaccuracies.Certificate of Svc Encl |
ML20128C201 | 19 April 1985 | Suggests Issuance of Board Notification Re Problem Concerning Tdi Diesel Air Start Sys at Facility.Cracking Apparently Caused in Svc by Improper Internal Dimensional Tolerances |
ML20100L401 | 15 April 1985 | Suffolk County & State of Ny Proposed Findings of Fact & Conclusions of Law on Emergency Diesel Generator Contentions.Certificate of Svc Encl |
ML20112A768 | 12 March 1985 | Staff Exhibit S-D-14,consisting of 850205 Joint Testimony of Sh Bush & Aj Henriksen Re Load Contentions Concerning Tdi Emergency Diesel Generators |
ML20102C219 | 1 March 1985 | Advises That Parties Have Settled Issue of Monitoring Cam Gallery Cracks in Emergency Diesel Generator 101 & 102 Blocks.Question Re Monitoring Based on Hours of Operation Can Be Addressed Further When Diesel Hearings Resume |
ML20101R414 | 30 January 1985 | Forwards List of Witnesses,Exhibits & Sequence of Testimony, Per 841224 Request.Related Correspondence |
ML20112H490 | 15 January 1985 | Testimony of Gf Dawe,Ja Notaro & Ej Youngling Re Diesel Generator Qualified Load.Related Correspondence |
ML20112H128 | 15 January 1985 | Testimony of Fg Dawe,Ja Notaro & Ej Youngling Re Suffolk County & State of Ny Contention on Tdi Diesel Generator Qualified Load.Related Correspondence |
ML20112H099 | 15 January 1985 | Addl Crankshaft Testimony of FF Pischinger,Dp Johnson & Mh Schuster.Related Correspondence |
ML20112H078 | 15 January 1985 | Addl Cylinder Block Testimony of Dp Johnson,Ca Rau, Mh Schuster,Hf Wachob & Ej Youngling Re Emergency Diesel Generator 103 Endurance Run & Results of Insps on Block Following Endurance Run.Related Correspondence |
ML20111A655 | 31 December 1984 | Review & Evaluation of Tdi Diesel Engine Reliability & Operability - Shoreham Nuclear Power Station Unit 1 |
Information Notice 1984-92, Cracking of Flywheels on Cummins Fire Pump Diesel Engines | 17 December 1984 | Cracking of Flywheels on Cummins Fire Pump Diesel Engines |
ML20100K170 | 3 December 1984 | Post-test Exam of Tdi Emergency Diesel Generator 103 on 841107-12.Related Correspondence |
ML20100G399 | 3 December 1984 | Tdi Emergency Diesel Generator 103 10 Cycle Confirmatory Test/Insp Rept |
ML20100C152 | 3 December 1984 | Reply to Joint Proposed Findings of Fact Proposed by Suffolk County & State of Ny Re Compliance W/Rules of Classification Societies.Certificate of Svc Encl |
ML20112J882 | 3 December 1984 | Proposed Findings of Fact Re Emergency Diesel Generator Contentions.Certificate of Svc Encl |
ML20100B444 | 15 November 1984 | Applicant Exhibit A-B-64,consisting of Undated Photograph of Original Emergency Diesel Generator 103 Liquid Penetrant Test for Circumferential Crack on Cross Section Through Cylinder 5 |
ML20204G961 | 7 November 1984 | Transcript of 841107 Hearing in Hauppauge,Ny.Pp 25,760- 25,980.Supporting Documentation Encl |
ML20094A851 | 5 November 1984 | Proposed Findings of Fact Re Emergency Diesel Generator Crankshaft.Certificate of Svc Encl |
ML20100N669 | 1 November 1984 | Intervenor Exhibit I-S-6,consisting of 840921 Liquid Penetrant Exam Rept |
ML20100N664 | 1 November 1984 | Intervenor Exhibit I-S-7,consisting of Deficiency Rept 2507 Dtd 841002, Re Rejectable Indications Noted on 1R438ENG 103 (Cam Galley Area).Magnetic Particle & Liquid Penetration Exam Repts Encl |